ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 1 of 10  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Categorydown Subject Text Attachments
  62   Tue Apr 4 09:53:37 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsThe set up for the next round of beam characterization
measurements has begun. The beam is initially
passing through a half waveplate, is split
 initial_Intens_measure_set_up.jpg 
  65   Thu Apr 6 10:20:43 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsMore optical components were added to the
optical set up for laser intensity / polarization
drift measurements. Both lenses and both
 Optical_Setup_4-6-23.jpg 
  83   Fri Apr 28 11:21:01 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsThe Digi-key cables have arrived, and I have
began implementing them in the intensity
drift measurements. 

There was a slight
 IMG-0183.jpg 
  101   Thu May 18 14:07:08 2023 PeterUpdateVLC Update532nm Intensity MeasurementI figured out a method in which to capture
power measurements including the initial
seconds in which the beam is first turned
 Time_Series_Trial_4.pngTime_Series_Trial_5_2hrs.png 
  116   Tue Jun 6 16:15:09 2023 PeterUpdateVLC UpdateLaunch Optics for Visible Light CavityI assembled the first few components of the
launch optics for the visible light cavity.
Below is an image of the current table configuration,
 IMG-0882.jpgIMG-0883.jpg 
  221   Thu Sep 7 19:24:25 2023 PeterUpdateVLC UpdateVLC Launch ChainThe launch optics up to the Faraday Isolator
have been added to the breadboard. In the
first image, the optics are (from L to R)
 IMG-3404(1).jpgIMG-3408(1).jpg 
  234   Mon Oct 9 11:06:17 2023 PeterUpdateVLC UpdateVLC Launch ChainImplemented the new stage for the EOM. Took
power data at different positions in the
launch chain. Beam waist: 0.066mm (beam waist
 IMG-3540.jpgIMG-3538.jpgIMG-3533.jpgIMG-3522.jpg 
  242   Mon Oct 23 07:28:57 2023 PeterUpdateVLC UpdateVLC Mode MatchingI have attached a pdf with slides of my latest
updates. 
 Carney_VLC_Update.pdf 
  256   Mon Nov 6 11:31:25 2023 PeterUpdateVLC UpdateVLC Mode MatchingSee Update Attached  VLC_Update_11_6_23.pdf 
  263   Mon Nov 13 06:15:45 2023 PeterUpdateVLC UpdateVLC Mode MatchingWeekly Updates Attached in pdf  VLC_Mode_Matching_3.pdf 
  288   Fri Dec 8 11:15:21 2023 PeterUpdateVLC UpdateVLC AssemblyThe optics of the visible light cavity have
been assembled. The mode matching telescope
is folded through the two stirring mirrors
 IMG_4194.jpgIMG_4195.jpgIMG_4197.jpgIMG_4196.jpg 
  304   Tue Jan 16 10:01:21 2024 PeterUpdateVLC UpdateVLC Faraday Isolator and Mode MatchingAttached is a PDF of my weekly updates.   VLC_Mode_Matching_Design_-_Remastered.pdf 
  360   Mon Apr 15 11:51:03 2024 PeterUpdateVLC UpdateVLCAn update on the VLC project is attached below:  VLC_Update_April_15_2024.pdf 
  368   Mon May 13 14:53:29 2024 PeterUpdateVLC UpdateVLCVLC Update WEEK 7 attached below  VLC_Update.pdf 
  21   Sat Feb 4 17:01:03 2023 PeterUpdateVLC ElectronicsLaser DataPeter and Ryan took laser beam data. Configuration:
100mm focal length lens is ~100mm from lens.
150mm focal length lens is ~200mm from first
 OmegaX_M2_Fit_3.pngOmegaY_M2_Fit_3.png 
  36   Tue Feb 28 19:31:05 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook M2 measurements today. Configuration:
Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm)
at 200mm, camera at 350mm. The laser beam
 X_width_and_Y_width.png 
  48   Thu Mar 9 12:03:59 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 Data today. Picture of the optical
set up is shown below. lens1 f = 100mm, lens2
f = 50mm, lens3 f = 150mm. There was a nice
 OmegaY_M2_Fit_3.pngOmegaX_M2_Fit_3.pngoptical_setup.jpg 
  50   Fri Mar 10 12:08:09 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 laser data today. The configuration
is the same as before except now the beam
camera is the only component moving. Pictures
 OmegaX_M2_Fit_4.pngOmegaY_M2_Fit_4.png 
  61   Tue Apr 4 09:39:58 2023 PeterUpdateVLC Electronics532 M2 MeasurementsFinal M squared measurements were taken Wednesday,
3/29/23 by Peter and Ryan Hinosawa. 5 separate
sets of data were taken, and upon discussion,
 OmegaY_M2_Fit_8.pdfOmegaX_M2_Fit_8.pdfM2_Measurements_Set_Up.svgBeam_Data_8_3lens.txt 
  63   Tue Apr 4 16:43:53 2023 JonUpdateVLC ElectronicsAdditional Thorlabs PDA10A2I ordered a second PDA10A2 and mounting post
+ spacer (which puts the aperture at the
VLC's standard 3" beam height). These arrived
 PDA10A2.png 
  78   Tue Apr 25 11:56:37 2023 JonUpdateVLC ElectronicsRed Pataya has arrivedThe Red Pataya 125-14 starter kit that we
ordered for locking the 532 nm cavity has
arrived. I left it laying on the optical
 Red_Pataya.jpg 
  88   Mon May 1 18:56:57 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementI've configured the two PDA's to the Red Pitaya.
I put a 50 ohm resistor connector to each
red pitaya input port. This was because the
 graphs.jpgTime_Series_Trial_1.png 
  89   Tue May 2 15:55:33 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementI changed the 1/2 wave plate from the lens
mount to the rotational optic mount. This
allowed me to rotate the 1/2 wave plate,
 IMG-0221.jpgIMG-0222.jpggraphs(1).jpgTime_Series_Trial_2.png 
  92   Thu May 4 14:01:10 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementI adjusted the rotational mount of the wave
plate to see if the power can be 100% coupled
into either S or P polarization. The images
 graphs(3).jpggraphs(2).jpg 
  99   Tue May 16 11:56:33 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementWith the configuration the exact same as before,
I used the Jupyter notebook in the red pitaya's
development package to collect data from
 Time_Series_Trial_3.png 
  102   Mon May 22 16:43:28 2023 PeterUpdateVLC ElectronicsLaser intensity/polarization drift measurementsIn order to fully analyze the polarization
data taken last Thursday, I needed to convert
the signal output (which is in volts) to
 S-P_Polarization_Diagram.svgPolar_angle_vs_time.pngRel_Intens_vs_time.png 
  107   Wed May 24 14:28:26 2023 PeterUpdateVLC ElectronicsLaser intensity/polarization drift measurementsI went in and took polarization drift data
for 16 hours. The run started at 6:08pm and
finished at 9:15am the next day. The four
 Time_Series_Trial_7_16hrs.pngPower_vs_Time_16hrs.pngPolar_angle_vs_time_16hrs.pngRel_Intens_vs_time_16hrs.png 
  70   Wed Apr 12 16:13:19 2023 CaoPhysicsVACVacuum prep and installationAiden, Pamella, Peter, Shane, Cao 


Today
we started vacuum chamber assembly work


10:16 am: Particle count measurement of clean
 VacAssy230412.png 
  74   Fri Apr 21 00:06:43 2023 JonUpdateVACVacuum prep and installation - parts have arrivedThe two parts needed to complete the vacuum
assembly (ELOG
70) have arrived.
 SS_parts.png 
  81   Thu Apr 27 16:23:44 2023 Cao, Pamella and JulianPhysicsVACInstalling vacuum system (cont.)
 
[Pamella, Cao and Julian, Shane]



 Particles account 

10:37 am: Starting the particles account
 IMG_0139.pngIMG_0136.png 
  82   Thu Apr 27 21:43:07 2023 JonPhysicsVACGrounding vacuum systemThis afternoon I made up a green 10 AWG
grounding cable and connected it to the vacuum
system.
 IMG_0141.pngIMG_0140.png 
  84   Fri Apr 28 18:16:57 2023 CaoPhysicsVACGrounding vacuum system



  
  85   Fri Apr 28 19:00:13 2023 CaoPhysicsVACTighten CF ports on vacuum chamber[Cao]

 
After Jon's comment yesterday
that some of the connection did not seem
to have good metal-metal contact, in particular
 TightenCF.png 
  87   Mon May 1 17:10:25 2023 Julian, CaoPhysicsVACInstalling Pirani gauge and RGA probe onto to vacuum chamber [Julian, Cao] 



 03:00 pm: Particle
count

:  Zone 3 

 PXL_20230501_225241491.jpgPXL_20230501_235854958.jpgPXL_20230501_234750795.MP.jpg 
  90   Tue May 2 17:03:14 2023 Jon, CaoPhysicsVACFirst pump-down test of vacuum chamber [Jon, Cao] 

  1. Re-routing of cables 
 PXL_20230502_203343616.jpgPXL_20230502_210234897.MP.jpg 
  91   Wed May 3 19:03:47 2023 Julian,Pamella and CaoPhysicsVACModify vacuum asssembly and install RGA[Pamella, Julian, Cao]

   Today we
started re-configuring the vacuum chamber
components. 

 Particle count
 vaccum_chamber_re-configuration.jpg 
  94   Tue May 9 15:49:20 2023 JonInfrastructureVACPermanent cable routingToday I brought in a fresh supply of zip
ties (we now have 1500 in the tool chest)
and used them to permanentize the cable routing
  
  95   Tue May 9 20:55:12 2023 JonInfrastructureVACCalibrated Ar leak rateFor future reference, the calibrated Argon
source has a leak rate of 7.55E-8
atm cc/s, or equivalently 
 VTI-Calibrated-Ar-Leak.jpeg 
  97   Fri May 12 20:28:34 2023 Aiden, CaoPhysicsVACVacuum chamber Helium leak test [Aiden, Cao] 

 
 1. Helium leak test 


2:00 pm: Uninstall regulator from nitrogen
 PXL_20230512_211717602.jpgArLeak_230512.png 
  122   Tue Jun 13 21:08:46 2023 PamellaInfrastructureVACHeater system - Installation[Pamella, Cao and Jon]


 Heating system
installation 

 Today we
started installing the equipments for the
 IMG_7563.jpegIMG_7561.jpeg 
  124   Wed Jun 14 15:35:36 2023 PamellaUpdateVACHeating system installation [Pamella and Cao]

    Heating system
installation - Second day.



   Today we kept installing the equipment
 heater_equipment_install.jpg 
  129   Tue Jun 20 22:14:24 2023 Pamella, CaoInfrastructureVACShort term testing of vacuum heater controller units[Pamella, Cao]

 
 Fuse replacement


 Replace blown 10A fuse
in ucontroller outside cleanroom 
  
  130   Wed Jun 21 20:25:05 2023 CaoInfrastructureVACVacuum chamber bake attempt 1 TL;DR: 
We are not yet able to
bake the chamber at 150 deg C due to some
current limit, most likely caused power supply
 6x 
  136   Tue Jun 27 21:47:56 2023 JonInfrastructureVACVacuum chamber bake attempt 1The electrical overload problem encountered
in ELOG 130
has been resolved. The two heater controllers,
 IMG_0256.pngIMG_0257.pngIMG_0254.png 
  137   Wed Jun 28 15:58:56 2023 Shane, CaoInfrastructureVACPower trip problem remains, source of smoke is insulation[Shane, Cao] 


With the new change
in wiring configuration described in elog
136,
 Pumpline_afterRemoveInsul.jpgRGAline_afterRemoeInsul.jpgMeltedInsulation1.jpgMeltedInsulation1.jpgMeltedInsulation2.jpg 
  138   Thu Jun 29 18:27:26 2023 Jon, CaoInfrastructureVACVacuum bake attempt 3: success![Jon, Cao]


 Summary : We resolved
problems with heaters tripping power and
were able to proceed with chamber baking
 NewInsulation.pngBypassLineInsulation.jpg 
  141   Mon Jul 3 14:32:24 2023 CaoInfrastructureVACCooling down vacuum chamber[Cao]

 
After leaving the the chamber
to bake at 120 deg C from Thursday 3:41 pm.
Today I started to cool the chamber down
  
  145   Wed Jul 5 15:46:47 2023 Aiden, CaoInfrastructureVACVacuum Chamber Baking Update
Cao and Aiden put the RGA back on to
the chamber and measured the outgassing rate
after the chamber has cooled down from its
 bake1_230705.png 
  148   Thu Jul 6 16:16:03 2023 AidenSummaryVACVacuum Chamber Baking Update
Pressure Measured Before Removing Gauge
2.31 E-7 Torr.


Went in and turned
on the heating tape in increments of 30 degC
  
  150   Fri Jul 7 15:11:39 2023 AidenUpdateVACVAC System Heating Update
The temperature of the flange connecting
to the turbo pump after reaching equilibrium
is 74 degC. This means that it is safe to
  