Mon Oct 9 16:59:21 2023, Shane, Jon, Update, CDS, timing chassis power cable and AI chassis testing for CyMAC
|
[Shane, Jon]
Today's CyMAC work:
Finished assembling external power supply cable for the timing
chassis (see attached image)
Also did some debugging of AA and AI chassis re: power issues. After testing voltages at various test points
on the power regulator board (TP1-TP6) in the AA chassis, it seems like it's the source of the problem. Used bench DC power supply to test, running 15V, |
Mon Apr 15 15:25:10 2024, Cynthia, Update, Interferometer Simulations, progress on simulation so far
|
|
Mon Jul 15 15:44:52 2024, Cynthia , Update, Interferometer Simulations, performed cavity scans with thermal effects and ring heater
|
|
Mon Apr 8 14:57:41 2024, Cynthia, Pooyan, Update, Interferometer Simulations, performed cavity scans for O4 O5, and coupled cavity
|
|
Wed Jan 31 14:37:26 2024, Shane, Summary, CDS, path directions for CyMAC model and parts library
|
Path to cds parts library in Matlab simulink: /usr/share/advligorts/src/src/epics/simLink. File name CDS_PARTS.mdl
Path to user models: /opt/rtcds/usercode/models,
using file name c1msc.mdl |
Fri Nov 10 14:16:04 2023, shane, Update, Cleanroom, new cleanroom zone diagram
|
since the vac system has been moved and made permanent, here's a new diagram of the cleanroom zones. The zones themselves haven't moved, but the diagram
has been updated to reflect the new set up of the cleanroom. |
Mon Aug 7 13:58:46 2023, shane, Update, CDS, internal power supply cables done for AI chassis
|
Finished assembling and installing the aLigo chassis internal power supply cables in the anti-imaging chassis today. Tested for continuity and everything
looked good. Chassis lid still secured with two temporary screws because I'm not sure what the correct size is. |
Fri Jul 28 13:39:39 2023, shane, Update, Cleanroom, full 5 zone cleanroom particle count
|
Here's the 5 zone cleanroom measurement from today. |
Tue May 7 20:34:31 2024, shane, Update, CDS, frosti MEDM screen update
|
[Luis, Shane]
Here is the updated MEDM screen, with new orientation and updated labeling to reflect the actual positions of the heater elements. Note that
indices start at T0 to be consistent with simulink model, though in the previous elog for the FROSTI layout the heater elements are labeled 1-8.
Also,
we finally learned how to take a screenshot on debian. |
Wed Aug 16 16:55:40 2023, Shane, Jon, Update, CDS, external power supply cables finished
|
All four external power supply cables for the CyMAC chassis are now assembled. Using them now to test if chassis power up correctly. |
Mon Aug 26 14:42:04 2024, Cynthia , Update, Interferometer Simulations, current status on cavity scan with effects of FROSTI
|
I used the code and arm cavity model used for previous O5 study on mirrors and HOM (the pdf of the study and the result can be found at https://dcc.ligo.org/LIGO-G2100878),
but it seems like the result I obtained is different from the study result. Since my cavity scans codes have a large portion of it relying on this code,
I will have to go over the study result and the code to make sure there is no issue with that code itself first. There are also some other updates or issued |
Mon Sep 23 15:00:41 2024, Cynthia , Update, Interferometer Simulations, corrections on assumption for O5 coating
|
The document recording ETM07 and ETM08 coating (T2300093) was discussed:
the current plume files are not necessarily correct in a way that LIGO lab
have tried to add it on uncoated ETM such as ETM07 and it does not match what the coated ETM07 would look like.
the plume should be added on top of
the uncoated ETM instead of assuming an ideal ETM. According to Garilynn, the imperfection on uncoated ETM matters.
So far the possible ETM data used |
Wed Apr 26 18:05:41 2023, Pamella, Julian, Shane, Update, Cleanroom, cleanroom particle counts and cleaning log
|
pre-cleaning particle counts:
zone 3
0.3 mu: 2494
0.5 mu: 748
1.0 mu 124
zone 4
0.3 mu: 374
0.5 mu: 41
1.0 mu: 0
3:45 pm: Started wiping
the surfaces(laser table,chamber, computer) inside the cleaning room.
4:05 pm: Finished wiped the surfaces
4:08 pm: Began vacuuming |
Wed May 31 12:16:28 2023, Shane, Update, Cleanroom, cleanroom particle counts (full 5 zone measurement)
|
Attached is the full 5 zone particle measurement for the cleanroom after this week's cleaning, 5/31/23. |
Wed Feb 7 12:43:22 2024, shane, Update, Cleanroom, cleanroom particle counts (full 5 zone measurement)
|
Here's today's full 5 zone measurement of the cleanroom. Everything is back under the requirement. |
Fri Jul 28 13:07:39 2023, Shane, Aiden , Update, Cleanroom, cleanroom cleaning and particle count 6x
|
[Aiden, Shane]
cleaning cleanroom and particle count
11:08 am: started particle count
zone 3: 0.3 u: 4198 0.5 u: 1080 1.0 u: 581
zone
4: 0.3 u: 12470.5 u: 6231.0 u: 415
11:24 am: break for removal of vac chamber insulation (pictures |
Thu Nov 9 13:57:58 2023, Shane, Luis, Aiden, Tyler, Update, Cleanroom, cleanroom cleaning and particle count
|
[Aiden, Shane, Luis, Tyler]
cleaning cleanroom and particle count
12:30 pm: Tyler and Aiden started organizing cables in cleanroom
12:35 pm: started particle count in flow bench
0.3 u: 116810.5 u: 32841.0 u: 1039
12:50 pm: started cleanroom particle count
zone 3: 0.3 |
Thu Dec 7 14:13:15 2023, Shane, Update, Cleanroom, cleanroom cleaning and particle count
|
[Aiden, Shane, Michael, Luke, Cynthia]
cleaning cleanroom and particle count
12:30 pm: ran zero count test on particle counter
12:32 pm: started particle count.
zone 3: 0.3 u: 59,488
0.5 u: 95611.0 u: 706
zone 4: 0.3 u: 77320.5 u: 19121.0 u: 290
|
Wed Jan 10 15:27:18 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count
|
[Aiden, Shane]
cleaning cleanroom and particle count
2:03 pm: changed sticky floor mats
2:05 pm: started particle count
zone 3: 0.3 u: 48630.5 u: 12051.0
u: 872
zone 4: 0.3 u: 19530.5 u: 7891.0 u: 457
2:35 |
Fri Feb 2 19:18:24 2024, shane, Update, Cleanroom, cleanroom cleaning and particle count
|
[Aiden, Shane, Luis, Luke]
cleaning cleanroom and particle count
5:10 pm: ran zero count test on particle counter
5:14 pm: started particle count
NOTE: initial counts
are significantly above allowed limit. ~10 times larger than ISO class 5 standard in the smallest size range. Realized partway through ceiling tile changes |
Wed Feb 21 11:58:30 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count
|
[Luke, Shane, Tyler]
cleaning cleanroom and particle count
11:50 am: ran zero count test on particle counter
11:55 am: started particle count
zone 3: 0.3 u: 17870.5
u: 5811.0 u: 166
zone 4: 0.3 u: 6230.5 u: 2901.0 u: 124
12:17 |
Tue Jun 25 12:34:18 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count
|
[Luke, Shane, Xuejun, Mohak, Michael, Tyler, Cynthia]
cleaning cleanroom and particle count
10:45 am: ran zero count test on particle counter
11:02 am: started particle count
zone 3: 0.3 u: 32840.5
u: 12471.0 u:332
zone 4: 0.3 u: 18290.5 u: 5811.0 u: 207
11:15 |
Tue Jun 27 12:09:37 2023, Shane, Update, Cleanroom, cleanroom 5 zone particle count measurement
|
Attached is 5 zone measurement for cleanroom particulate count. Zone 3 (in front of vacuum chamber) higher than usual, likely due to recent vac work. Slightly
above ISO class 5 standard in 1.0 micron range, measuring 997 particles/cubic meter while ISO standard is 832 particles/cubic meter in this range.
Zero
count test on particle counter performed prior to today's measurement. |
Thu Jan 18 18:06:49 2024, shane, Update, Cleanroom, cleanroom 5 zone particle count measurement
|
Here's today's full five zone measurement of the cleanroom |
Thu Jun 27 13:42:02 2024, Shane, Update, Cleanroom, cleanroom 5 zone particle count measurement
|
Here's today's 5 zone measurement of the cleanroom. We're above the limit by a bit in zone three (all three size ranges), likely as a result of the recent
work installing FROSTI, so it could probably use another focused cleaning. Everything else is below the limit. |
Thu Jul 6 13:34:48 2023, Pamella, Shane, Julian, Aiden, Update, Cleanroom, cleaning and particle count
|
[Pamella, Julian, Aiden, and Shane]
cleaning cleanroom and particle count
12:00 pm: started particle count
Zone 3: 0.3 u: 28260.5 u: 4571.0 u: 166
Zone 4: 0.3
u: 4570.5 u: 831.0 u: 41
12:17 pm: began surface check and wipedown. NOTE: found |
Wed Jul 19 14:39:19 2023, Pamella, Shane, Aiden, Update, Cleanroom, cleaning and particle count
|
[Pamella, Shane, Aiden]
cleaning cleanroom and particle count
1:10 pm: started particle count
Zone 3: 0.3 u: 2535 0.5 u: 2071.0 u: 41
Zone 4:
0.3 u: 7890.5 u: 411.0 u: 0
1:30 pm: began surface check and wipedown
1:41 pm: started vacuuming |
Fri Sep 29 11:22:33 2023, Shane, Aiden, Update, Cleanroom, cleaning and particle count
|
[Aiden, Shane]
cleaning cleanroom and particle count
10:06 am: ran zero count test on particle counter
10:07 am: started particle count
zone 3: 0.3 u: 22030.5
u: 8311.0 u: 540
zone 4: 0.3 u: 3740.5 u: 1241.0 u: 124
10:25 |
Sat Feb 11 17:09:29 2023, Shane, Update, General, clean room particle counts 2/10/23
|
Took a round of clean room counts after the latest clean of vacuum chamber on Feb 10. Used 60 second sample time, 5 samples for each of the 5 zones. Plots
attached for both occupied clean room (one person inside, attachment 1) and unoccupied clean room (empty attachment 2), as well as the raw data from the
particle counter (attachment 3). |
Fri Feb 3 13:04:04 2023, shane, Summary, General, clean room particle counts 1/25/23
|
Clean room count graphs for each zone (as of January 25, 2023) attached |
Mon Aug 19 07:11:55 2024, Cynthia, Update, Interferometer Simulations, cavity scans with FROSTI effects
|
|
Tue Feb 27 09:06:29 2024, Cynthia , Update, Interferometer Simulations, cavity scan with higher order input laser
|
I performed a few cavity scan with the inputing laser with a different mode (not pure 00). For each laser I included a graph for just plotting the order
with highest power (for example 1st order laser input the first plot only scanned for 1st order in that cavity), and I have also included a graph scanning
for order 1-10. |
Wed Oct 2 13:38:00 2024, Cynthia, Update, Interferometer Simulations, cavity scan with averaged O4 ETM coating as plume
|
|
Mon Apr 22 15:06:33 2024, Cynthia , Update, Interferometer Simulations, cavity scan update
|
[Cynthia,Pooyan]
Completed some simulations injecting 0-10th order modes. Some graphs will be used for the poster after some further titles, axis, and
range adjustments. |
Mon Jul 15 14:28:32 2024, Pooyan, Update, Interferometer Simulations, aLIGO test mass surface profiles
|
Created a Google Slides presentation to summarize all the mirror surface map information that we use for simulating interferometers.
A+ expected maps are based on correspondence with G. Billingsley. The estimate for the A+ ITMs will be to take the “as polished” data and add coating
non-uniformity to it. (T2000398) Neither of these are scaled for the precise thickness of the Ti:Ge coatings. |
Mon Jul 15 15:52:40 2024, Michael, Update, Interferometer Simulations, aLIGO locking with varying SRC mirrors and measuring mode mismatch
|
|
Mon Sep 16 15:18:59 2024, Cynthia , Update, Interferometer Simulations, a breakdown of FROSTI and thermal effects and the resulting cavity scan
|
|
Mon Jul 22 18:19:34 2024, Luke, Update, VAC, Zero length reducer stuck bolts
|
Today, I borrowed a bolt extractor drill bit from the machine shop to remove some stuck bolts from the zlr. Before starting, I laid down a sheet of aluminum
foil on the work table and wiped down all the tools I was going to use. I began by drilling a small pilot hole and then enlarged it with a 5/32 drill bit.
However, when I attempted to use the bolt extractor, it didn't grip the bolt effectively. Our bolts were too seized, causing the extractor bit to repeatedly |
Wed Oct 23 12:33:54 2024, Luke , Update, , Zernike calculation update
|
PowerPoint slides new
PowerPoint slides older |
Wed Mar 1 21:50:46 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart
|
The Linux workstation (ws2) that used to sit on the blue workbench (now inside the cleanroom) has been mounted on a mobile cart, as pictured below. This
is intended to be a clean cart that will be housed inside the cleanroom.
The cart is currently dirty and will need to be throughly wiped down (along with the computer monitor and peripherals) prior to being moved into |
Fri Mar 24 07:14:38 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart
|
The ws2 cart has been thoroughly wiped down with IPA wipes and moved inside the cleanroom. I have reconnected it to power and Ethernet (cables bundled and
ran to the server rack just outside the cleanroom). It is ready for use.
Quote:
|
Tue Feb 7 17:44:17 2023, Jon, Infrastructure, Computers, Workstation 1 (ws1) set up
|
The Linux workstation (ws1) that used to sit on the old workbench has been mounted on the new electronics bench and is now ready for use again. I upgraded
the OS to Debian 11.6 and also upgraded the CDS workstation tools. |
Thu Nov 30 13:50:32 2023, Tyler, Update, Lore, Workbench Assembly Completed
|
[Tyler, Luke, Aiden]
The workbenches are now completely assembled and put into their final places. Additionally, the tool chest has been moved.
|
Tue Jun 13 10:28:50 2023, Pamella, Update, General, Wiped and bagged the heating and cords.
|
[Pamella]
Cleaning the heater system parts.
09:13 am: Started wiping the last parts for the heater system (heating and cords).
10:18 am: Finished wiping the parts to the heater system (heating and cords). I wiped, tagged and bagged the heating and cords.
Note: In some parts looks like the silicone insulation material is having some sort of residue on the wipe so I wiped very careful this part and just for |
Wed Dec 14 17:35:41 2022, Jon, Infrastructure, Computers, Windows Laptop
|
I set up the new Windows 10 laptop (pictured below), which arrived yesterday. This laptop is intended to be used for running lightweight Windows-only
programs, such as the Thorlabs beam profiler software or the SRS RGA client. However, none of that software is installed yet.
Configuration details
As usual, the computer is configured with one shared account (username: controls) and the standard password. Note |
Tue Jun 6 16:04:46 2023, Aiden, Update, General, Water
|
Aiden went and refilled the de-ionized water to continue clean and bake batches. |
Wed Apr 12 10:53:02 2023, Aiden, Summary, General, Valve Cleaning
|
Bagged and Tagged the parts from batch 10 and placed them inside the clean room.
Then cleaned the last gate valve in liquinox for 20 minutes (10 minutes
each side). Then dried the valve, bagged, tagged, and placed it inside the clean room. |
Thu Feb 22 21:48:16 2024, Jon, Update, VAC, Vacuum vent for RGA testing of reflector
|
[Jon, Tyler, Luke, Aiden]
Summary
Following Wednesday's cleanroom cleaning [333],
we proceeded to vent the vacuum chamber, remove the heater elements and their mount structure, and install the FROSTI reflectors. The reflectors are the
final components to undergo RGA testing before the FROSTI prototype can be assembled. After installing the reflectors, we pumped the chamber |
Wed Oct 11 20:47:11 2023, Jon, Update, VAC, Vacuum upgrade begins
|
[Jon, Tyler, Aiden, Peter]
Upgrade of the UHV system to a larger turbo pump began today. After obtaining a final RGA scan in the old configuration (Aiden to post), we vented
all three volumes and proceeded to disassemble the 4.5"-diameter pump line. We completed installation of the new 6"-diameter pump line to the point where |
Fri Apr 21 00:06:43 2023, Jon, Update, VAC, Vacuum prep and installation - parts have arrived
|
The two parts needed to complete the vacuum assembly (ELOG 70) have arrived.
(10) 5/16"-24 x 1 3/4" threaded rods - for attaching the turbo pump reducing nipple to the CF 4.5" gate valve;
(1) 45 degree CF
2.75" elbow for attaching the calibrated Ar/He leak to the chamber.
I left them laying on top of the ultrasonic washer. They both need |