ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 1 of 13  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  614   Tue Jul 15 13:13:48 2025 ChristinaUpdateTCSPhotodetector optical post assembly   pdreassembly.png 
  613   Tue Jul 15 11:47:53 2025 Xuesi MaInfrastructure  
    Date and Time:
Around 4:50 PM on July 1, 2025
    Location and Temperature:
 20250701_165118.jpg20250701_165200.jpg20250701_165329.jpg20250701_165246.jpg 
  611   Tue Jul 15 10:40:23 2025 ChristinaUpdateTCS  [Christina, Ma, Tyler] 

 Yesterday,
Ma and I started taking data for the PSD/CSD
measurements while the photodetectors and
 rpon.png 
  610   Mon Jul 14 23:50:22 2025 TylerUpdate Cymac ADC update I've been looking into the performances
of individual channels on the Cymac by computing
their individual PSDs and corresponding CSDs
 cymac_ADC_PSDs.pdfch35_ADC_comps.pdf 
  609   Mon Jul 14 20:45:20 2025 Luke SummaryCleanroomHEPA filter performance metrics [Luke, Luis]

We’ve been looking into methods
for evaluating the performance of the HEPA
  
  608   Thu Jul 10 16:41:18 2025 ChristinaUpdateTCS  [Christina, Ma, Tyler] 

 Pomona
Box completed and is now on the server rack
in 1119. Additionally, the photodetectors
 2994921113032912040.JPG4717009101108174053.JPG5782646701589802125.JPG 
  607   Tue Jul 8 12:15:04 2025 TylerUpdateTCSCyMAC ADC Noise Update[Tyler, Christina, Ma, Mary]

Below is
attached the ADC noise floor of two CyMAC
channels vs the Red Pitaya.
 ADC_comps.pdf 
  606   Tue Jul 8 11:46:55 2025 Maple MatznerUpdateTCSUpdate on SURF progress for Jul 8   Maple_TCS_update_jul_8.pdf 
  605   Mon Jul 7 17:44:04 2025 TylerUpdateGeneralLab Organization[Tyler, Pooyan, Ma, Cece, Luke, Luis, Christina,
Maple]

After acquiring some new equipment
for the labs, a few of us spent time on Thursday
 IMG_1874.jpgIMG_1872.jpgIMG_1871.jpg 
  604   Mon Jul 7 16:39:18 2025 ChristinaUpdateTCSPomona Box Drawings Below are the drawings for the pomona
box modifications 
 pbdwg1.PDFpbdwg2.pdf 
  603   Tue Jul 1 13:41:36 2025 Xuesi MaUpdate  [Ma, Liu]
 Slides
  
  602   Tue Jul 1 12:39:42 2025 TylerUpdateTCSA# FROSTI Profile Optimization Update[Tyler, Liu]

 Slides
  
  601   Tue Jul 1 11:04:00 2025 ChristinaUpdateTCSFROSTI Reconstruction II [Ma, Tyler, Christina] 

 Finished
external reconstruction of the FROSTI by
installing all the pins to the 2 DB 25 connectors.
 IMG_4042.png 
  600   Fri Jun 27 15:38:22 2025 ChristinaUpdateTCSFROSTI Reconstruction [Tyler, Ma, Christina, Luke] 

 We threaded the wiring of the
heater elements through the reflective surfaces
 IMG_4009.png 
  599   Wed Jun 25 15:44:47 2025 Luke UpdateCleanroomCleanroom cleaning[Luke, Luis, Tyler, Ma, Christina, Maple]
We started by cleaning outside of
the cleanroom wiping down the cable channel
 parttical_count_6-25-25.png 
  598   Tue Jun 24 13:47:58 2025 LiuUpdateInterferometer SimulationsAlternative FROSTI A# optimization approachAlternative FROSTI A# optimization approach  Update.pdf 
  597   Tue Jun 24 12:45:16 2025 TylerUpdateGeneralUpdated ADC spectra[Tyler]

Updated ADC noise spectra measurements
using diaggui. 

 NOTE: Will update plots
 csd_spec.pngchi_sq.png 
  596   Tue Jun 24 11:50:15 2025 Xuesi MaUpdate  



   
    
 resistance_vs_time_all_channels_channel_switch.jpgresistance_vs_time_all_channels_channel_switch_one_cycle_before.jpgresistance_vs_time_all_channels_channel_switch_one_cycle_after.jpgresistance_vs_voltage.jpg 
  595   Tue Jun 17 12:46:47 2025 TylerUpdateElectronicsCyMAC ADC NoiseBelow are results from power spectra measurements
of the CyMAC ADC, computed form 30 hours
of time series data, compared to the performance
 cymac_v_rp_csds.pdfchi_sq_cymac_v_rp.pdf 
  594   Tue Jun 17 12:22:43 2025 Xuesi MaUpdate  



   
    
 12x 
  593   Wed Jun 11 16:33:45 2025 PooyanUpdateComputersLuke's ray tracing hosting
Hosted Lukes model on Chimay. It's
available at https://richardsonlab.ucr.edu/real-time-frosti
The
sourcecode is at Github.
  
  592   Wed Jun 11 16:19:37 2025 PooyanUpdateCDSCDS update
Fast channels recorded to .gwf frame
files

Had to add a DAQ Channels
block to the c1msc model for those channel
 Screenshot_20250611_154834.pngf3k.pdf 
  591   Tue Jun 10 12:13:00 2025 Xuesi MaUpdate  
  By measuring the resistance of the
ladder, I obtained a graph of resistance
as a function of voltage.
 resistance_vs_voltage.pdfresistance_vs_voltage_element_5.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  590   Tue Jun 10 12:11:14 2025 PooyanUpdateCDSCDS update
The MEDM models issue was fixed.
The issue was that building the c1msc model
alone was not enough and we had to re-build
  
  589   Tue Jun 3 13:16:53 2025 Xuesi MaInfrastructure  
    Date and Time:
Around 3:50 PM on June 2, 2025
    Location and Temperature:
 928.jpg929.jpg931.jpg930.jpg932.jpg 
  588   Tue Jun 3 13:08:47 2025 Xuesi MaUpdate  We currently have the parts for a DB9 connector
but need parts for a DB25 connector, where
did we get the parts for the DB9 connector?
 934.jpg933.jpg 
  587   Tue Jun 3 12:16:13 2025 Cynthia UpdateInterferometer SimulationsPoint absorber simulation on radially averaged profile    update_6_3.pdf 
  586   Tue Jun 3 11:54:06 2025 Cece OchoaUpdate CE Cavity Design UpdateUpdate on the design for the CE Cavity Mirrors  CE_Arm_Cavity_.pdf 
  585   Tue Jun 3 11:50:08 2025 PooyanUpdateCDSCDS updateThere are three major issues with the lab's
CDS system that should be addressed. They
are ordered from the highest priority to
  
  584   Mon Jun 2 09:45:06 2025 Luke UpdateScripts/ProgramsRingheater modeling UpdateSlides
I have added some slides to my meeting
updates. The updates include: my choice in
  
  583   Tue May 27 12:52:22 2025 Xuesi MaUpdate  Using the configuration in section 2.11.1
in the Sorensen installation and operation
manual (attached below), I'm able to remote
 6x 
  582   Mon May 26 23:24:33 2025 MichaelUpdateInterferometer SimulationsInitial Monte Carlo Simulations for Toroidal Mirrors ProjectI've run an initial Monte Carlo simulation
for statistical comparison of toroidal mirrors
for the dual FROSTI TCS case. Below is the
  
  581   Mon May 26 11:15:28 2025 LukeUpdateScripts/ProgramsUpdate to optimization plotsI have created some new optimization plots.
I have also started on a model like the previous
Desmos model, but in python. 
Slides
  
  580   Wed May 21 14:40:38 2025 Xuesi MaInfrastructureCleanroomCleanroom Temperature
    Date and Time:
Around 2:20 PM on May 21, 2025
    Location and Temperature:
 20250521_142051.jpg20250521_142220.jpg 
  579   Mon May 19 10:59:14 2025 Xuesi MaInfrastructure  

  Status Update


 Previous Status:
  
  578   Thu May 15 12:03:41 2025 Xuesi MaInfrastructureElectronicsNoticeAll Sorensen power supplies are turned
off. The Cymac system is down (All Chassis
are down)
  
  577   Tue May 13 12:41:06 2025 TylerUpdateTCSA# Profiles UpdateSlides on the A# ITM FROSTI profile modeling
efforts can be found here.
  
  576   Tue May 13 12:35:01 2025 Xuesi MaUpdate     resistance_vs_voltage_all.pdfresistance_vs_voltage_overlay.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  575   Sun May 11 19:36:42 2025 Luke UpdateScripts/ProgramsNew optimization plotsSlides
I have re-run the optimization plots
with the changes mentioned last week. 
  
  574   Fri May 9 20:06:27 2025 Luke SummaryCleanroomCleanroom cleaning[Luke, Mohak, Luis]
We were also able to remove the residue
that has built up on the soft walls by donning
 20250509_particalcount.png 
  573   Thu May 8 17:41:56 2025 LuisUpdateVACRGA Scan Post Bake [Ma, Luis]
    After taking the RGA scans of
the new system, here are the results of the
 2025-4-29_HeaterElement-Bake1_ArO_overlay.png2025-4-29_HeaterElement-Bake1_ArO_overlayNormalized.png 
  572   Tue May 6 13:19:31 2025 Xuesi MaUpdate     resistance_vs_time_RV_rise_time_24.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  571   Tue May 6 13:07:34 2025 MichaelUpdateInterferometer SimulationsInitial Convergence Plots for Toroidal Mirrors Project   Convergence_Plots_5_6_25.pdfConvergence_Plots_5_6_25-1.pdfaperture_num_points_convergence.png 
  570   Tue May 6 12:25:03 2025 TylerConfigurationCDSCymac ADC CSD measurementAn initial measurement of the cymbal ADC CSD
is attached below. As of now, it seems that
the sensitivity limit is roughly the same
 cymac_adc_rin_v1.pdf 
  569   Sun May 4 18:17:45 2025 Luke UpdateScripts/ProgramsRingheater modeling UpdateSlides

I have changed some properties
of the thermal model and am re-running the
  
  568   Fri May 2 12:34:02 2025 Xuesi MaUpdateVACStopped bakeThe
vacuum chamber has stopped baking. 
Current state as of 12:30, 5/2/2025:
  
  567   Wed Apr 30 17:33:14 2025 Xuesi MaUpdateVACStarted bake[Luke, Ma, Tyler]
The
vacuum chamber is currently baking. 
  
  566   Wed Apr 30 15:43:56 2025 LuisUpdateVACVacuum Update[Ma, Luke, Luis]

April 29, 2025

3:30 PM
 2025-4-29_HeaterElement-Bake1_ArO.png2025-2-24_HeaterElement_ArO.png 
  565   Wed Apr 30 13:42:45 2025 ShaneUpdateCDSUPS comms successfulUpdate on UPS1 serial interfacing: communication
is now successful. On 4/15/25 we connected
to UPS1 via ethernet rather than USB, and
  
  564   Tue Apr 29 10:59:25 2025 LiuUpdateInterferometer SimulationsTest Mass Thermal State Decoder with Updated Comparison Cases    Update.pdf 
ELOG V3.1.3-7933898