  265   Mon Nov 13 11:23:54 2023 Jon UpdateCDSCyMAC testing[Jon, Shane, Luis]
My repair of the internal ribbon
connecting the ADC to the adapter board resolved
 Cymac_GDS_Diagnostics.png 
  254   Thu Nov 2 17:14:36 2023 Shane, Jon UpdateCDSCyMAC set up permanentized



CyMAC connections
have been finalized and made permanent. Also
tested voltages, which are all looking good.
 cymac_chassis_back.jpegcymac_chassis_back2.jpegcymac_chassis_front.jpegfinal_connections_back_of_power_supply.jpegpower_supply_back.jpeg 
  250   Mon Oct 30 18:15:13 2023 ShaneUpdateCDSCyMAC chassis mounted and progress on power connectionsAll CyMAC chassis mounted in electronics rack
today, and shelf for monitor also mounted.
Images attached. Assembled grounding cables
 electronics_rack_back.jpegelectronics_rack_front.jpegmounted_chassis.jpegpower_supply.jpeg 
  Draft   Tue Oct 1 19:41:23 2024 ShaneUpdateCDSCyMAC Timing Chassis Issue[Shane, Luis]


Summary of the issue we've
been having with the timing chassis: when
we connect only the Valon 5015 to power,
 IMG_5917.jpegIMG_5803.jpegIMG_5804.jpeg 
  252   Wed Nov 1 18:24:01 2023 ShaneUpdateCDSCyMAC Power connections made



Finished
power connections today for the CyMAC chassis.
Images attached. Had to switch the shrink
 cymac_power_connected.jpegcymac_power_connections_back.jpeg 
  2   Thu Jun 2 16:14:58 2022 JonHowToGeneralCustom conda environment on JupyterHubCross-linking instructions: How
to run a Jupyter notebook in your custom
Conda environment
  
  374   Mon Jun 3 14:59:44 2024 CynthiaUpdateInterferometer SimulationsCreated cavity scan with LG modes    ligo_update_6_3.pdf 
  141   Mon Jul 3 14:32:24 2023 CaoInfrastructureVACCooling down vacuum chamber[Cao]

 
After leaving the the chamber
to bake at 120 deg C from Thursday 3:41 pm.
Today I started to cool the chamber down
  
  8   Fri Jul 22 13:20:28 2022 PhoebeUpdate ComsolI will be using comsol until 1:30 pm today.
I will be updating the model for the heater
mount to be thicker in certain areas, so
  
  382   Mon Jun 24 21:38:25 2024 PooyanInfrastructureComputersComputer server changes in 1119 and 1129[Jon, Pooyan, Tyler]
 
A few computer machine changes have
 IMG_6889.jpgIMG_6890.jpg 
  132   Fri Jun 23 15:47:06 2023 PamellaUpdateFLIRCollecting data - Moving horizontal and vertical on screen.[Pamella]

 
 02:09 pm: Turned
on the device (current on) 
 02:42
pm: Started taking snap on position one (Reference
 6x 
  241   Fri Oct 20 16:38:02 2023 Shane, AidenUpdateCleanroomCleanrooom cleaning and particle count


[Aiden, Shane]


cleaning
cleanroom and particle count


 3:16 pm: started particle
  
  45   Mon Mar 6 18:48:43 2023 PamellaUpdateGeneralCleanroom update Today Pamella and Julian finished cleaning
of the new lab cabinets. Also we wiped the
computer and  put inside the cleanroom so
 203863E0-106A-465E-8D9C-461B0358FB60.jpeg779F360D-CAD0-4C49-AE0B-973F97F6D099.jpeg276B9F0C-6661-441F-AD34-D79DA61E1FC3.jpeg 
  93   Mon May 8 12:00:03 2023 Pamella, Shane, JulianUpdateGeneralCleanroom particle counts and cleaning the cleanroom.[Pamella,Julian, Shane]


Today we
cleaned the clean-room (floor, surfaces)
and particle count.



10:00
  
  268   Thu Nov 16 17:12:42 2023 Luis, Shane, MohakUpdateCleanroomCleanroom cleaning and particle count


[Shane, Luis,
Mohak]


cleaning cleanroom and
particle count
  
  362   Wed Apr 17 15:07:04 2024 ShaneUpdateCleanroomCleanroom cleaning and particle count


[Mohak, Luke,
Luis, Shane, Cynthia, Michael, Xuesi]


cleaning
cleanroom and particle count
  
  369   Thu May 16 15:23:14 2024 ShaneUpdateCleanroomCleanroom cleaning and particle count


[Luis, Michael,
Luke, Shane]


cleaning cleanroom
and particle count
  
  456   Thu Oct 3 19:35:04 2024 ShaneUpdateCleanroomCleanroom cleaning and particle count


[Luke, Michael,
Cynthia, Mary]


cleaning cleanroom
and particle count
  
  472   Thu Nov 14 10:46:20 2024 Luke SummaryCleanroomCleanroom cleaning 
[Luke, Luis, Michael]
cleaning cleanroom and particle count
 partical_count_final.png 
  15   Wed Jan 18 22:06:05 2023 JulianUpdateELOGCleanroom UpdateI wiped down all the inner walls of the cleanroom
using alcohol wipes, as per Cao's instruction.
  
  22   Mon Feb 6 20:02:32 2023 JulianUpdateGeneralCleanroom UpdateI wiped down the main table (including frame,
legs, and transparent shelf) and workbench
using alcohol wipes. Once I cleaned all of
  
  41   Thu Mar 2 20:53:56 2023 JulianUpdateGeneralCleanroom UpdateToday Pamella and Julian began the final cleaning
of the cleanroom, starting with the HEPA
vacuuming and mopping then wiping down every
  
  43   Sat Mar 4 00:34:46 2023 JulianUpdateGeneralCleanroom UpdateToday I was able to finish cleaning the frame
of the laser table, and for good measure
I wiped down the tabletop and exterior of
  
  55   Thu Mar 23 18:40:08 2023 JulianUpdateGeneralCleanroom UpdateToday Pamella and I came in to Hepa vacuum
and mop the floor of the cleanroom for general
maintenance. 
  
  100   Wed May 17 12:18:08 2023 Pamella, Julian and Shane UpdateGeneralCleaning room and particle count[Pamella, Julian and Shane]



Particle
count: 
  10 am: Started particle count


 Zone 3 :

  
  109   Wed May 31 11:42:16 2023 Pamella, Julian and ShaneUpdateGeneralCleaning room and particle count[Pamella, Shane and Julian]


 Cleaning
room and particle count 


 09:58 am: Started the particle count
  
  76   Fri Apr 21 16:51:26 2023 PamellaUpdateGeneralCleaning cables.Cables for the vacuum system.
 

Today i wiped, bagged and tagged two cables
for the vacuum system. I used IPA wipes for
 IMG_5416.jpeg 
  131   Thu Jun 22 13:58:00 2023 Pamella, Julian and ShaneUpdateCleanroomCleaning and Particle Count


[Pamella,
Shane, and Julian]
cleaning cleanroom
and particle count



12:00
  
  66   Fri Apr 7 09:48:09 2023 PamellaUpdateGeneralClean the system partsPamella and Julian wiped and tag system parts
for the vacuum machine. We used isopropyl
and vectra wipes in the most import pieces:
 7x 
  54   Wed Mar 22 15:25:00 2023 ShaneUpdateGeneralClean room recertification particle counts Attached are the five zone particle measurements
for the clean room now that the fan speeds
have been set to MEDIUM. 2 min sample time,
 counts3.22.23.pdf 
  32   Thu Feb 23 13:32:55 2023 ShaneUpdateGeneralClean room floor particle countsHere are the counts from the clean room floor
today. The counts should be dated- the ones
from today (2/23/23) are the last 8 in the
 2.23.2023.pdf 
  49   Thu Mar 9 13:51:42 2023 ShaneUpdateGeneralClean room counts 3/9/23Here's the clean room counts from this morning.
Also attached is rough diagram of where the
five zones are in the clean room. Counts
 particlecounts3.9.23.pdfclean_room_zones.JPG 
  294   Sun Dec 17 21:04:15 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129[Jon, Tyler, Aiden, Luke]
On Friday we completed assembly of
the new stainless steel-topped benches in
 IMG_0781.pngIMG_0782.png 
  297   Wed Dec 20 10:33:34 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129Update: I
have completed permanent routing of the electrical
cables. I also ran the ultrasonic washer's
  
  59   Fri Mar 31 14:23:13 2023 PamellaUpdateGeneralClean and bake batch 11Today I bagged and tagged batch 11. I wiped
the some tools: Centering ring alum( 2 pieces),
reversible ratcheting, gasket removal (CF).
 4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg 
  52   Fri Mar 17 19:46:39 2023 AidenSummaryGeneralClean and Bake batch 9Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in
 IMG-4208.jpgIMG-4209.jpg 
  51   Tue Mar 14 18:21:41 2023 AidenSummaryGeneralClean and Bake batch 8Starting off Peter and I refilled the deionized
water barrel.

Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for
  
  47   Wed Mar 8 19:29:00 2023 AidenSummaryGeneralClean and Bake batch 7Today gave another cleaning to the MDC gate
valve. It is still very dirty an will need
more cleaning. I also cleaned the other 3
 IMG_4180.jpgIMG_4182.jpg 
  38   Tue Feb 28 19:37:22 2023 AidenSummaryGeneralClean and Bake batch 5Bagged and Tagged batch 4 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4168.jpgIMG_4169.jpgIMG_4170.jpg 
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4148.jpgIMG_4147.jpg 
  30   Fri Feb 17 19:12:39 2023 AidenUpdateGeneralClean and Bake batch 3Bagged and Tagged batch 2 parts by placing
no more than two parts per ESD bag then taped
them with kapton tape and tagged them with
 IMG_4126.jpgIMG_4125.jpg 
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC,
  
  146   Wed Jul 5 16:02:12 2023 AidenUpdateClean & BakeClean and Bake batch 14 BaggingBagged and Tagged the 2.75" copper gaskets
from Batch 14 and placed them into the clean
room on the work bench.
  
  72   Mon Apr 17 17:06:49 2023 AidenSummaryGeneralClean and Bake batch 11Cleaned the Viton O-Ring for the main chamber
in Liquinox for 10 minutes. Then put it in
the oven to back for;

1. Ramp to 100 degC
 IMG_4262.jpg 
  57   Fri Mar 24 13:36:17 2023 PamellaUpdateGeneralClean and Bake batch 10Today I bagged and tagged batch 10.
 I wiped
the RGA vacuum component for around 25 minutes
after that I bagged and tagged this part
 260AEB73-02D0-4635-93B3-B2EB3269FB84.jpeg59FD199A-A444-439A-8D51-C242B65BBECD.jpeg9A48A0EE-5EFE-409D-ACC0-17011F6F7EBF.jpeg950F85B7-D304-4724-AB3D-B606E422F1E3.jpeg 
  86   Fri Apr 28 19:39:19 2023 CaoSummaryGeneralClean and Bake Leybold TTR 91 Pirani Gauge



  
  42   Fri Mar 3 19:13:33 2023 AidenSummaryGeneralClean and Bake Batch 6Started to clean the dirtiest of the valves.
I could not finish but I definitely made
good progress on it. The MDC valve is very
 IMG_4173.jpgIMG_4174.jpg 
  279   Mon Nov 27 19:34:50 2023 AidenUpdateClean & BakeClean and Bake Batch 20 BaggingBagged and tagged bath 20 which included the
macor hardware and place it inside the clean
room on the table.
  
  272   Mon Nov 20 20:37:45 2023 AidenUpdateVACClean and Bake Batch 20[Aiden, Luis]
Started to clean and bake the
macor parts for the FROSTI reflector. Per
LIGO documentation cleaned the macor in liquinox
  
  237   Mon Oct 9 21:41:24 2023 AidenUpdateClean & BakeClean and Bake Batch 19Bagged and tagged the parts from batch 18.
Started the Copper batch that includes all
the gaskets needed to start the vacuum chamber
  