  392   Mon Jul 1 15:19:42 2024 Cynthia UpdateInterferometer SimulationsO4 and O5 mirror cavity scans with thermal effect   cavityScan_07_01.pdf 
  408   Mon Jul 15 15:44:52 2024 Cynthia UpdateInterferometer Simulationsperformed cavity scans with thermal effects and ring heater   cavity_scan_07_15.pdf 
  424   Mon Aug 12 17:09:04 2024 Cynthia UpdateInterferometer SimulationsO4 vs O5 cavity scans with ITM plume guess or ETMSo far the proposed solution for what to use
for O5 ITM mirror for SIS simulations is
either the plume guess file or using the
 O5_plots_and_tables.pdfO4_plots_and_tables.pdfETM12mapO5.pngScreenshot_2024-08-12_at_5.05.31_PM.png 
  428   Mon Aug 26 14:42:04 2024 Cynthia UpdateInterferometer Simulationscurrent status on cavity scan with effects of FROSTII used the code and arm cavity model used
for previous O5 study on mirrors and HOM
(the pdf of the study and the result can
 LIGO_updates_8_26.pdf 
  443   Mon Sep 16 15:18:59 2024 Cynthia UpdateInterferometer Simulationsa breakdown of FROSTI and thermal effects and the resulting cavity scan    ligo_update_9_16_(1).pdf 
  446   Mon Sep 23 15:00:41 2024 Cynthia UpdateInterferometer Simulationscorrections on assumption for O5 coatingThe document recording ETM07 and ETM08 coating
(T2300093) was discussed: 

the current
plume files are not necessarily correct in
 Uncoated_S1_ETM07-v2.pdf 
  361   Mon Apr 15 15:25:10 2024 CynthiaUpdateInterferometer Simulationsprogress on simulation so far   LIGO_update_week3_(2).pdf 
  374   Mon Jun 3 14:59:44 2024 CynthiaUpdateInterferometer SimulationsCreated cavity scan with LG modes    ligo_update_6_3.pdf 
  426   Mon Aug 19 07:11:55 2024 CynthiaUpdateInterferometer Simulationscavity scans with FROSTI effects    LIGO_update_8_19.pdf 
  454   Wed Oct 2 13:38:00 2024 CynthiaUpdateInterferometer Simulationscavity scan with averaged O4 ETM coating as plume   O5plumevsCoating.pngO5CoatAvgpt5.pngO5AVgcoatingFROSTIpt5.PNG 
  526   Tue Feb 25 10:56:25 2025 CynthiaUpdateInterferometer Simulationsmirror coating added for simulation rerunI have tried to rerun the simulation on finesse
after adding the mirror coating. The result
has a large fluctuation in required input
 updats_(3).pdf 
  530   Tue Mar 4 10:18:43 2025 CynthiaUpdateInterferometer Simulationsattempted to remove curvature and tilt for the coating    3_4_updates.pdf 
  540   Tue Mar 11 11:28:52 2025 CynthiaUpdateInterferometer Simulationsflattening mirror to study power discrepency   updates_3_11_(1).pdf 
  173   Thu Jul 27 10:18:43 2023 CelesteUpdateTCSGraphical Updates to HOM RH ModificationAttached are updated graphs of the irradiance
distribution from the 1/8th ring heater units
(extruded and reduced in length). 
 HOM_RH_1_8_Unit_Modification_Graphs.pdf 
  180   Fri Jul 28 17:45:45 2023 CelesteUpdateTCSGraphical Updates to HOM RH Modification, Friday 7/28Updated 1/8th Heater simulation modification
graphs. Slides 7, 10, 16-19 are new additions.
 HOM_RH_Simulation_Progress.pdf 
  187   Tue Aug 1 16:22:35 2023 CelesteUpdateTCSGraphical Updates to HOM RH Modification, Tuesday 8/1Slides 20-33 are newly added (data/graphs
from parameter sweep feature-1/8th heater
unit length varied from 10% of original to
 HOM_RH_Simulation_Progress_80123.pdf 
  200   Thu Aug 10 14:13:38 2023 CelesteUpdateTCS8/10/23, Simulation Graphical Progress   Simulation_Progress__8_10_23.pdf 
  204   Fri Aug 11 10:57:20 2023 CelesteUpdateTCS8/11/23 Simulation Progress   Simulation_Progress__1_32nd_Model_(1).pdf 
  209   Tue Aug 15 16:10:06 2023 CelesteUpdateTCS8/15/2023 Simulation Progress   Simulation_Progress__1_32nd_Model_(2).pdf 
  6   Tue Jun 21 18:31:49 2022 Cassidy and PhoebeUpdateCamerasIR Absorbing Screen and FLIR Camera SetupToday we set up the IR absorbing screen and
the camera on the optical table, as well
as tested that the camera was functioning
 IMG_6751.pngIMG_1146.pngIMG_6756.png 
  9   Tue Jul 26 14:10:35 2022 CassidyUpdateCamerasOptical Post Replacement and RealignmentToday I replaced the 3" optical post that
the camera rests on with a 2" optical post
in order for the screen to correctly fill
 YAxisAlignment.pngXRotZAlignment.pngNewOpticalPost.png 
  81   Thu Apr 27 16:23:44 2023 Cao, Pamella and JulianPhysicsVACInstalling vacuum system (cont.)
 
[Pamella, Cao and Julian, Shane]



 Particles account 

10:37 am: Starting the particles account
 IMG_0139.pngIMG_0136.png 
  11   Mon Oct 3 17:21:39 2022 CaoUpdateTCSInspection of macor partsThe macor parts arrived and inspected today.
These include:


 Macor spacer
(drawing:  LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf
 7x 
  67   Tue Apr 11 13:15:40 2023 CaoInfrastructureClean & BakeNitrogen gas tank replacedThe nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).

The new tank has been
  
  70   Wed Apr 12 16:13:19 2023 CaoPhysicsVACVacuum prep and installationAiden, Pamella, Peter, Shane, Cao 


Today
we started vacuum chamber assembly work


10:16 am: Particle count measurement of clean
 VacAssy230412.png 
  84   Fri Apr 28 18:16:57 2023 CaoPhysicsVACGrounding vacuum system



  
  85   Fri Apr 28 19:00:13 2023 CaoPhysicsVACTighten CF ports on vacuum chamber[Cao]

 
After Jon's comment yesterday
that some of the connection did not seem
to have good metal-metal contact, in particular
 TightenCF.png 
  86   Fri Apr 28 19:39:19 2023 CaoSummaryGeneralClean and Bake Leybold TTR 91 Pirani Gauge



  
  98   Sun May 14 15:50:48 2023 CaoInfrastructureComputersHigh resolution display of logrus machine[Cao]

 
The display resolution of the
logrus has been 1064x768 and has been the
only option, which is not great. While remote
  
  130   Wed Jun 21 20:25:05 2023 CaoInfrastructureVACVacuum chamber bake attempt 1 TL;DR: 
We are not yet able to
bake the chamber at 150 deg C due to some
current limit, most likely caused power supply
 6x 
  141   Mon Jul 3 14:32:24 2023 CaoInfrastructureVACCooling down vacuum chamber[Cao]

 
After leaving the the chamber
to bake at 120 deg C from Thursday 3:41 pm.
Today I started to cool the chamber down
  
  142   Mon Jul 3 16:26:21 2023 CaoInfrastructureDAQAccess and control Red Pitaya remotely and run it on local machine[Cao]


To access and control the Red
Pitaya using Python locally on a machine
within the local network, one should follow
  
  97   Fri May 12 20:28:34 2023 Aiden, CaoPhysicsVACVacuum chamber Helium leak test [Aiden, Cao] 

 
 1. Helium leak test 


2:00 pm: Uninstall regulator from nitrogen
 PXL_20230512_211717602.jpgArLeak_230512.png 
  145   Wed Jul 5 15:46:47 2023 Aiden, CaoInfrastructureVACVacuum Chamber Baking Update
Cao and Aiden put the RGA back on to
the chamber and measured the outgassing rate
after the chamber has cooled down from its
 bake1_230705.png 
  17   Thu Jan 26 18:58:25 2023 AidenUpdateGeneralOven HeatingAiden cleaned the oven with methanol again
and set the oven to 260 degC for 12 hours.
  
  23   Tue Feb 7 17:27:30 2023 AidenPhysicsELOGClean and Bake Batch #1Cleaned SS parts with liquinox for 20 min.
Then put in oven for 5 steps;
1. Ramp, 100
degC, 15 min
2. Const, 100 degC, 30 min
3.
  
  25   Fri Feb 10 15:15:30 2023 AidenUpdateGeneralBagging First BatchAiden Bagged and Tagged the first batch of
stainless steel parts shown on the google
spread sheet. 
1. Removed two parts from
  
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC,
  
  30   Fri Feb 17 19:12:39 2023 AidenUpdateGeneralClean and Bake batch 3Bagged and Tagged batch 2 parts by placing
no more than two parts per ESD bag then taped
them with kapton tape and tagged them with
 IMG_4126.jpgIMG_4125.jpg 
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4148.jpgIMG_4147.jpg 
  38   Tue Feb 28 19:37:22 2023 AidenSummaryGeneralClean and Bake batch 5Bagged and Tagged batch 4 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4168.jpgIMG_4169.jpgIMG_4170.jpg 
  42   Fri Mar 3 19:13:33 2023 AidenSummaryGeneralClean and Bake Batch 6Started to clean the dirtiest of the valves.
I could not finish but I definitely made
good progress on it. The MDC valve is very
 IMG_4173.jpgIMG_4174.jpg 
  47   Wed Mar 8 19:29:00 2023 AidenSummaryGeneralClean and Bake batch 7Today gave another cleaning to the MDC gate
valve. It is still very dirty an will need
more cleaning. I also cleaned the other 3
 IMG_4180.jpgIMG_4182.jpg 
  51   Tue Mar 14 18:21:41 2023 AidenSummaryGeneralClean and Bake batch 8Starting off Peter and I refilled the deionized
water barrel.

Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for
  
  52   Fri Mar 17 19:46:39 2023 AidenSummaryGeneralClean and Bake batch 9Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in
 IMG-4208.jpgIMG-4209.jpg 
  60   Mon Apr 3 17:04:05 2023 AidenSummaryGeneralIDP Scroll Pump AssemblyAiden installed the isolation valve and the
exhaust silencer kits on the IDP-3 Scroll
pump. The entire assembly still needs to
 IMG_4244.jpg 
  69   Wed Apr 12 10:53:02 2023 AidenSummaryGeneralValve CleaningBagged and Tagged the parts from batch 10
and placed them inside the clean room. 

Then
cleaned the last gate valve in liquinox for
  
  72   Mon Apr 17 17:06:49 2023 AidenSummaryGeneralClean and Bake batch 11Cleaned the Viton O-Ring for the main chamber
in Liquinox for 10 minutes. Then put it in
the oven to back for;

1. Ramp to 100 degC
 IMG_4262.jpg 
  77   Mon Apr 24 17:38:45 2023 AidenSummaryGeneralClean and Bake Batch 12Today I Bagged and tagged the o-rings from
batch 11 and placed them inside the clean
room. I also cleaned batch 12 parts in liquinox
 IMG_4269.jpgIMG_4268.jpg 
  80   Thu Apr 27 09:48:34 2023 AidenSummaryGeneralBatch 12 BaggingI took batch 12 out of the oven and put them
in a bag and placed the bag inside the clean
room in the first large stainless steel container.

I
 IMG_4279.jpgIMG_4278.jpg 