ligo-ex
ligo-ds
|
Richardson Lab Experimental Log |
Not logged in |
|
|
|
Message ID: 74
Entry time: Fri Apr 21 00:06:43 2023
In reply to: 70
|
Author: |
Jon |
Type: |
Update |
Category: |
VAC |
Subject: |
Vacuum prep and installation - parts have arrived |
|
|
The two parts needed to complete the vacuum assembly (ELOG 70) have arrived.
- (10) 5/16"-24 x 1 3/4" threaded rods - for attaching the turbo pump reducing nipple to the CF 4.5" gate valve;
- (1) 45 degree CF 2.75" elbow for attaching the calibrated Ar/He leak to the chamber.
I left them laying on top of the ultrasonic washer. They both need to cleaned and baked following the standard procedure for stainless steel, as the threaded rods are visibly dirty. |
|
|