ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 15 of 15  Not logged in ELOG logo
ID Date Author Typedown Category Subject Text Attachments
  651   Wed Oct 8 14:45:12 2025 Xuesi MaInfrastructureVACRGA Chamber PressureRGA Chamber pressure is currently at 3.68e-4
torr.
 20251008_130141.jpg 
  662   Thu Nov 20 12:40:47 2025 Xuesi MaInfrastructureGeneralRoom 1125 Optical TableCleaned off the tapes on the optical table
with acetone. 
 1651.jpg1650.jpg 
  670   Thu Jan 22 10:10:31 2026 JonInfrastructureGeneralLab floor plansAttached are the starting and final floor
plans for the February 2026 expansion into
the Physics 1125 lab.
 Pre-Feb-2026.pngPost-Feb-2026.png 
  672   Thu Jan 22 13:18:12 2026 PooyanInfrastructureGeneralLab floor plansThe working document of tasks regarding
moving the clean room is attached. Needs
LIGO account to access and edit. 
  
  676   Thu Feb 5 11:42:47 2026 JonInfrastructureGeneralLab floor plans [Audrey, Cece, Jon, Ma, Mary, Michael,
Pooyan, Tyler, Shane] 
 We have completed the preliminary
 image.jpgimage_1.jpgimage_3.jpg 
  682   Thu Feb 12 12:25:38 2026 Xuesi MaInfrastructureGeneralLab floor plans [Cece, Ma, Mary, Pooyan, Tyler, Paul]

 We have continued the reorganization
 8x 
  689   Thu Mar 5 12:08:47 2026 PooyanInfrastructureCleanroomCleanroom HEPA fan defect[Pooyan, Ma, Mary, Tyler]

While re-installing the clean-room
HEPA fan filters, we realized that one of
 Screenshot_2026-03-05_at_10-52-30_WhisperFlow-Product-Data-and-Submittals-1788-50-Rev19.pdf.pngIMG_5591.jpeg2704.jpg2705.jpg2706.jpg 
  691   Wed Mar 11 19:38:21 2026 PooyanInfrastructureCleanroomParts and things to get after the cleanroom move
concrete Caulk to fill the drill
holes in 1119

Example [Pooyan:
I have a caulk gun and silicon caulk at home,
 8x 
  701   Sun Apr 19 15:22:08 2026 PooyanInfrastructureCleanroomHEPA fan air flow measurment[Ma, Mary, Tyler, Pooyan]
HEPA fan air flow measurements are
done with the fans sitting on their side
  
  708   Sun May 3 21:13:14 2026 PooyanInfrastructureCleanroomCleanroom HEPA fan install[Ma, Cece, Pooyan, Tyler]
We installed the repaired HEPA fans
on top of the cleanroom, and cleaned the
 1119.pdf 
  717   Mon Jun 15 22:30:09 2026 Cece OchoaInfrastructureInventoryOptics Inventory Spreadsheet of all tabletop optical parts
in 1129 (Cabinet 1) 
linked here
 
Note that a couple
 Optics_Inventory_(1).xlsxOptics_Inventory_-_Sheet1.pdf 
  718   Thu Jun 18 08:40:07 2026 MaryInfrastructureGeneralFume hood[Ma, Mary]


The tape residue on the fume hood
was cleaned using acetone; however, the acetone
 Fume_hood.pdf 
  721   Thu Jun 25 12:48:29 2026 Xuesi MaInfrastructureCleanroom    3981.jpg3982.jpg 
  729   Tue Jul 7 13:54:37 2026 Xuesi MaInfrastructureCleanroom [Shane, Joshua, Cece, Ma, Mary, Abhi, Jacob]

The clean room (1119) was re-cleaned
on Thursday (7/2). All surfaces were wiped
 IMG_20260707_133309.png2026-07-07_13-5-50_cleanroom_chart.png 
  732   Thu Jul 9 12:46:49 2026 Xuesi MaInfrastructureCleanroomCleanroom cleaning[Shane, Joshua, Cece, Ma, Mary, Abhi, Jacob]

The clean room (1119) was re-cleaned
on Tuesday (7/7). All surfaces were wiped
 2026-07-09_12-40-56_cleanroom_chart.png 
  734   Tue Jul 14 21:23:40 2026 XuesiInfrastructureCleanroomCleanroom cleaning[Joshua, Cece, Ma, Mary, Abhi, Jacob, Dhatri]

The clean room (1119) was re-cleaned
on Tuesday (7/14). A particle count measurement
 2026-07-14_21-08-30_cleanroom_chart.png 
  735   Wed Jul 15 21:53:32 2026 JoshuaInfrastructureCleanroomCleanroom cleaning[Joshua, Mary, Ma]

On Wednesday (7/15), a particle
count measurement was performed in the clean
 2026-07-20_11-22-54_cleanroom_chart.png 
  744   Mon Aug 3 12:23:03 2026 PooyanInfrastructureCDSCymac backup schedule

Backup plan for
the CyMAC machine:
  
  1   Sun Apr 10 15:39:49 2022 Rutuja GuravHowToComputer Scripts/ProgramsHowTo: Renew the Let's Encrypt SSL certificate using certbotPort 80 is kept closed by default. This
might be causing the certbot auto-renewal
cronjob to fail. Therefore we must renew
  
  2   Thu Jun 2 16:14:58 2022 JonHowToGeneralCustom conda environment on JupyterHubCross-linking instructions: How
to run a Jupyter notebook in your custom
Conda environment
  
  292   Fri Dec 15 14:03:02 2023 AidenHowToVACVacuum Chamber Opening[Aiden]

1. Turn off the RGA filament
and disconnect it.

2. Record the pressure
and then close the angle valve and gate valve
  
  555   Thu Apr 17 12:12:29 2025 LiuHowToInterferometer SimulationsPreventing Thread Contention in Multiprocessing with Finesse and Cython
    Avoiding Thread
Contention When Using Multiprocessing
  
  14   Wed Dec 14 18:34:33 2022 JonConfigurationElectronicsAdapter for 532 nm laser power supplyI installed an EU-to-US plug adapter for the
532nm laser's 9V power supply. I then re-measured
the laser's power with the correct supply
 laser_power.png 
  271   Mon Nov 20 10:10:50 2023 TylerConfigurationElectronicsRTD Logic/Schematic Diagrams
Below are a basic diagram of what the
RTD measurement circuit logically looks like
and an example schematic of the actual wiring.
 FIN_RTD_circuit.pngSample_Circuit_Schematic.png 
  298   Fri Dec 29 16:02:27 2023 JonConfigurationElectronicsRTD Readout ChassisThe custom front and rear panels for the
RTD readout chassis arrived last Friday.
I installed them in the chassis frame to
 front.jpegrear.jpegoverhead.jpeg 
  300   Tue Jan 9 12:08:59 2024 TylerConfigurationElectronicsRTD Readout Chassis Update
Below is the current state of the RTD
readout chassis wiring. Initial continuity
tests seem good, will run through one more
 IMG_8105.jpg 
  305   Tue Jan 16 12:20:21 2024 TylerConfigurationElectronicsRTD Readout Chassis Update 2
I performed another continuity test on
the RTD chassis wiring, and everything seems
to be set up correctly. The chassis should
 IMG_8146.jpgIMG_8147.jpg 
  323   Tue Feb 13 11:54:45 2024 TylerConfigurationFLIRIn-Air Optical Test Configuration
Below is the proposed schematic for FROSTI
optical testing, chosen so enough space is
allotted for prototype assembly.
 In-air_optical_test_sketch.png 
  451   Wed Oct 2 10:31:46 2024 Xuesi MaConfiguration Group Meeting Slides 10/2/2024
Group Meeting slides for Non-deterministic
Heater Response.
 Group_Meeting_10_2.pdf 
  517   Tue Feb 18 11:19:13 2025 Luke ConfigurationVACRepositioning of the lid's temperature probeBefore the recent bake I slightly repositioned
the temperature probe on the lid from beside
the heater tape to under the heater tape.
  
  570   Tue May 6 12:25:03 2025 TylerConfigurationCDSCymac ADC CSD measurementAn initial measurement of the cymbal ADC CSD
is attached below. As of now, it seems that
the sensitivity limit is roughly the same
 cymac_adc_rin_v1.pdf 
ELOG V3.1.3-7933898