Mon Mar 10 21:13:12 2025, Nathan, Update, VLC Update, PDH Lock Progress and Next Steps   
|
Progress update: Photodiode is set up, need to set up DC bias tee, EOM has 400-600nm wavelength range with a resonance frequency of 0.1-100MHz. Additionally
need to connect the DC bias to SR560, put it in low pass, then connect to the function generator and connect it to oscilloscope to observe. Once everything
looks good and working, need to connect the driver and we can start actuating on the cavity ETM. |
Tue Apr 8 20:04:35 2025, Nathan, Update, VLC Update, PDH Lock Progress 
|
Connected the DC bias and mixer. Need to connect signal generator now to RF Amp and mixer, and also need to connect power supply. After that will see if
I can get a detection on the oscilloscope and if so will set up the driver. [Photos attached] |
Wed Mar 1 21:27:20 2023, Jon, Infrastructure, Cleanroom, Over-table shelf height raised
|
Jon, Cao
Today we raised the height of the shelf overhanging the cleanroom laser table by 8 inches. This was done to create more vertical clearance between
the top-loading vacuum chamber and the bottom of the shelf. The added clearance should make both removing the chamber lid and inserting large parts easier. |
Mon Jan 23 17:26:15 2023, Peter Carney, Update, General, Oven cleaning
|
Aiden and Cao
Turned on the oven to 120 deg C for 12 hours. After 12 hours, put it at 200 deg C for 48 hours. |
Thu Jan 26 18:58:25 2023, Aiden, Update, General, Oven Heating
|
Aiden cleaned the oven with methanol again and set the oven to 260 degC for 12 hours. |
Fri Feb 23 18:03:27 2024, Tyler, Update, FLIR, Optical Test Setup in Cleanroom
|
[Tyler, Xuesi]
The FLIR and test mass stand-in have been transferred into the cleanroom. A software test will be run as soon as we get an ethernet
cable long enough to reach into the cleanroom where the camera is set up. Once this is finished, the FLIR will be moved aside for construction of the FROSTI!
When completed, the camera will be placed back into position for in-air optical testing.
|
Tue Jul 26 14:10:35 2022, Cassidy, Update, Cameras, Optical Post Replacement and Realignment  
|
Today I replaced the 3" optical post that the camera rests on with a 2" optical post in order for the screen to correctly fill out the camera's FOV. The
3" post is now in the glass optics cabinet next to the FLIR camera configuration box, wrapped in the protective materials from the 2" post for safekeeping.
There were no issues with the physical replacement of the post, except that the fork clamp on the post needs to be on one of the perpendicular, |
Thu Feb 27 18:22:21 2025, Shane, Update, CDS, Ongoing work in server rack and desk area (1119)
|
As part of the vacuum communications debugging process, there is ongoing work in the server rack and desk area in 1119. Please be careful not to move any
of the materials left out in the server rack or on the work bench. |
Tue Sep 30 12:51:23 2025, Tyler, Update, TCS, O6 RH Update 09/30/2025
|
Slides |
Tue Aug 26 13:09:03 2025, Tyler, Update, TCS, O6 RH Update
|
[Tyler]
Below are slides giving an update on RH O6 design progress.
Slides |
Mon Aug 12 17:09:04 2024, Cynthia , Update, Interferometer Simulations, O4 vs O5 cavity scans with ITM plume guess or ETM   
|
So far the proposed solution for what to use for O5 ITM mirror for SIS simulations is either the plume guess file or using the O5 ETM mirror for ITM. I
had ran a cavity scan for both of these possibilities and it seems like the results produced are fairly different. The next step is most likely moving
on to adding the Frosti effects including both of the proposed possibilities, and before this, a few confirmations and verifications are needed using similar |
Mon Jul 1 15:19:42 2024, Cynthia , Update, Interferometer Simulations, O4 and O5 mirror cavity scans with thermal effect
|
|
Thu May 15 12:03:41 2025, Xuesi Ma, Infrastructure, Electronics, Notice
|
All Sorensen power supplies are turned off. The Cymac system is down (All Chassis are down)
If you need more information or if you need to turn them back on please contact Xuesi Ma. |
Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced
|
The nitrogen gas tank has been replaced with a new unit. The new tank is ultra pure nitrogen (>99.9% nitrogen).
The new tank has been placed and secured
to the rack where the old one is; cap is removed and regulator is reinstalled onto the new tank. |
Fri Feb 10 16:34:45 2023, Huy Tuong Cao, Infrastructure, Clean & Bake, Nitrogen gas tank ready to use
|
Cao,
Today I fixed the final bit related to the nitrogen gas tank, which is to apply sealing tape to M-NPT connector of the hose to prevent
leakage
(file: AirGunSealed.jpg)
After application of the tape, no audible leak can be heard from connection between the hose and the air gun. |
Fri Jul 26 17:25:42 2024, Jon, Infrastructure, Computers, New workstation ws4 installed in 1129
|
Today I installed the second desktop workstation in 1129. The new machine is an Intel NUC13ANHi5, with a 12-Core Intel i5-1340P CPU, 32GB DDR4 RAM, and
a 1TB SSD.
I loaded it with a fresh installation of Debian 12 and installed the LIGO CDS workstation (control room) tools. It is assigned the hostname ws4 |
Thu Jun 20 18:01:11 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129
|
I have repurposed a spare Intel NUC to serve as the first of two planned workstations in 1129. Today I set it up with a fresh installation of Debian 12.5,
assigned it the static IP address 192.168.1.15, and installed the LIGO CDS workstation packages. It is assigned the host name ws3.
Temporarily, the
mouse is borrowed from ws1 in 1119. We need to order another mouse as well as a 25-ft Ethernet cable for connecting the workstation to the 1129 switch, |
Wed Jun 26 15:33:41 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129
|
Set-up of the first CDS workstation for 1129, ws3, is complete and the machine is ready for use. The login credentials are the same as the other lab
machines.
All that now remains is to install a permanent cable tray for running the new Ethernet cables between the electronics rack and bench (they are |
Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables
|
I delivered new NEMA 5-15 (120V / 15 A) power cables to the lab for the following items:
WS2 (cleanroom) cart - 10ft cable
Electronics workbench overhead LED - 10ft cable
Both PI heater controller sets - (2)
6ft cables
I installed the new cables on the WS2 cart and the workbench myself, and left the two 6ft cables (as pictured below) for Aiden |
Fri Apr 25 19:18:10 2025, Luke , Update, Scripts/Programs, New optimization plots 
|
I have created two more plots. One on the transmitted power for a specific configuration. This was done by taking the product of the efficiency and the
power released by surface area of the source plane for a configuration assuming it is at 300C. The second is a plot of how close the reflector is to the
test mass I have included a contour line at 2mm the nominal proximity constraint. Both of these plots are generated for a 2cm wide target plane. |
Sun May 11 19:36:42 2025, Luke , Update, Scripts/Programs, New optimization plots
|
Slides
I have re-run the optimization plots with the changes mentioned last week.
I have added the heat maps of the HOM scattering from HR deformation and the HOM scattering due to the OPD difference as well as the curvature |
Tue Sep 2 18:33:38 2025, Liu, Infrastructure, General, New lab room 1125 layout and measurement
|
Action items for facilities
Ceiling lights replacement
Fume hood cleaned and refurbished
Sink countertop cleaning
Floor cleaned and waxed
|
Tue Jun 27 15:18:26 2023, Pamella, Update, FLIR, New data collection 
|
[Pamella]
Yesterday, I did a new data collection. I could get a better data in this time and I realized than I need use some
angle on the reflector for got a better shot. I need do that because the FLIR camera just is able to get the triangle shape for complete if I keep exactly
in same line for center point on the camera but for the data now I need move the refletor to go up and go down. So wasn't working very well if I keep the |
Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI
|
[Pamella and Dr.Richardson]
Dr. Richardson installed the new cabinet outside the room for the PPI equipments, and then I wiped all surfaces inside
and outside of the new cabinet.
Dr.Richardson and I have finished organizing the PPI within the new cabinet. Also we have new supplies of gloves,
and will likely have more supplies for other PPIs soon. |
Fri Jul 14 16:49:42 2023, Pamella, Update, FLIR, New bridge and calibration data
|
[Pamella]
Aiden 3D printed a new bridge for the heater and I installed the new bridge yesterday.
I started collecting data to plot
a calibration with the heater. I'm doing measurements with current and the thermocouple (thermometer) to compare with FLIR measurements and have a good
calibration. |
Mon May 13 14:48:27 2024, Aiden, Update, VAC, New Vacuum Chamber Design
|
I created a new model for the vacuum chamber based on the ideas from last week's meeting.
It should be noted that we can not have the zero length
reducer and the gate valve on the same arm as they both have blind tapped holes. We need to decide if we want the gate valve or not as if we do, we will
need to use the 3 inch long reducer.
Important Measurements:
From the back of the flange to the back of the RGA: 25.25 in
Height from |
Mon Jul 8 17:01:45 2024, Shane, Update, CDS, New CyMAC internal layout
|
[Jon, Shane]
Internal layout of CyMAC has been updated (labeled image attached) to accommodate the replacement of the two ribbon cables. Looking down
on the chassis from the front, and going from left to right, the new placement is as follows: BIO card, DAC adapter board, ADC adapter board, DAC card,
ADC card. NOTE: As part of ADC-DAC loopback testing, we're disconnecting from the FROSTI readout chassis and using the cables to connect directly from |
Tue May 30 14:51:27 2023, Pamella, Update, FLIR, New 3D mask - Bigger triangles shapes. 
|
[Pamella]
Change the 3D mask
Started removing the old mask in the reflector.
Started cutting the new aluminum lid for the
new 3D mask and assembling in the 3D mask.
Started doing the new cable connections for the light.
Started testing the resistance
in the new cable connections. The multimeter show us 14.2 Ω.
Started attaching the mask with the light and the thermometer sensor.
|
Tue Sep 9 12:13:38 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A# with grid search
|
Multi-ring FROSTI optimization based on IFO metrics for A# with grid search |
Tue Jul 29 11:27:57 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#  
|
|
Tue Aug 12 12:16:21 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
|
Multi-ring FROSTI optimization for A# with static polishing |
Tue Sep 23 12:39:29 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
|
|
Thu Oct 9 12:18:14 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
|
|
Tue Aug 26 12:14:24 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI design for A# with ring heater optimization
|
Multi-ring FROSTI design for A# with ring heater optimization |
Tue Sep 2 12:41:33 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI design for A# with ring heater optimization
|
[Tyler, Liu]
Ring heater optimization, continued |
Tue Jul 25 15:35:14 2023, Shane, Update, Electronics, More chassis moved
|
Finished basic assembly of binary input and output chassis today, and moved one to top shelf of work bench. The other is in corner of work bench (image
attached). They are delicate, so please do not move them or place anything on top of them. |
Wed May 3 19:03:47 2023, Julian,Pamella and Cao, Physics, VAC, Modify vacuum asssembly and install RGA
|
[Pamella, Julian, Cao]
Today we started re-configuring the vacuum chamber components.
Particle count
10:45 am : Starting
the particle count in the clean room.
11:13 am : Finished the particle count in the clean room.
Zone 3 :
0.3 u: 2535
0.5 u: 1413
1.0 u: 789
Zone 4 :
0.3 u: 457
0.5 |
Wed May 31 16:18:41 2023, Aiden, Summary, General, Mock FROSTI
|
Finished assembly on the Mock FROSTI so it is ready for the fit test at LIGO lab. |
Mon Jul 8 12:26:10 2024, Michael, Update, Interferometer Simulations, Minimizing Astigmatic Effects in the SRC of LIGO
|
This is the first look and analysis of the effects of astigmatism in the aLIGO optical layout which can lead to mode mismatch and therefore increased losses
into higher order modes. Specifically I am currently looking at measuring the effect of changing the radii of curvature of the SRC mirrors https://docs.google.com/presentation/d/1qhIehqyNukg4g8S2fqfQZz83yr9aB76tEa6fn2J-TrM/edit?usp=sharing |
Tue Jul 29 11:45:19 2025, Maple, Update, TCS, Meeting update
|
|
Sat Feb 24 08:53:38 2024, Jon, Infrastructure, Computers, Matlab upgraded to 2023b on Chimay
|
I upgraded Matlab on chimay to the latest stable release, 2023b. From some quick tests, it appears to be in working order. Let me know of any issues. |
Thu Jan 2 17:52:58 2025, Luis, Update, VAC, MR Testing Continuation  
|
[Luis, Luke]
RGA Volume: T = 22°C, P = 2.10e-9 Torr
Main Volume: T = 21°C, P = 5.71e-9 Torr
|
Mon Dec 16 21:32:21 2024, Luis, Update, VAC, MR Testing
|
[Luis, Luke]
The MR material was placed in the vacuum chamber following standard procedures to ensure the vacuum remained as clean as possible.
During this process, we only opened the main
volume while keeping the gate valve between the two volumes closed to maintain the UHV in the RGA section.
An
RGA scan was taken before this process, this will be used to compare the state of the vacuum with the sample inside to determine whether the MR material |
Sun Dec 22 20:43:35 2024, Luis, Update, VAC, MR Testing 
|
[Luis, Luke]
RGA Volume: T = 23°C, P = 3.0e-9 Torr
Main Volume: T = 22°C, P = 9.90e-9 Torr
After letting the vacuum cool down for a couple days, we reattached the magnets and sensors, then we performed a RGA scan of the vacuum system, |
Tue Nov 5 09:56:04 2024, Luis Martin, Update, Clean & Bake, MR Bake
|
[Luke, Luis]
On Friday, 11/1/24, the MR was unpackaged and cleaned under the flow bench. We noticed an ink stain on one of the corners of the
material. After wiping it down with IPA and Vector Alpha wipes, the stain was removed. However, the material showed some wear.
|
Mon Feb 19 14:40:21 2024, Shane, Update, CDS, MEDM screen for FROSTI temp readouts 
|
Here's the latest draft of the MEDM screen for the FROSTI heating elements' temperature readouts. Note that the MEDM screen isn't actually this grainy,
this just happens to be a photo of the lab monitor's screen off a phone. |
Thu Feb 29 17:16:48 2024, Shane, Update, CDS, MEDM screen for FROSTI T/P readouts
|
Here's the latest draft of the MEDM screen for the FROSTI temp and power readouts, now with a button linking to the c1msc file display. Size/color/label
are all changeable, if adjustment is needed. Checked in execute mode as well, and it's working correctly. Also noticed that the MEDM file name has been
changed to FROSTI.adl, which I'm noting here for future reference. Still in medm_sandbox directory. |
Wed Jun 11 16:33:45 2025, Pooyan, Update, Computers, Luke's ray tracing hosting
|
Hosted Lukes model on Chimay. It's available at https://richardsonlab.ucr.edu/real-time-frosti
The
sourcecode is at Github. It is clones at /var/www/html/real-time-frosti, and
this is the block added to nginx config file at /etc/nginx/sites-available/default : |
Wed Feb 21 23:15:07 2024, Michael, Update, Interferometer Simulations, Long Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in Beamsplitter  
|
I have created the long shoelaces 1 layout for cosmic explorer using gtrace, a slight modification from the shoelaces 1 layout design. I also modified the
simulation code slightly to remove ghosting effects in the beamsplitter. Originally the python code specified that the HR and AR sides of the beamsplitter
both have the same transmission/reflection. I modified this to the ideal case of: Refl_AR = 0, Trans_AR = 1. I have attached two images below to show the |
Tue Feb 6 22:40:25 2024, Michael, Update, Scripts/Programs, Long Crab 1 Design Created In Gtrace 
|
Worked on and completed the python code for the simulation of the Long Crab 1 layout for Cosmic Explorer basing off of Pooyan's original work with the Crab
1 layout. From here I'll look into creating the shoelaces layouts. |