ligo-ex
ligo-ds
Richardson Lab Experimental Log, Page 9 of 11
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Infrastructure
Physics
-- Category --
General
CDS
TCS
VAC
DAQ
Safety
Computers
Scripts/Programs
Electronics
Cameras
Wiki
ELOG
Equipment Loan
Lore
VLC Electronics
Clean & Bake
Cleanroom
VLC Update
FLIR
Measuring Noise in Interferometer
Interferometer Simulations
535 Entries
Goto page
Previous
1
,
2
,
3
...
8
, 9,
10
,
11
Next
Mon Jul 1 15:19:42 2024, Cynthia , Update, Interferometer Simulations, O4 and O5 mirror cavity scans with thermal effect
Mon Jul 15 15:44:52 2024, Cynthia , Update, Interferometer Simulations, performed cavity scans with thermal effects and ring heater
Mon Aug 12 17:09:04 2024, Cynthia , Update, Interferometer Simulations, O4 vs O5 cavity scans with ITM plume guess or ETM
Mon Aug 26 14:42:04 2024, Cynthia , Update, Interferometer Simulations, current status on cavity scan with effects of FROSTI
Mon Sep 16 15:18:59 2024, Cynthia , Update, Interferometer Simulations, a breakdown of FROSTI and thermal effects and the resulting cavity scan
Mon Sep 23 15:00:41 2024, Cynthia , Update, Interferometer Simulations, corrections on assumption for O5 coating
Mon Apr 15 15:25:10 2024, Cynthia, Update, Interferometer Simulations, progress on simulation so far
Mon Jun 3 14:59:44 2024, Cynthia, Update, Interferometer Simulations, Created cavity scan with LG modes
Mon Aug 19 07:11:55 2024, Cynthia, Update, Interferometer Simulations, cavity scans with FROSTI effects
Wed Oct 2 13:38:00 2024, Cynthia, Update, Interferometer Simulations, cavity scan with averaged O4 ETM coating as plume
Tue Feb 25 10:56:25 2025, Cynthia, Update, Interferometer Simulations, mirror coating added for simulation rerun
Tue Mar 4 10:18:43 2025, Cynthia, Update, Interferometer Simulations, attempted to remove curvature and tilt for the coating
Tue Mar 11 11:28:52 2025, Cynthia, Update, Interferometer Simulations, flattening mirror to study power discrepency
Thu Jul 27 10:18:43 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification
Fri Jul 28 17:45:45 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Friday 7/28
Tue Aug 1 16:22:35 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Tuesday 8/1
Thu Aug 10 14:13:38 2023, Celeste, Update, TCS, 8/10/23, Simulation Graphical Progress
Fri Aug 11 10:57:20 2023, Celeste, Update, TCS, 8/11/23 Simulation Progress
Tue Aug 15 16:10:06 2023, Celeste, Update, TCS, 8/15/2023 Simulation Progress
Tue Jun 21 18:31:49 2022, Cassidy and Phoebe, Update, Cameras, IR Absorbing Screen and FLIR Camera Setup
Tue Jul 26 14:10:35 2022, Cassidy, Update, Cameras, Optical Post Replacement and Realignment
Thu Apr 27 16:23:44 2023, Cao, Pamella and Julian, Physics, VAC, Installing vacuum system (cont.)
Mon Oct 3 17:21:39 2022, Cao, Update, TCS, Inspection of macor parts
7x
Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced
Wed Apr 12 16:13:19 2023, Cao, Physics, VAC, Vacuum prep and installation
Fri Apr 28 18:16:57 2023, Cao, Physics, VAC, Grounding vacuum system
Fri Apr 28 19:00:13 2023, Cao, Physics, VAC, Tighten CF ports on vacuum chamber
Fri Apr 28 19:39:19 2023, Cao, Summary, General, Clean and Bake Leybold TTR 91 Pirani Gauge
Sun May 14 15:50:48 2023, Cao, Infrastructure, Computers, High resolution display of logrus machine
Wed Jun 21 20:25:05 2023, Cao, Infrastructure, VAC, Vacuum chamber bake attempt 1
6x
Mon Jul 3 14:32:24 2023, Cao, Infrastructure, VAC, Cooling down vacuum chamber
Mon Jul 3 16:26:21 2023, Cao, Infrastructure, DAQ, Access and control Red Pitaya remotely and run it on local machine
Fri May 12 20:28:34 2023, Aiden, Cao, Physics, VAC, Vacuum chamber Helium leak test
Wed Jul 5 15:46:47 2023, Aiden, Cao, Infrastructure, VAC, Vacuum Chamber Baking Update
Thu Jan 26 18:58:25 2023, Aiden, Update, General, Oven Heating
Tue Feb 7 17:27:30 2023, Aiden, Physics, ELOG, Clean and Bake Batch #1
Fri Feb 10 15:15:30 2023, Aiden, Update, General, Bagging First Batch
Mon Feb 13 18:57:53 2023, Aiden, Summary, General, Clean and Bake batch 2
Fri Feb 17 19:12:39 2023, Aiden, Update, General, Clean and Bake batch 3
Tue Feb 21 17:51:04 2023, Aiden, Summary, General, Clean and Bake batch 4
Tue Feb 28 19:37:22 2023, Aiden, Summary, General, Clean and Bake batch 5
Fri Mar 3 19:13:33 2023, Aiden, Summary, General, Clean and Bake Batch 6
Wed Mar 8 19:29:00 2023, Aiden, Summary, General, Clean and Bake batch 7
Tue Mar 14 18:21:41 2023, Aiden, Summary, General, Clean and Bake batch 8
Fri Mar 17 19:46:39 2023, Aiden, Summary, General, Clean and Bake batch 9
Mon Apr 3 17:04:05 2023, Aiden, Summary, General, IDP Scroll Pump Assembly
Wed Apr 12 10:53:02 2023, Aiden, Summary, General, Valve Cleaning
Mon Apr 17 17:06:49 2023, Aiden, Summary, General, Clean and Bake batch 11
Mon Apr 24 17:38:45 2023, Aiden, Summary, General, Clean and Bake Batch 12
Thu Apr 27 09:48:34 2023, Aiden, Summary, General, Batch 12 Bagging
Goto page
Previous
1
,
2
,
3
...
8
, 9,
10
,
11
Next
ELOG V3.1.3-7933898