   Today we started re-configuring the vacuum chamber components.  
 Particle count 
-  10:45 am : Starting the particle count in the clean room. 
 
-  11:13 am : Finished the particle count in the clean room. 
 
 
-   Zone 3 :
 
-  0.3 u: 2535 
 
-  0.5 u: 1413 
 
-  1.0 u: 789 
 
 
 
-   Zone 4 :
 -  0.3 u: 457  
 
     -  0.5 u: 290 
 
     -  1.0 u: 207
    
 Starting the reconfiguration.
 
-  11:21 am: Started removing up-to-air valve 
 
-  11:30 am: Finished removing up-to-air valve. 
 
-  11:33 am: Started removing calibrated Ar Leak  and the elbow. 
 
-  11:35 am: Finished removing calibrated Ar Leak  and started assembling the up-to-air valve. 
 
-  11:47 am: Finished assembling up-to-air valve. 
 
-  11:48 am: Started removing magnetron gauge. 
 
-  11:55 am: Finished removing magnetron gauge. 
 
-  11:57 am: Started installing the elbow and calibrated Ar Leak and started removing the RGA probe  
 
-  12:13 pm: Finished installing the elbow and calibrated Ar Leak. 
 
-  12:20 pm: Break for lunch.
 
-  01:25 pm: Come back from lunch break. 
 
-  01:30 pm: Started removing RGA line. 
 
-  01:39 pm: Finished removing RGA line. 
 
-  01:39 pm: Started removing gate valve [RGA line] and finished removing gate valve. 
 
-  02:00 pm: Started installing gate valve in the new position. 
 
-  02:08 pm: Fished installing gate valve [RGA line]. 
 
-  02:09 pm: Checked the screws in the elbow to gate valve. [RGA line].
 
-  02:28 pm: Finished checking the screws in the elbow to gate valve [RGA line].
 
-  02:29 pm: Started installing RGA line. 
 
-  02:39 pm: Finished installing RGA line. 
 
-  02:50 pm: Started installing magnetron gauge.(In this part we assembled gauge with the used gasket) 
 
-  03:02 pm: Finished installing magnetron gauge. 
 
-  03:04 pm: Started installing RGA probe [RGA line]. 
 
-  03:13 pm: Finished installing RGA probe [RGA line]. 
 
-  03:15 pm: Connected the cables to the magnetron gauge. 
 
-  03:20 pm: Started the testing in the vacuum chamber.
 
-  04:30 pm: Started installing the RGA 200 and connected the cables (power cable and DB9 cable).
 
-  04:52 pm: Finished installing the RGA 200 and connected the cables (power cable and DB9 cable).
 
-  04:53 pm: Started testing the RGA connections. Logrus is able to recognize and connect to RGA unit. We are leaving the turbo pump on for a few hours before checking back for pressure readouts.
 
-  05:00 pm : Starting the particle count in the clean room.
 
-   Zone 3 :
 
-  0.3 u: 2244  
 
-  0.5 u: 997  
 
-  1.0 u: 207  
 
 
 
-   Zone 4 :
 
-  0.3 u: 2993 
 
-  0.5 u: 1579 
 
-  1.0 u: 498 
     
  
-  05:30 pm : Finished the particle count in the clean room. 
 
-  05:34  pm: Test pressure readout from the gauges.
-   Channel 1 : 1.06E-5 mbar     
 
-   Channel 2 :8.89E-6 mbar 
 
-   Channel 3 :5.0E-4 mbar 
  
 
 
-  05:59  pm: Test pressure readout from the gauges.
-   Channel 1:  9.09E-6 mbar     
 
-   Channel 2: 7.75E-6 mbar 
  
-   Channel 3: 5.0E-4 mbar 
  
 
 
 
    | 
 | 
 
 |