ID Date Author Type Category Subject
  704   Fri Apr 24 23:55:50 2026 DhatriSummaryInterferometer Simulations 

[Sidd, Pooyan, Dhatri]
In the group meeting on 04/23/26, we discussed with Jon why we weren’t getting expected values for PRC Gain while running the current LLO model; specifically if there is mode mismatch. Worked more on this today.
  • Looked at the mode mismatch using cavity_mismatch_table().
  • Compared these finesse_ligo factory model mismatch values with those of the aLIGO katscript model.
  • The latter does not have the cavity_mismatch_table(), looked at both models' mismatch values using cavity_mismatch().
  • Ascertained that there is less mode mismatch in the katscript model (~10^-2) as compared to the factory model (~10^-6).
  • Mismatch values are starkly different, not just for (PRC, XARM) but also for others like (OMC, XARM).
Is the issue with the locking procedure?
  • Analysed the locking process for factory model and katscript model to find minor differences in the order.
  • Tried applying the katscript locking function to the factory model and still seem to get the same results. (to recheck)
  • Further directions/steps:
    • To compare radii of curvature of the optics in both models
    • Check q parameter at PRM and assign it to the laser to run the model
    • Generate powerup plots again and check against previous ones (with and without ring heater)
  •   703   Thu Apr 23 12:47:05 2026 CynthiaUpdateInterferometer SimulationsO5 Test mass
    Attachment 1: 4_23_26.pdf
    4_23_26.pdf
      702   Thu Apr 23 11:32:48 2026 Cece OchoaUpdateInterferometer SimulationsCE Cavity Design Update
    Update on CE Mirror RoC, simulation with FROSTI and cavity locking View Presentation
      701   Sun Apr 19 15:22:08 2026 PooyanInfrastructureCleanroomHEPA fan air flow measurment

    [Ma, Mary, Tyler, Pooyan]

    HEPA fan air flow measurements are done with the fans sitting on their side in the lab, and the anemometer being 24in away from the filter face of the fan. Per company's documents, we need to replace the filter if the air flow velocity drops under 38-45 fpm for the medium settings.)
     

    S/N Min Avg Max
    P188642-2 118 121 125
    118 119 125
    P188642-3 53 79 88
    43 48 53
    P188642-12 43 61 88
    15 42 53
    P188642-1 80 83 88
    43 49 80

    All numbers are in fpm unit. The measurement for each unit is done twice in front of the fan positions.  

      700   Thu Apr 16 14:04:46 2026 MaryUpdateInterferometer SimulationsBeam position optimization algorithm
    Attachment 1: beam_position_optimization.pdf
    beam_position_optimization.pdf
      699   Thu Apr 16 13:14:42 2026 TylerUpdateTCSA# FROSTI Profiles Optimization 04/02/2026

    Slides discussing including overlapped irradiance profiles at the center of an A# ITM.

    Quote:

    Slides discussing SURF, OPD, and SURF+OPD optimizations for idealized FROSTI A# profiles.

    Quote:

    Slides discussing updates on FROSTI A# profile optimizations. In particular, a new RMS function is defined which reduces inner-radii wavefront error variation to a greater degree.

    Quote:

    Slides covering a new approach to optimizing for A# FROSTI profiles. In particular, we start looking at just optimal RH correction. Once this profile is determined, we then minimize the residual further with FROSTI profiles.

    Quote:

    Slides updating progress on FROSTI A# irradiance profiles and reflector design. Edge roll-off is now included for thermoelastic deformation corrections.

    Quote:

    Quote:
    Slides

     

    A# Profile optimization update for 01/28/2026 group meeting.

    Slides

     

     

     

     

     

      698   Thu Apr 16 12:53:30 2026 CynthiaUpdateInterferometer SimulationsO5 Test mass
    Attachment 1: 4_16_update.pdf
    4_16_update.pdf
      697   Thu Apr 9 12:50:28 2026 CynthiaUpdateInterferometer SimulationsO5 Test mass
    https://docs.google.com/presentation/d/1vJPZ9H_umgsZacCLgsqAUZWjn7-6l77np3E_YgaSy_M/edit?usp=sharing
      696   Thu Apr 9 12:40:24 2026 Xuesi MaUpdateTCSA# Ring Heater Design

    Slides discussing for A# Ring Heater design.

      695   Thu Apr 2 12:23:40 2026 MichaelUpdateInterferometer SimulationsUpdate Plots and Squeezing Behavior With Toroidal Mirrors
    Attachment 1: Update_4-2-26.pdf
    Update_4-2-26.pdf
      694   Wed Apr 1 15:02:30 2026 TylerUpdateTCSA# FROSTI Profiles Optimization 04/02/2026

    Slides discussing SURF, OPD, and SURF+OPD optimizations for idealized FROSTI A# profiles.

    Quote:

    Slides discussing updates on FROSTI A# profile optimizations. In particular, a new RMS function is defined which reduces inner-radii wavefront error variation to a greater degree.

    Quote:

    Slides covering a new approach to optimizing for A# FROSTI profiles. In particular, we start looking at just optimal RH correction. Once this profile is determined, we then minimize the residual further with FROSTI profiles.

    Quote:

    Slides updating progress on FROSTI A# irradiance profiles and reflector design. Edge roll-off is now included for thermoelastic deformation corrections.

    Quote:

    Quote:
    Slides

     

    A# Profile optimization update for 01/28/2026 group meeting.

    Slides

     

     

     

     

      Draft   Thu Mar 12 13:18:49 2026 Cece OchoaUpdateInterferometer SimulationsCE Cavity Design Update
    Animation showing how modes shift in the CE arm cavity for radius 27581m and mirror radius of40cm as the laser powers up the 1.5 MW. https://drive.google.com/file/d/1UNvWmONWYDzroelC5j_Z2emGSotyzcCC/view?usp=sharing
      692   Thu Mar 12 12:48:58 2026 CynthiaUpdateInterferometer SimulationsNew Result of point absorber+miscentering
    Attachment 1: Untitled_presentation_(1).pdf
    Untitled_presentation_(1).pdf
      691   Wed Mar 11 19:38:21 2026 PooyanInfrastructureCleanroomParts and things to get after the cleanroom move
    • concrete Caulk to fill the drill holes in 1119
      • Example [Pooyan: I have a caulk gun and silicon caulk at home, if needed.]
    • Water hose for the washer in 1125
      • 1/2" diameter
      • almost 8 Ft 
    • Exhaust for the oven in 1125
      • Question: not sure which way we want the exhaust to go. Measurements depend on the path. 
      • Oven exhaust to the ceiling vertical distance: 47"
      • Oven exhaust to the ceiling exhaust distance: 6 ft
    • Rubber vibration dampers for the cleanroom fans (see the first 4 pictures)
      • 25 mm diameter, 13 mm height, ~5-6 mm thread, 6 mm deep
      • Example (This is the male version. We need one with female on both sides)
    • Cabling conduit from the cable tray to the optical table frame (through the cleanroom ceiling)
    • Wire cable tray for 1125
      • ~10 Ft, exactly similar to the one already installed in 1129
    Attachment 1: photo_2026-03-12_10-33-02.jpg
    photo_2026-03-12_10-33-02.jpg
    Attachment 2: photo_2026-03-12_10-32-57.jpg
    photo_2026-03-12_10-32-57.jpg
    Attachment 3: photo_2026-03-12_10-57-16.jpg
    photo_2026-03-12_10-57-16.jpg
    Attachment 4: photo_2026-03-12_10-57-21.jpg
    photo_2026-03-12_10-57-21.jpg
    Attachment 5: photo_2026-03-12_10-57-25.jpg
    photo_2026-03-12_10-57-25.jpg
    Attachment 6: photo_2026-03-12_10-57-28.jpg
    photo_2026-03-12_10-57-28.jpg
    Attachment 7: photo_2026-03-12_10-57-32.jpg
    photo_2026-03-12_10-57-32.jpg
    Attachment 8: photo_2026-03-12_10-57-36.jpg
    photo_2026-03-12_10-57-36.jpg
      690   Thu Mar 5 13:01:14 2026 TylerUpdateTCSA# FROSTI Profiles Optimization

    Slides discussing updates on FROSTI A# profile optimizations. In particular, a new RMS function is defined which reduces inner-radii wavefront error variation to a greater degree.

    Quote:

    Slides covering a new approach to optimizing for A# FROSTI profiles. In particular, we start looking at just optimal RH correction. Once this profile is determined, we then minimize the residual further with FROSTI profiles.

    Quote:

    Slides updating progress on FROSTI A# irradiance profiles and reflector design. Edge roll-off is now included for thermoelastic deformation corrections.

    Quote:

    Quote:
    Slides

     

    A# Profile optimization update for 01/28/2026 group meeting.

    Slides

     

     

     

      689   Thu Mar 5 12:08:47 2026 PooyanInfrastructureCleanroomCleanroom HEPA fan defect

    [Pooyan, Ma, Mary, Tyler]

    While re-installing the clean-room HEPA fan filters, we realized that one of the blowers is broken. The issue seems to be that the plastic damper bracket that is keeping the blower in place has failed. The fix is to open up the fan unit, and replace the broken vibration damper. We installed the defected unit on top of the clean room entrance, for easy future access.

    Attachment 1: Screenshot_2026-03-05_at_10-52-30_WhisperFlow-Product-Data-and-Submittals-1788-50-Rev19.pdf.png
    Screenshot_2026-03-05_at_10-52-30_WhisperFlow-Product-Data-and-Submittals-1788-50-Rev19.pdf.png
    Attachment 2: IMG_5591.jpeg
    IMG_5591.jpeg
    Attachment 3: 2704.jpg
    2704.jpg
    Attachment 4: 2705.jpg
    2705.jpg
    Attachment 5: 2706.jpg
    2706.jpg
      688   Thu Feb 26 20:25:10 2026 Cynthia LiangUpdateInterferometer SimulationsPoint Absorber+Miscentering Simulation
    Attachment 1: update_2_18_Merged.pdf
    update_2_18_Merged.pdf
      687   Thu Feb 19 12:59:47 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26

    Slides covering a new approach to optimizing for A# FROSTI profiles. In particular, we start looking at just optimal RH correction. Once this profile is determined, we then minimize the residual further with FROSTI profiles.

    Quote:

    Slides updating progress on FROSTI A# irradiance profiles and reflector design. Edge roll-off is now included for thermoelastic deformation corrections.

    Quote:

    Quote:
    Slides

     

    A# Profile optimization update for 01/28/2026 group meeting.

    Slides

     

     

      686   Thu Feb 19 12:34:18 2026 CynthiaUpdateInterferometer SimulationsPoint absorber simulation
    Attachment 1: update_2_18.pdf
    update_2_18.pdf
      685   Thu Feb 12 13:50:38 2026 Xuesi MaUpdateVACVacuum status warning system

    Vacuum Pressure Warning Script

    Script Location: controls@chimay

    Script Path: /vac/python/serial/temp_vacuum_warning.py

    Purpose

    Implement an automated warning system that monitors vacuum pressure and sends email alerts when pressure thresholds are exceeded.

    Implementation Details

    • The script runs launcher.py (located in the same directory) every 30 minutes to retrieve the latest vacuum pressure reading.
    • If the pressure rises above the critical threshold (≥ 1 × 10-6 Torr), an email alert will be sent to all group members.
    • If the pressure rises above the warning threshold (≥ 1 × 10-7 Torr), an email alert will be sent to Xuesi Ma.
    • If launcher.py fails to retrieve the vacuum pressure, or if any execution error occurs, an error notification email will be sent to Xuesi Ma.

    How to Run

    python temp_vacuum_warning.py

    Note

    An app password is required for authentication in order to send alert emails.

      684   Thu Feb 12 12:59:29 2026 MaryUpdate  
    Attachment 1: SB_scattering.pdf
    SB_scattering.pdf
      683   Thu Feb 12 12:53:51 2026 Cece OchoaUpdateELOGCE Cavity Design Update
    Update on HOM placement w/ cavity locking. Still verifying mode placement RoC: 28340m and 26874m
    Attachment 1: 2_12_short_update.pdf
    2_12_short_update.pdf
      682   Thu Feb 12 12:25:38 2026 Xuesi MaInfrastructureGeneralLab floor plans

    [Cece, Ma, Mary, Pooyan, Tyler, Paul]

    We have continued the reorganization of our Physics 1125 and 1129 lab spaces. This includes:

    • Moving two workbenches from Room 1129 into Room 1125
    • The workbench with the oven is still in Room 1129
    • Assembling the stainless steel table
    • Moving the cleanroom frame toward the whiteboard side to make room for HVAC work
    • The sink in Room 1125 was painted, and we stood Frosti up.

    Attachment 1: 2563.jpg
    2563.jpg
    Attachment 2: 2567.jpg
    2567.jpg
    Attachment 3: 2570.jpg
    2570.jpg
    Attachment 4: 2569.jpg
    2569.jpg
    Attachment 5: 2564.jpg
    2564.jpg
    Attachment 6: 2565.jpg
    2565.jpg
    Attachment 7: 2568.jpg
    2568.jpg
    Attachment 8: 2566.jpg
    2566.jpg
      681   Thu Feb 5 13:59:42 2026 MaryUpdateInterferometer Simulations 
    Attachment 1: 112.pdf
    112.pdf
      680   Thu Feb 5 13:49:31 2026 MichaelUpdateInterferometer SimulationsUpdating Squeezing Mode Matching Logic
    After some tests, I have determined that the squeezer in the aLIGO katscript is currently being matched to the SRC. This logic will cause issues if the SRC mode is perturbed and no longer closely matched to arm modes. Currently, my modification to the code involves taking the arm mode incident at the ITM and propagate the beam parameter using the ABCD matrix from the ITM to the injected squeezing port. Rerunning some of the squeezing simulations for a cold interferometer, it appears the toroidal case remains the same but the nominal mirror case degrades. Is this expected when we match to the arm instead of the SRC?
    Attachment 1: screenshot2.png
    screenshot2.png
    Attachment 2: screenshot1.png
    screenshot1.png
      679   Thu Feb 5 13:34:13 2026 Cynthia UpdateInterferometer SimulationsPoint absorber + miscentering simulation
    Attachment 1: update2_5_(3).pdf
    update2_5_(3).pdf
      678   Thu Feb 5 13:12:28 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26

    Slides updating progress on FROSTI A# irradiance profiles and reflector design. Edge roll-off is now included for thermoelastic deformation corrections.

    Quote:

    Quote:
    Slides

     

    A# Profile optimization update for 01/28/2026 group meeting.

    Slides

     

      676   Thu Feb 5 11:42:47 2026 JonInfrastructureGeneralLab floor plans

    [Audrey, Cece, Jon, Ma, Mary, Michael, Pooyan, Tyler, Shane]

    We have completed the preliminary reorganization of our Physics 1119 lab space. This includes:

    • Moving all cabinets to their final positions
    • Clearing out all equipment from the cleanroom in prep for HVAC work, and storing them in either the HEPA cabinet or double-bagging in regular storage.
    • Moving all non-essential equipment into other lab spaces.
    • Wrapping vacuum system and VLC for protection
    • Removing all ceiling tiles and fans from the ceiling of the cleanroom
    • Moving the cleanroom frame towards the front of the room.

    Prepping the new clean-and-bake station in 1125 will begin within the next week, along with the construction of the stainless steel table planned to be put into the cleanroom.

    Quote:
    Attached are the starting and final floor plans for the February 2026 expansion into the Physics 1125 lab.

     

    Attachment 1: image.jpg
    image.jpg
    Attachment 2: image_1.jpg
    image_1.jpg
    Attachment 3: image_3.jpg
    image_3.jpg
      675   Thu Jan 29 12:46:22 2026 Cece OchoaUpdate CE Cavity Design Update (4)
    Update for CE Cavity Arms + Modes https://docs.google.com/presentation/d/1-dXYylkAbNpHR4WVCx9Q8ryL_xGlH-JSSLXEUQg6b7Q/edit?usp=sharing
      674   Wed Jan 28 11:29:30 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26

    Quote:
    Slides

     

    A# Profile optimization update for 01/28/2026 group meeting.

    Slides
      673   Thu Jan 22 14:06:00 2026 Xuesi MaUpdateTCSFROSTI A# Reflector Update
    Slides
      672   Thu Jan 22 13:18:12 2026 PooyanInfrastructureGeneralLab floor plans

    The working document of tasks regarding moving the clean room is attached. Needs LIGO account to access and edit.

      https://docs.google.com/document/d/14HhMYBcHmM62Hc1YJhinMsG5uPx6xoW0WEBmDcbNMMg/edit?usp=sharing

      671   Thu Jan 22 13:12:29 2026 MaryUpdate  
    Attachment 1: PA_matem2.pdf
    PA_matem2.pdf
    Attachment 2: PA_maxtem6.pdf
    PA_maxtem6.pdf
    Attachment 3: maxtem600.jpg
    maxtem600.jpg
    Attachment 4: maxtem2dis.jpg
    maxtem2dis.jpg
    Attachment 5: dismaxtem6.jpg
    dismaxtem6.jpg
      670   Thu Jan 22 10:10:31 2026 JonInfrastructureGeneralLab floor plans
    Attached are the starting and final floor plans for the February 2026 expansion into the Physics 1125 lab.
    Attachment 1: Pre-Feb-2026.png
    Pre-Feb-2026.png
    Attachment 2: Post-Feb-2026.png
    Post-Feb-2026.png
      669   Thu Jan 15 13:52:55 2026 Xuesi MaUpdateTCSFROSTI A# Reflector Update
    Slides
      668   Thu Jan 15 12:52:58 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26
    Slides
      667   Thu Jan 8 12:51:03 2026 TylerUpdateTCSFROSTI A# Update 01/08/2026
    Slides
      666   Thu Dec 18 12:51:13 2025 TylerUpdateTCSFROSTI A# Profiles Update
    Slides
      665   Thu Dec 4 12:10:19 2025 TylerUpdateTCSFROSTI A# Profiles and Element Width Optimization
    Slides
      664   Thu Nov 20 13:54:34 2025 TylerUpdateTCSFROSTI A# Optimization and Mesh Convergence Analysis
    Attached below are slides discussing FROSTI A# Irradiance optimization and mesh convergence analysis for penetration depth.
    Attachment 1: Updates_11_19_2025-3.pdf
    Updates_11_19_2025-3.pdf
      663   Thu Nov 20 13:03:58 2025 Cece OchoaUpdateELOGCE Cavity Design Update
    Update on grouping 0+8th Order Modes
    Attachment 1: 11_20_update.pdf
    11_20_update.pdf
      662   Thu Nov 20 12:40:47 2025 Xuesi MaInfrastructureGeneralRoom 1125 Optical Table

    Cleaned off the tapes on the optical table with acetone.

    Attachment 1: 1651.jpg
    1651.jpg
    Attachment 2: 1650.jpg
    1650.jpg
      660   Thu Nov 13 12:39:01 2025 MaryUpdateInterferometer Simulations 
    Attachment 1: PA.pdf
    PA.pdf
      659   Thu Nov 6 12:39:43 2025 Cece OchoaUpdateELOGCE Cavity Design Update
    Updated mode placements and ROC. No thermal effects added yet.
    Attachment 1: base_0_6_plot.pdf
    base_0_6_plot.pdf
    Attachment 2: base_0_7_plot.pdf
    base_0_7_plot.pdf
      658   Thu Oct 30 11:45:44 2025 LiuUpdateInterferometer SimulationsMulti-ring FROSTI optimization for A#
    Multi-ring FROSTI optimization for A#: dimensionality reduction with PCA vs. t-SNE
    Attachment 1: Update.pdf
    Update.pdf
      Draft   Thu Oct 23 11:34:05 2025 MichaelUpdateInterferometer SimulationsUpdated Exploration into Different SRC Mirror Configurations for Improved Squeezing
    Attachment 1: Update_Slides_10_23_25.pdf
    Update_Slides_10_23_25.pdf
    Attachment 2: Update_Slides_10_30_25.pdf
    Update_Slides_10_30_25.pdf
      656   Thu Oct 23 11:09:16 2025 Xuesi MaUpdateMeasuring Noise in InterferometerScatter Noise Model

    DetChar meeting presentation

      655   Thu Oct 23 10:07:51 2025 LiuUpdateInterferometer SimulationsMulti-ring FROSTI optimization for A#
    4D parameter space visualization and dimensionality reduction for better optimization
    Attachment 1: loss_embedding.html
    Attachment 2: Update.pdf
    Update.pdf
      654   Thu Oct 16 10:31:20 2025 LiuUpdateInterferometer SimulationsMulti-ring FROSTI optimization for A#
    Two-ring FROSTI grid search with 4D parameter space search and visualization
    Attachment 1: interactive_plot_dropdown.html
    Attachment 2: Update.pdf
    Update.pdf
      653   Fri Oct 10 14:40:23 2025 Xuesi MaUpdateVACPressure gauge Swap

    [Tyler, Ma]

    We suspect a pressure gauge problem. The electronic unit of the main chamber pressure gauge and the electronic unit of the RGA chamber pressure gauge are swapped.

    Power and current draw aren't high for the turbo pump.

    Before opening the gate valve, the pressure in the Main chamber is 2.98e-8 Torr, RGA Chamber 1.21e-5 Torr

    After opening the gate valve (not fully open), the pressure in the Main chamber is 2.97e-8 Torr, RGA Chamber 1.55e-9 Torr. Note: the HV sensor suddenly turned on and the reading jumped to -9 Torr

    Opening the gate valve a bit more, the pressure in the Main chamber is 2.98e-8 Torr, RGA Chamber 1.34e-9 Torr.

    After switching the electronic unit, the pressure in the Main chamber is 3.23e-8 Torr, RGA Chamber 1.43e-9 Torr.

    Gate Valve fully opened at 16:01 Oct 24, 2025

    Attachment 1: 1433.jpg
    1433.jpg
    Attachment 2: 1434.jpg
    1434.jpg
    Attachment 3: 1517.jpg
    1517.jpg
    Attachment 4: 1519.jpg
    1519.jpg
    Attachment 5: 1520.jpg
    1520.jpg
    Attachment 6: 1521.jpg
    1521.jpg
    ELOG V3.1.3-7933898