ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 14 of 15  Not logged in ELOG logo
Entry  Mon Mar 6 15:32:58 2023, Jon, Infrastructure, General, Cabinet installation completed IMG_0088.jpgIMG_0089.jpg
Entry  Wed Mar 22 12:16:20 2023, Jon, Infrastructure, Cleanroom, Experimenting with HEPA fan speeds 
    Reply  Fri Mar 24 07:14:38 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart 
Entry  Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced 
    Reply  Tue May 9 15:49:20 2023, Jon, Infrastructure, VAC, Permanent cable routing 
Entry  Tue May 9 20:55:12 2023, Jon, Infrastructure, VAC, Calibrated Ar leak rate VTI-Calibrated-Ar-Leak.jpeg
Entry  Sun May 14 15:50:48 2023, Cao, Infrastructure, Computers, High resolution display of logrus machine 
Entry  Tue Jun 13 21:08:46 2023, Pamella, Infrastructure, VAC, Heater system - Installation IMG_7563.jpegIMG_7561.jpeg
Entry  Tue Jun 20 22:14:24 2023, Pamella, Cao, Infrastructure, VAC, Short term testing of vacuum heater controller units 
Entry  Wed Jun 21 20:25:05 2023, Cao, Infrastructure, VAC, Vacuum chamber bake attempt 1 6x
    Reply  Tue Jun 27 21:47:56 2023, Jon, Infrastructure, VAC, Vacuum chamber bake attempt 1 IMG_0256.pngIMG_0257.pngIMG_0254.png
Entry  Wed Jun 28 15:58:56 2023, Shane, Cao, Infrastructure, VAC, Power trip problem remains, source of smoke is insulation Pumpline_afterRemoveInsul.jpgRGAline_afterRemoeInsul.jpgMeltedInsulation1.jpgMeltedInsulation1.jpgMeltedInsulation2.jpg
Entry  Thu Jun 29 18:27:26 2023, Jon, Cao, Infrastructure, VAC, Vacuum bake attempt 3: success! NewInsulation.pngBypassLineInsulation.jpg
Entry  Mon Jul 3 14:32:24 2023, Cao, Infrastructure, VAC, Cooling down vacuum chamber 
Entry  Mon Jul 3 16:26:21 2023, Cao, Infrastructure, DAQ, Access and control Red Pitaya remotely and run it on local machine 
Entry  Wed Jul 5 15:46:47 2023, Aiden, Cao, Infrastructure, VAC, Vacuum Chamber Baking Update bake1_230705.png
Entry  Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables IMG_0299.jpg
Entry  Sun Dec 17 21:04:15 2023, Jon, Infrastructure, Clean & Bake, Clean and bake lab migrated to 1129 IMG_0781.pngIMG_0782.png
    Reply  Wed Dec 20 10:33:34 2023, Jon, Infrastructure, Clean & Bake, Clean and bake lab migrated to 1129 
Entry  Mon Jan 15 22:29:34 2024, Jon, Infrastructure, General, Cabinet installation & lab clean-up completed 1129.png1119.png
    Reply  Tue Feb 20 08:01:30 2024, Jon, Infrastructure, General, Power and network equipment installed in 1129 rack IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg
Entry  Sat Feb 24 08:53:38 2024, Jon, Infrastructure, Computers, Matlab upgraded to 2023b on Chimay 
Entry  Mon Jun 17 11:47:46 2024, Liu, Infrastructure, General, Temporary cooling units for the labs 1119.jpg1129.jpg
Entry  Thu Jun 20 18:01:11 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129 
Entry  Mon Jun 24 21:38:25 2024, Pooyan, Infrastructure, Computers, Computer server changes in 1119 and 1129 IMG_6889.jpgIMG_6890.jpg
    Reply  Wed Jun 26 15:33:41 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129 IMG_1368.jpg
Entry  Thu Jul 11 21:01:37 2024, Jon, Infrastructure, General, Cable tray installed in 1129 IMG_1395.pngIMG_1396.png
Entry  Fri Jul 26 17:25:42 2024, Jon, Infrastructure, Computers, New workstation ws4 installed in 1129 ws4.jpg
    Reply  Tue Jul 30 07:42:47 2024, Jon, Infrastructure, General, Cable tray installed in 1119 cable_tray_1119.jpg
Entry  Mon Sep 9 14:27:36 2024, Pooyan, Infrastructure, Computers, Chimay backup attempt 
Entry  Thu May 15 12:03:41 2025, Xuesi Ma, Infrastructure, Electronics, Notice 
Entry  Mon May 19 10:59:14 2025, Xuesi Ma, Infrastructure, ,  
Entry  Wed May 21 14:40:38 2025, Xuesi Ma, Infrastructure, Cleanroom, Cleanroom Temperature 20250521_142051.jpg20250521_142220.jpg
Entry  Tue Jun 3 13:16:53 2025, Xuesi Ma, Infrastructure, ,  928.jpg929.jpg931.jpg930.jpg932.jpg
Entry  Tue Jul 15 11:47:53 2025, Xuesi Ma, Infrastructure, ,  20250701_165118.jpg20250701_165200.jpg20250701_165329.jpg20250701_165246.jpg
Entry  Tue Sep 2 18:33:38 2025, Liu, Infrastructure, General, New lab room 1125 layout and measurement 1125.pdf
Entry  Wed Oct 8 14:45:12 2025, Xuesi Ma, Infrastructure, VAC, RGA Chamber Pressure 20251008_130141.jpg
Entry  Thu Nov 20 12:40:47 2025, Xuesi Ma, Infrastructure, General, Room 1125 Optical Table 1651.jpg1650.jpg
Entry  Thu Jan 22 10:10:31 2026, Jon, Infrastructure, General, Lab floor plans Pre-Feb-2026.pngPost-Feb-2026.png
    Reply  Thu Jan 22 13:18:12 2026, Pooyan, Infrastructure, General, Lab floor plans 
    Reply  Thu Feb 5 11:42:47 2026, Jon, Infrastructure, General, Lab floor plans image.jpgimage_1.jpgimage_3.jpg
    Reply  Thu Feb 12 12:25:38 2026, Xuesi Ma, Infrastructure, General, Lab floor plans 8x
Entry  Thu Mar 5 12:08:47 2026, Pooyan, Infrastructure, Cleanroom, Cleanroom HEPA fan defect Screenshot_2026-03-05_at_10-52-30_WhisperFlow-Product-Data-and-Submittals-1788-50-Rev19.pdf.pngIMG_5591.jpeg2704.jpg2705.jpg2706.jpg
Entry  Wed Mar 11 19:38:21 2026, Pooyan, Infrastructure, Cleanroom, Parts and things to get after the cleanroom move 8x
Entry  Sun Apr 19 15:22:08 2026, Pooyan, Infrastructure, Cleanroom, HEPA fan air flow measurment 
Entry  Sun May 3 21:13:14 2026, Pooyan, Infrastructure, Cleanroom, Cleanroom HEPA fan install 1119.pdf
Entry  Mon Jun 15 22:30:09 2026, Cece Ochoa, Infrastructure, Inventory, Optics Inventory  Optics_Inventory_(1).xlsxOptics_Inventory_-_Sheet1.pdf
Entry  Thu Jun 18 08:40:07 2026, Mary, Infrastructure, General, Fume hood Fume_hood.pdf
Entry  Thu Jun 25 12:48:29 2026, Xuesi Ma, Infrastructure, Cleanroom,  3981.jpg3982.jpg
Entry  Sun Apr 10 15:39:49 2022, Rutuja Gurav, HowTo, Computer Scripts/Programs, HowTo: Renew the Let's Encrypt SSL certificate using certbot 
ELOG V3.1.3-7933898