265
|
Mon Nov 13 11:23:54 2023 |
Jon | Update | CDS | CyMAC testing | [Jon, Shane, Luis]
My repair of the internal ribbon
connecting the ADC to the adapter board resolved |
|
254
|
Thu Nov 2 17:14:36 2023 |
Shane, Jon | Update | CDS | CyMAC set up permanentized |
CyMAC connections
have been finalized and made permanent. Also
tested voltages, which are all looking good. |
|
250
|
Mon Oct 30 18:15:13 2023 |
Shane | Update | CDS | CyMAC chassis mounted and progress on power connections | All CyMAC chassis mounted in electronics rack
today, and shelf for monitor also mounted.
Images attached. Assembled grounding cables |
|
Draft
|
Tue Oct 1 19:41:23 2024 |
Shane | Update | CDS | CyMAC Timing Chassis Issue | [Shane, Luis]
Summary of the issue we've
been having with the timing chassis: when
we connect only the Valon 5015 to power, |
|
252
|
Wed Nov 1 18:24:01 2023 |
Shane | Update | CDS | CyMAC Power connections made |
Finished
power connections today for the CyMAC chassis.
Images attached. Had to switch the shrink |
|
2
|
Thu Jun 2 16:14:58 2022 |
Jon | HowTo | General | Custom conda environment on JupyterHub | Cross-linking instructions: How
to run a Jupyter notebook in your custom
Conda environment |
|
374
|
Mon Jun 3 14:59:44 2024 |
Cynthia | Update | Interferometer Simulations | Created cavity scan with LG modes | |
|
141
|
Mon Jul 3 14:32:24 2023 |
Cao | Infrastructure | VAC | Cooling down vacuum chamber | [Cao]
After leaving the the chamber
to bake at 120 deg C from Thursday 3:41 pm.
Today I started to cool the chamber down |
|
8
|
Fri Jul 22 13:20:28 2022 |
Phoebe | Update | | Comsol | I will be using comsol until 1:30 pm today.
I will be updating the model for the heater
mount to be thicker in certain areas, so |
|
382
|
Mon Jun 24 21:38:25 2024 |
Pooyan | Infrastructure | Computers | Computer server changes in 1119 and 1129 | [Jon, Pooyan, Tyler]
A few computer machine changes have |
|
132
|
Fri Jun 23 15:47:06 2023 |
Pamella | Update | FLIR | Collecting data - Moving horizontal and vertical on screen. | [Pamella]
02:09 pm: Turned
on the device (current on)
02:42
pm: Started taking snap on position one (Reference |
6x |
241
|
Fri Oct 20 16:38:02 2023 |
Shane, Aiden | Update | Cleanroom | Cleanrooom cleaning and particle count |
[Aiden, Shane]
cleaning
cleanroom and particle count
3:16 pm: started particle |
|
45
|
Mon Mar 6 18:48:43 2023 |
Pamella | Update | General | Cleanroom update | Today Pamella and Julian finished cleaning
of the new lab cabinets. Also we wiped the
computer and put inside the cleanroom so |
|
93
|
Mon May 8 12:00:03 2023 |
Pamella, Shane, Julian | Update | General | Cleanroom particle counts and cleaning the cleanroom. | [Pamella,Julian, Shane]
Today we
cleaned the clean-room (floor, surfaces)
and particle count.
10:00 |
|
268
|
Thu Nov 16 17:12:42 2023 |
Luis, Shane, Mohak | Update | Cleanroom | Cleanroom cleaning and particle count |
[Shane, Luis,
Mohak]
cleaning cleanroom and
particle count |
|
362
|
Wed Apr 17 15:07:04 2024 |
Shane | Update | Cleanroom | Cleanroom cleaning and particle count |
[Mohak, Luke,
Luis, Shane, Cynthia, Michael, Xuesi]
cleaning
cleanroom and particle count |
|
369
|
Thu May 16 15:23:14 2024 |
Shane | Update | Cleanroom | Cleanroom cleaning and particle count |
[Luis, Michael,
Luke, Shane]
cleaning cleanroom
and particle count |
|
456
|
Thu Oct 3 19:35:04 2024 |
Shane | Update | Cleanroom | Cleanroom cleaning and particle count |
[Luke, Michael,
Cynthia, Mary]
cleaning cleanroom
and particle count |
|
472
|
Thu Nov 14 10:46:20 2024 |
Luke | Summary | Cleanroom | Cleanroom cleaning |
[Luke, Luis, Michael]
cleaning cleanroom and particle count |
|
15
|
Wed Jan 18 22:06:05 2023 |
Julian | Update | ELOG | Cleanroom Update | I wiped down all the inner walls of the cleanroom
using alcohol wipes, as per Cao's instruction. |
|
22
|
Mon Feb 6 20:02:32 2023 |
Julian | Update | General | Cleanroom Update | I wiped down the main table (including frame,
legs, and transparent shelf) and workbench
using alcohol wipes. Once I cleaned all of |
|
41
|
Thu Mar 2 20:53:56 2023 |
Julian | Update | General | Cleanroom Update | Today Pamella and Julian began the final cleaning
of the cleanroom, starting with the HEPA
vacuuming and mopping then wiping down every |
|
43
|
Sat Mar 4 00:34:46 2023 |
Julian | Update | General | Cleanroom Update | Today I was able to finish cleaning the frame
of the laser table, and for good measure
I wiped down the tabletop and exterior of |
|
55
|
Thu Mar 23 18:40:08 2023 |
Julian | Update | General | Cleanroom Update | Today Pamella and I came in to Hepa vacuum
and mop the floor of the cleanroom for general
maintenance. |
|
100
|
Wed May 17 12:18:08 2023 |
Pamella, Julian and Shane | Update | General | Cleaning room and particle count | [Pamella, Julian and Shane]
Particle
count:
10 am: Started particle count
Zone 3 :
|
|
109
|
Wed May 31 11:42:16 2023 |
Pamella, Julian and Shane | Update | General | Cleaning room and particle count | [Pamella, Shane and Julian]
Cleaning
room and particle count
09:58 am: Started the particle count |
|
76
|
Fri Apr 21 16:51:26 2023 |
Pamella | Update | General | Cleaning cables. | Cables for the vacuum system.
Today i wiped, bagged and tagged two cables
for the vacuum system. I used IPA wipes for |
|
131
|
Thu Jun 22 13:58:00 2023 |
Pamella, Julian and Shane | Update | Cleanroom | Cleaning and Particle Count |
[Pamella,
Shane, and Julian]
cleaning cleanroom
and particle count
12:00 |
|
66
|
Fri Apr 7 09:48:09 2023 |
Pamella | Update | General | Clean the system parts | Pamella and Julian wiped and tag system parts
for the vacuum machine. We used isopropyl
and vectra wipes in the most import pieces: |
7x |
54
|
Wed Mar 22 15:25:00 2023 |
Shane | Update | General | Clean room recertification particle counts | Attached are the five zone particle measurements
for the clean room now that the fan speeds
have been set to MEDIUM. 2 min sample time, |
|
32
|
Thu Feb 23 13:32:55 2023 |
Shane | Update | General | Clean room floor particle counts | Here are the counts from the clean room floor
today. The counts should be dated- the ones
from today (2/23/23) are the last 8 in the |
|
49
|
Thu Mar 9 13:51:42 2023 |
Shane | Update | General | Clean room counts 3/9/23 | Here's the clean room counts from this morning.
Also attached is rough diagram of where the
five zones are in the clean room. Counts |
|
294
|
Sun Dec 17 21:04:15 2023 |
Jon | Infrastructure | Clean & Bake | Clean and bake lab migrated to 1129 | [Jon, Tyler, Aiden, Luke]
On Friday we completed assembly of
the new stainless steel-topped benches in |
|
297
|
Wed Dec 20 10:33:34 2023 |
Jon | Infrastructure | Clean & Bake | Clean and bake lab migrated to 1129 | Update: I
have completed permanent routing of the electrical
cables. I also ran the ultrasonic washer's |
|
59
|
Fri Mar 31 14:23:13 2023 |
Pamella | Update | General | Clean and bake batch 11 | Today I bagged and tagged batch 11. I wiped
the some tools: Centering ring alum( 2 pieces),
reversible ratcheting, gasket removal (CF). |
|
52
|
Fri Mar 17 19:46:39 2023 |
Aiden | Summary | General | Clean and Bake batch 9 | Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in |
|
51
|
Tue Mar 14 18:21:41 2023 |
Aiden | Summary | General | Clean and Bake batch 8 | Starting off Peter and I refilled the deionized
water barrel.
Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for |
|
47
|
Wed Mar 8 19:29:00 2023 |
Aiden | Summary | General | Clean and Bake batch 7 | Today gave another cleaning to the MDC gate
valve. It is still very dirty an will need
more cleaning. I also cleaned the other 3 |
|
38
|
Tue Feb 28 19:37:22 2023 |
Aiden | Summary | General | Clean and Bake batch 5 | Bagged and Tagged batch 4 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them |
|
31
|
Tue Feb 21 17:51:04 2023 |
Aiden | Summary | General | Clean and Bake batch 4 | Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them |
|
30
|
Fri Feb 17 19:12:39 2023 |
Aiden | Update | General | Clean and Bake batch 3 | Bagged and Tagged batch 2 parts by placing
no more than two parts per ESD bag then taped
them with kapton tape and tagged them with |
|
29
|
Mon Feb 13 18:57:53 2023 |
Aiden | Summary | General | Clean and Bake batch 2 | Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC, |
|
146
|
Wed Jul 5 16:02:12 2023 |
Aiden | Update | Clean & Bake | Clean and Bake batch 14 Bagging | Bagged and Tagged the 2.75" copper gaskets
from Batch 14 and placed them into the clean
room on the work bench. |
|
72
|
Mon Apr 17 17:06:49 2023 |
Aiden | Summary | General | Clean and Bake batch 11 | Cleaned the Viton O-Ring for the main chamber
in Liquinox for 10 minutes. Then put it in
the oven to back for;
1. Ramp to 100 degC |
|
57
|
Fri Mar 24 13:36:17 2023 |
Pamella | Update | General | Clean and Bake batch 10 | Today I bagged and tagged batch 10.
I wiped
the RGA vacuum component for around 25 minutes
after that I bagged and tagged this part |
|
86
|
Fri Apr 28 19:39:19 2023 |
Cao | Summary | General | Clean and Bake Leybold TTR 91 Pirani Gauge |
|
|
42
|
Fri Mar 3 19:13:33 2023 |
Aiden | Summary | General | Clean and Bake Batch 6 | Started to clean the dirtiest of the valves.
I could not finish but I definitely made
good progress on it. The MDC valve is very |
|
279
|
Mon Nov 27 19:34:50 2023 |
Aiden | Update | Clean & Bake | Clean and Bake Batch 20 Bagging | Bagged and tagged bath 20 which included the
macor hardware and place it inside the clean
room on the table. |
|
272
|
Mon Nov 20 20:37:45 2023 |
Aiden | Update | VAC | Clean and Bake Batch 20 | [Aiden, Luis]
Started to clean and bake the
macor parts for the FROSTI reflector. Per
LIGO documentation cleaned the macor in liquinox |
|
237
|
Mon Oct 9 21:41:24 2023 |
Aiden | Update | Clean & Bake | Clean and Bake Batch 19 | Bagged and tagged the parts from batch 18.
Started the Copper batch that includes all
the gaskets needed to start the vacuum chamber |
|