ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 1 of 11  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  519   Thu Feb 20 17:07:36 2025 LuisUpdateVACRGA Scan [Ma, Luis]
    February 20, 2025 - 3:30
PM
 2025-2-20_HeaterElement_ArO.png 
  518   Wed Feb 19 13:44:48 2025 ShaneUpdateCDSVac serial interfacing update


[Jon, Shane]



Debugging update for vac system serial
communications: we were able to successfully
  
  517   Tue Feb 18 11:19:13 2025 Luke ConfigurationVACRepositioning of the lid's temperature probeBefore the recent bake I slightly repositioned
the temperature probe on the lid from beside
the heater tape to under the heater tape.
  
  516   Tue Feb 18 10:12:39 2025 TylerUpdateTCSFinal RIN Plot Update
Below is a preview of the final RIN figure
that will be included in the FROSTI instrument
paper. A quick summary of what is shown below:
 Preliminary_RIN_plot.pdfFROSTI_ON.pdfDark_Noise.pdfADC_Noise.pdf 
  515   Tue Feb 18 10:02:16 2025 Xuesi MaUpdate Group Meeting Slides 2/18/2025https://docs.google.com/presentation/d/1WiV2VqS0BzXNCK6VYYQ-Ty8xlHnzXatQaFbMf1-0rsY/edit?usp=sharing   
  514   Tue Feb 18 10:01:07 2025 Xuesi MaUpdate  [Ma, Pooyan, Tyler]
On Friday, we connected the vacuum
chamber with the Cymac.
 IMG_7916.jpegIMG_7915.jpegIMG_7917.jpeg 
  513   Sun Feb 16 16:45:18 2025 Luke UpdateGeneralRingheater position optimization Over the last couple weeks I have been
working on finding the optimal position of
the ringheater's thermal profile. 
 02.png_40.png_4-4.png02_40_4-4.png 
  512   Fri Feb 14 12:15:23 2025 LuisUpdateVACVacuum sytem staus
    [Luis, Luke, Ma]
    February 12, 2025 - 4:00
PM
 2025-2-12_HeaterElement-Bake1_ArC.png2025-2-12_HeaterElement-Bake1_ArO.png 
  511   Fri Feb 14 11:57:50 2025 LuisUpdateVACVacuum Update[Luis]
        Feb/11/25 9:30am

        Pressure gages were connected.
  
  510   Tue Feb 11 08:07:02 2025 LuisUpdateVACBake stopped [Luis, Ma]
        Feb/10/25 4:00pm

        Bake was stopped.
  
  509   Fri Feb 7 12:25:56 2025 Luke SummaryVACStarted bake[Luke, Luis]
The
vacuum chamber is currently baking. 
  
  508   Mon Feb 3 13:17:21 2025 Xuesi MaUpdate  [Ma]
changed all zip ties to peek zip
ties, and grouped wires together. The setup
 20250203_123153.jpg20250203_123213.jpg 
  507   Sat Feb 1 17:25:52 2025 Luke SummaryGeneralCleanroom cleaning[Luke, Cece, Luis]
Particle Count Measurements:

Pre-cleaning (12:15
 20250131_particalcount.png 
  506   Fri Jan 31 15:03:09 2025 Xuesi MaUpdate Heater Element Circuit Check
        table {
            width:
100%;
            border-collapse: collapse;
/* Merges borders into a single line */
  
  505   Tue Jan 28 13:30:46 2025 shaneUpdateCDSSerial comms testing updateAttempted to communicate with the smaller
vac pump (TwissTor 74) via Agilent software
today. Was able to communicate with the pump
  
  504   Mon Jan 27 23:35:28 2025 Xuesi MaUpdate  [Ma]
Installed all the pins to the peek
DB 25 connectors
 20250127_142647.jpg20250127_153454.jpg20250127_154516.jpg 
  503   Mon Jan 27 11:29:38 2025 Xuesi MaUpdate Heater Element Test[Ma, Cece, Luke, Mary, Shane]

On Friday (Jan 24), we installed
the heater elements on the stand. The heater
 20250124_165434.png20250124_165342.png 
  502   Sat Jan 25 18:19:39 2025 Luke UpdateGeneralRingheater modeling UpdateHere
is a quick update on some of the things I
have been working on regarding my project. 
  
  501   Wed Jan 22 10:50:08 2025 TylerUpdateTCSFROSTI Disassembly[Tyler, Ma, Cece, Luis, Shane, Luke, Cynthia,
Liu, Jon]

On Tuesday (Jan 21), we took
the FROSTI apart in front of a filming crew.
 IMG_1843.pngIMG_1844.pngIMG_1849.pngIMG_1850.png 
  500   Tue Jan 21 10:12:02 2025 Luke SummaryGeneralFrosti toy model [Luke, Liu]
Over the winter break I have been
working on this
  
  499   Fri Jan 17 13:27:07 2025 TylerUpdateTCSFROSTI Pre-disassembly[Tyler, Ma, Cece, Jon, Luke, Cynthia, Michael]

On
Tuesday, we prepared the FROSTI for disassembly
in anticipation of the APS filming that is
 IMG_1828.jpegIMG_1830.jpeg 
  498   Tue Jan 14 10:27:14 2025 TylerUpdateTCSRIN Updates[Tyler]


Attached below are updated
plots for the FROSTI RIN measurements for
Jan 14 group meeting.
 ASD_plots_01_14_2025.pdf 
  497   Wed Jan 8 17:35:57 2025 Luke SummaryCleanroomCleanroom cleaning[Luke, Tyler, Cynthia, Shane, Michael]
Summary of Cleaning Activities:
We began cleaning Room 1119 at 2:00
 partical_count_250108.png 
  496   Thu Jan 2 17:52:58 2025 LuisUpdateVACMR Testing Continuation [Luis, Luke]
        RGA Volume:
T = 22°C, P = 2.10e-9 Torr
        Main Volume:
 2024-12-16_PostBake2_ArO_overlay.png2025-1-2_MR-Bake1_ArO.png2025-1-2_MR-Bake1_ArC_overlay.png 
  495   Mon Dec 23 14:33:36 2024 TylerUpdateTCSLatest RIN Measurement ResultsAttached below are the measurements I took
from the FROSTI from 12/18-12/22.
 Updated_ASD_plots.pdfDark_Noise_Thermal_ASD_plots.pdfDC_Voltages.pdfRP-2.jpg 
  494   Sun Dec 22 20:43:35 2024 LuisUpdateVACMR Testing[Luis, Luke]
        RGA Volume:
T = 23°C, P = 3.0e-9 Torr
        Main Volume:
 2024-12-13_PostBake2_ArO_Degas_overlay.png2024-12-22_MR-Bake1_ArO.png 
  493   Thu Dec 19 12:00:44 2024 LukeUpdateVACEnd of bakeThe
vacuum chamber has stopped baking. 
Current state as of 11:40, 12/19/2024:
  
  492   Wed Dec 18 15:41:56 2024 TylerUpdateTCSFROSTI RIN[Tyler]


I have begun the (hopefully)
final RIN measurements at 3:30 PM today.
If you need to go into the cleanroom at any
  
  491   Tue Dec 17 13:53:53 2024 LuisUpdateVACVacuum system status [Luis]

 The vacuum system is being
baked. I disconnected the digital gages and
the magnets, opened the Ar leak and started
  
  490   Mon Dec 16 21:32:21 2024 LuisUpdateVACMR Testing[Luis, Luke]

The MR material was
placed in the vacuum chamber following standard
procedures to ensure the vacuum remained
 IMG_6011.HEIC 
  489   Sat Dec 14 07:58:25 2024 LuisUpdateVACVacuum sytem staus and Viton O-rings  [Luis]
        RGA Volume:
T = 23°C, P = 1.71e-9 Torr
        Main Volume:
 2024-12-12_PostBake2_ArO_overlay.png 
  488   Thu Dec 12 13:06:39 2024 LuisUpdateVACRGA Scan and vacuum system updates    [Luis, Luke]
    
        RGA Volume:
T = 21°C, P = 1.74e-9 Torr
 2024-12-12_PostBake2_ArC.png2024-12-12_PostBake2_ArO_overlay.png 
  487   Wed Dec 11 16:06:05 2024 LuisUpdateVACRGA Status[Luis]

 I rebooted Spica and I
was able to connect the RGA again. After
Connecting the RGA, I left the filament on.
  
  486   Wed Dec 11 13:39:30 2024 TylerUpdateElectronicsRIN Update 12/11/2024[Tyler]


Attached below are updated
ASD plots for the FROSTI RIN measurements.
The parameters set for this are the following:
 Updated_ASD_plots.pdf 
  485   Thu Dec 5 10:31:13 2024 Luis UpdateVACRGA Scan and RGA updates



   
    


 2024-12-04_PostBake2_ArO.png 
  484   Wed Dec 4 16:01:23 2024 ShaneUpdateCDSVac serial interfacing troubleshooting updateUpdate on the issue with serial interfacing
for the TV 551 turbo pump: Tried a new test
today, to see if the commands being sent
  
  483   Mon Dec 2 13:35:45 2024 Luke UpdateGeneralClean and bake of Viton O-rings[Luke, Luis]
We couldn't access the bake log on
the wiki. (see attached) So we looked in
 image_(2).png 
  482   Mon Dec 2 00:11:23 2024 MichaelUpdateInterferometer SimulationsStatus Update on Toroidal Mirrors Project WorkAs it has been significant time from my last
update on this project, I compiled a few
notes about what I have been working on,
  
  481   Sat Nov 30 12:41:42 2024 LukeUpdateVACVacuum bake endThe
vacuum chamber has stopped bakeing. 
Current state as of 12:10, 11/30/2024:
  
  480   Wed Nov 27 16:23:58 2024 Luke UpdateVACStarted bake[Luke, Luis]
The
vacuum chamber is currently baking. 
  
  479   Wed Nov 27 13:48:01 2024 TylerUpdateElectronicsRIN Update[Tyler]

 
I downgraded the Red Pitaya
back to OS 2.00-18 due to runtime errors
during measurement. Once I did this, the
 New_ASD_plots.pdf 
  478   Wed Nov 27 12:27:45 2024 Luke SummaryVACSummary of vacuum work[Luke, Luis]
Update of current state of vacuum
chamber
 2024-11-27_PostBake1_ArO.png 
  477   Wed Nov 20 12:59:37 2024 TylerUpdateElectronicsRIN UpdateI went ahead and compared the noise spectrum
of the ADC to those of the photodetectors
with the FROSTI on and off. As discussed
 ASD_plots.pdf 
  476   Wed Nov 20 12:31:24 2024 LuisUpdateVACLeak test RGA Scan after vacuum repairs[Luke, Luis]
After the gasket replacement performed
on Monday (11/18/24) we let the vacuum pump
 2024-11-20_PostBake1_ArO.png 
  474   Tue Nov 19 17:10:34 2024 Luke UpdateVACLeak checkChamber temperature: 23C
Chamber Initial Pressure: ~1.8e-8
main, ~3.5e-8 rga
 image.pngIMG_5116.jpegIMG_5117.jpeg 
  473   Thu Nov 14 11:58:05 2024 ShaneUpdateCDSTurbo pump connection troubleshootingAttempted connection to the TV551 turbo pump
through Varian/Agilent's software on spica.
Successful connection established, and we
  
  472   Thu Nov 14 10:46:20 2024 Luke SummaryCleanroomCleanroom cleaning 
[Luke, Luis, Michael]
cleaning cleanroom and particle count
 partical_count_final.png 
  471   Wed Nov 13 14:06:00 2024 Luke UpdateGeneral slides   
  470   Wed Nov 13 14:03:32 2024 TylerUpdateElectronicsRIN Update[Tyler]


We've added two low-pass filters
in hopes of reducing any potential aliasing
that may be introducing additional noise
 IMG_0463.jpgCH0_CH1_ASDs.pdf 
  469   Wed Nov 6 13:48:55 2024 LiuUpdateInterferometer SimulationsQN modeling updateSlides   
ELOG V3.1.3-7933898