  297   Wed Dec 20 10:33:34 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129Update: I
have completed permanent routing of the electrical
cables. I also ran the ultrasonic washer's
  
  303   Mon Jan 15 22:29:34 2024 JonInfrastructureGeneralCabinet installation & lab clean-up completed[Jon, Tyler, Aiden, Shane, Pooyan, Michael,
Cynthia, Luke]
On Wednesday, we completed long list
 1129.png1119.png 
  330   Tue Feb 20 08:01:30 2024 JonInfrastructureGeneralPower and network equipment installed in 1129 rack[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On
Thursday we installed the power conditioning/distribution
equipment and networking equipment in the
 IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg 
  339   Sat Feb 24 08:53:38 2024 JonInfrastructureComputersMatlab upgraded to 2023b on ChimayI upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me
  
  377   Mon Jun 17 11:47:46 2024 LiuInfrastructureGeneralTemporary cooling units for the labsBelow are the temporary cooling units installed
last week in labs 1119 and 1129. They are
the temp. replacement for the building AC
 1119.jpg1129.jpg 
  379   Thu Jun 20 18:01:11 2024 JonInfrastructureComputersNew workstation ws3 in 1129I have repurposed a spare Intel NUC to serve
as the first of two planned workstations
in 1129. Today I set it up with a fresh installation
  
  382   Mon Jun 24 21:38:25 2024 PooyanInfrastructureComputersComputer server changes in 1119 and 1129[Jon, Pooyan, Tyler]
 
A few computer machine changes have
 IMG_6889.jpgIMG_6890.jpg 
  385   Wed Jun 26 15:33:41 2024 JonInfrastructureComputersNew workstation ws3 in 1129
Set-up of the first CDS workstation for
1129, ws3, is complete and the machine is
ready for use. The login credentials are
 IMG_1368.jpg 
  402   Thu Jul 11 21:01:37 2024 JonInfrastructureGeneralCable tray installed in 1129Today I installed a 10' cable tray in 1129,
for permanently routing Ethernet lines to
the workstations. It is securely bolted to
 IMG_1395.pngIMG_1396.png 
  412   Fri Jul 26 17:25:42 2024 JonInfrastructureComputersNew workstation ws4 installed in 1129Today I installed the second desktop workstation
in 1129. The new machine is an Intel NUC13ANHi5,
with a 12-Core Intel i5-1340P CPU, 32GB DDR4
 ws4.jpg 
  418   Tue Jul 30 07:42:47 2024 JonInfrastructureGeneralCable tray installed in 1119Yesterday I installed another 5' cable tray
in 1119, for permanently routing Ethernet
lines to the L-bench. It is securely bolted
 cable_tray_1119.jpg 
  437   Mon Sep 9 14:27:36 2024 PooyanInfrastructureComputersChimay backup attemptOne ongoing work is to make all lab machines
automatically backed-up on Scribe on a daily
basis. The updates should be boatable and
  
  578   Thu May 15 12:03:41 2025 Xuesi MaInfrastructureElectronicsNoticeAll Sorensen power supplies are turned
off. The Cymac system is down (All Chassis
are down)
  
  579   Mon May 19 10:59:14 2025 Xuesi MaInfrastructure  

  Status Update


 Previous Status:
  
  580   Wed May 21 14:40:38 2025 Xuesi MaInfrastructureCleanroomCleanroom Temperature
    Date and Time:
Around 2:20 PM on May 21, 2025
    Location and Temperature:
 20250521_142051.jpg20250521_142220.jpg 
  589   Tue Jun 3 13:16:53 2025 Xuesi MaInfrastructure  
    Date and Time:
Around 3:50 PM on June 2, 2025
    Location and Temperature:
 928.jpg929.jpg931.jpg930.jpg932.jpg 
  613   Tue Jul 15 11:47:53 2025 Xuesi MaInfrastructure  
    Date and Time:
Around 4:50 PM on July 1, 2025
    Location and Temperature:
 20250701_165118.jpg20250701_165200.jpg20250701_165329.jpg20250701_165246.jpg 
  640   Tue Sep 2 18:33:38 2025 LiuInfrastructureGeneralNew lab room 1125 layout and measurementAction items for facilities
 

Ceiling lights replacement
Fume
 1125.pdf 
  651   Wed Oct 8 14:45:12 2025 Xuesi MaInfrastructureVACRGA Chamber PressureRGA Chamber pressure is currently at 3.68e-4
torr.
 20251008_130141.jpg 
  662   Thu Nov 20 12:40:47 2025 Xuesi MaInfrastructureGeneralRoom 1125 Optical TableCleaned off the tapes on the optical table
with acetone. 
 1651.jpg1650.jpg 
  670   Thu Jan 22 10:10:31 2026 JonInfrastructureGeneralLab floor plansAttached are the starting and final floor
plans for the February 2026 expansion into
the Physics 1125 lab.
 Pre-Feb-2026.pngPost-Feb-2026.png 
  672   Thu Jan 22 13:18:12 2026 PooyanInfrastructureGeneralLab floor plansThe working document of tasks regarding
moving the clean room is attached. Needs
LIGO account to access and edit. 
  
  676   Thu Feb 5 11:42:47 2026 JonInfrastructureGeneralLab floor plans [Audrey, Cece, Jon, Ma, Mary, Michael,
Pooyan, Tyler, Shane] 
 We have completed the preliminary
 image.jpgimage_1.jpgimage_3.jpg 
  682   Thu Feb 12 12:25:38 2026 Xuesi MaInfrastructureGeneralLab floor plans [Cece, Ma, Mary, Pooyan, Tyler, Paul]

 We have continued the reorganization
 8x 
  689   Thu Mar 5 12:08:47 2026 PooyanInfrastructureCleanroomCleanroom HEPA fan defect[Pooyan, Ma, Mary, Tyler]

While re-installing the clean-room
HEPA fan filters, we realized that one of
 Screenshot_2026-03-05_at_10-52-30_WhisperFlow-Product-Data-and-Submittals-1788-50-Rev19.pdf.pngIMG_5591.jpeg2704.jpg2705.jpg2706.jpg 
  691   Wed Mar 11 19:38:21 2026 PooyanInfrastructureCleanroomParts and things to get after the cleanroom move
concrete Caulk to fill the drill
holes in 1119

Example [Pooyan:
I have a caulk gun and silicon caulk at home,
 8x 
  701   Sun Apr 19 15:22:08 2026 PooyanInfrastructureCleanroomHEPA fan air flow measurment[Ma, Mary, Tyler, Pooyan]
HEPA fan air flow measurements are
done with the fans sitting on their side
  
  708   Sun May 3 21:13:14 2026 PooyanInfrastructureCleanroomCleanroom HEPA fan install[Ma, Cece, Pooyan, Tyler]
We installed the repaired HEPA fans
on top of the cleanroom, and cleaned the
 1119.pdf 
  717   Mon Jun 15 22:30:09 2026 Cece OchoaInfrastructureInventoryOptics Inventory Spreadsheet of all tabletop optical parts
in 1129 (Cabinet 1) 
linked here
 
Note that a couple
 Optics_Inventory_(1).xlsxOptics_Inventory_-_Sheet1.pdf 
  718   Thu Jun 18 08:40:07 2026 MaryInfrastructureGeneralFume hood[Ma, Mary]


The tape residue on the fume hood
was cleaned using acetone; however, the acetone
 Fume_hood.pdf 
  721   Thu Jun 25 12:48:29 2026 Xuesi MaInfrastructureCleanroom    3981.jpg3982.jpg 
  729   Tue Jul 7 13:54:37 2026 Xuesi MaInfrastructureCleanroom [Shane, Joshua, Cece, Ma, Mary, Abhi, Jacob]

The clean room (1119) was re-cleaned
on Thursday (7/2). All surfaces were wiped
 IMG_20260707_133309.png2026-07-07_13-5-50_cleanroom_chart.png 
  732   Thu Jul 9 12:46:49 2026 Xuesi MaInfrastructureCleanroomCleanroom cleaning[Shane, Joshua, Cece, Ma, Mary, Abhi, Jacob]

The clean room (1119) was re-cleaned
on Tuesday (7/7). All surfaces were wiped
 2026-07-09_12-40-56_cleanroom_chart.png 
  734   Tue Jul 14 21:23:40 2026 XuesiInfrastructureCleanroomCleanroom cleaning[Joshua, Cece, Ma, Mary, Abhi, Jacob, Dhatri]

The clean room (1119) was re-cleaned
on Tuesday (7/14). A particle count measurement
 2026-07-14_21-08-30_cleanroom_chart.png 
  735   Wed Jul 15 21:53:32 2026 JoshuaInfrastructureCleanroomCleanroom cleaning[Joshua, Mary, Ma]

On Wednesday (7/15), a particle
count measurement was performed in the clean
 2026-07-20_11-22-54_cleanroom_chart.png 
  744   Mon Aug 3 12:23:03 2026 PooyanInfrastructureCDSCymac backup schedule

Backup plan for
the CyMAC machine:
  
  755   Wed Oct 21 22:26:02 2026 PooyanInfrastructureComputersSystem updatesWith two
severe PHP vulnerabilities discovered
earlier today, I updated some of our internet-facing
  
  757   Fri Oct 30 12:37:57 2026 Xuesi MaInfrastructureCleanroomHEPA Fan flow rate remeasurement[Ma, Shane, Michael]
HEPA fan air flow measurements are
done with the fans sitting on their side
  
  763   Fri Nov 6 10:17:04 2026 ShaneInfrastructureCleanroomCeiling Fan Flow Rate Tests



[Shane,
Ma, Mary, Cece]


We've finished 6-pt
flow rate tests for all four cleanroom ceiling
 Flow_Rate_Tests_11_5_26.pdf6pt_flow_rate_setup_neat.jpeg 
  1   Sun Apr 10 15:39:49 2022 Rutuja GuravHowToComputer Scripts/ProgramsHowTo: Renew the Let's Encrypt SSL certificate using certbotPort 80 is kept closed by default. This
might be causing the certbot auto-renewal
cronjob to fail. Therefore we must renew
  
  2   Thu Jun 2 16:14:58 2022 JonHowToGeneralCustom conda environment on JupyterHubCross-linking instructions: How
to run a Jupyter notebook in your custom
Conda environment
  
  292   Fri Dec 15 14:03:02 2023 AidenHowToVACVacuum Chamber Opening[Aiden]

1. Turn off the RGA filament
and disconnect it.

2. Record the pressure
and then close the angle valve and gate valve
  
  555   Thu Apr 17 12:12:29 2025 LiuHowToInterferometer SimulationsPreventing Thread Contention in Multiprocessing with Finesse and Cython
    Avoiding Thread
Contention When Using Multiprocessing
  
  14   Wed Dec 14 18:34:33 2022 JonConfigurationElectronicsAdapter for 532 nm laser power supplyI installed an EU-to-US plug adapter for the
532nm laser's 9V power supply. I then re-measured
the laser's power with the correct supply
 laser_power.png 
  271   Mon Nov 20 10:10:50 2023 TylerConfigurationElectronicsRTD Logic/Schematic Diagrams
Below are a basic diagram of what the
RTD measurement circuit logically looks like
and an example schematic of the actual wiring.
 FIN_RTD_circuit.pngSample_Circuit_Schematic.png 
  298   Fri Dec 29 16:02:27 2023 JonConfigurationElectronicsRTD Readout ChassisThe custom front and rear panels for the
RTD readout chassis arrived last Friday.
I installed them in the chassis frame to
 front.jpegrear.jpegoverhead.jpeg 
  300   Tue Jan 9 12:08:59 2024 TylerConfigurationElectronicsRTD Readout Chassis Update
Below is the current state of the RTD
readout chassis wiring. Initial continuity
tests seem good, will run through one more
 IMG_8105.jpg 
  305   Tue Jan 16 12:20:21 2024 TylerConfigurationElectronicsRTD Readout Chassis Update 2
I performed another continuity test on
the RTD chassis wiring, and everything seems
to be set up correctly. The chassis should
 IMG_8146.jpgIMG_8147.jpg 
  323   Tue Feb 13 11:54:45 2024 TylerConfigurationFLIRIn-Air Optical Test Configuration
Below is the proposed schematic for FROSTI
optical testing, chosen so enough space is
allotted for prototype assembly.
 In-air_optical_test_sketch.png 
  451   Wed Oct 2 10:31:46 2024 Xuesi MaConfiguration Group Meeting Slides 10/2/2024
Group Meeting slides for Non-deterministic
Heater Response.
 Group_Meeting_10_2.pdf 