414
|
Mon Jul 29 12:20:56 2024 |
Liu | Update | Interferometer Simulations | Update on wavefront actuation with astigmatically driven RH for CE | Update on wavefront actuation with astigmatically
driven RH for CE is attached. |
|
415
|
Mon Jul 29 12:23:10 2024 |
Liu | Update | Interferometer Simulations | Update on mechanical resonances of CE BS with stiffener ring | Update on mechanical resonances of CE BS with
stiffener ring is attached. |
|
Draft
|
Sun Aug 4 09:01:01 2024 |
Michael | Update | Interferometer Simulations | Update on SRC Mode Mismatch Analysis | An update on my analysis to minimize mode
mismatch/scattering by introducing toroidal
mirrors to the SRC. |
|
421
|
Tue Aug 6 13:07:07 2024 |
Xuejun | Update | Interferometer Simulations | | [Xuejun]
The width and location of
the measured in-air change in temperature
profile has been determined to be 0.045m |
|
424
|
Mon Aug 12 17:09:04 2024 |
Cynthia | Update | Interferometer Simulations | O4 vs O5 cavity scans with ITM plume guess or ETM | So far the proposed solution for what to use
for O5 ITM mirror for SIS simulations is
either the plume guess file or using the |
|
426
|
Mon Aug 19 07:11:55 2024 |
Cynthia | Update | Interferometer Simulations | cavity scans with FROSTI effects | |
|
428
|
Mon Aug 26 14:42:04 2024 |
Cynthia | Update | Interferometer Simulations | current status on cavity scan with effects of FROSTI | I used the code and arm cavity model used
for previous O5 study on mirrors and HOM
(the pdf of the study and the result can |
|
430
|
Tue Aug 27 18:37:40 2024 |
Luke | Update | Interferometer Simulations | Ringheater model update | Updated the model to produce a more circular
deformation in the HR surface. The first
three attachments are from irradiance patterns |
|
436
|
Mon Sep 9 12:36:45 2024 |
Michael | Update | Interferometer Simulations | Update on Analysis of Mode Mismatch Minimization in A# | I have taken a closer look at the solution
curve in the mirror parameter space which
I have searched, focusing on the "resilience" |
|
439
|
Mon Sep 16 07:28:16 2024 |
Luke | Update | Interferometer Simulations | Ring heater update | |
|
443
|
Mon Sep 16 15:18:59 2024 |
Cynthia | Update | Interferometer Simulations | a breakdown of FROSTI and thermal effects and the resulting cavity scan | |
|
444
|
Mon Sep 23 08:29:49 2024 |
Luke | Update | Interferometer Simulations | Ringheater update |
Ringheater
Update
If the link does not work here is |
|
446
|
Mon Sep 23 15:00:41 2024 |
Cynthia | Update | Interferometer Simulations | corrections on assumption for O5 coating | The document recording ETM07 and ETM08 coating
(T2300093) was discussed:
the current
plume files are not necessarily correct in |
|
454
|
Wed Oct 2 13:38:00 2024 |
Cynthia | Update | Interferometer Simulations | cavity scan with averaged O4 ETM coating as plume | |
|
469
|
Wed Nov 6 13:48:55 2024 |
Liu | Update | Interferometer Simulations | QN modeling update | Slides |
|
2
|
Thu Jun 2 16:14:58 2022 |
Jon | HowTo | General | Custom conda environment on JupyterHub | Cross-linking instructions: How
to run a Jupyter notebook in your custom
Conda environment |
|
7
|
Mon Jul 11 14:29:45 2022 |
Jon | Omnistructure | General | HEPA filter installed | Today I unpacked and installed the new HEPA
filter for the lab. It is an Omni CleanAir
OCA1210 capable of 1200 CFM. This flow rate |
|
16
|
Mon Jan 23 17:26:15 2023 |
Peter Carney | Update | General | Oven cleaning | Aiden and Cao
Turned on the oven to 120
deg C for 12 hours. After 12 hours, put it
at 200 deg C for 48 hours. |
|
17
|
Thu Jan 26 18:58:25 2023 |
Aiden | Update | General | Oven Heating | Aiden cleaned the oven with methanol again
and set the oven to 260 degC for 12 hours. |
|
18
|
Fri Jan 27 18:44:31 2023 |
Julian | Update | General | Vacuum Chanmber Cleaning | I used the IPA wipes to wipe down the inside
of the chamber the best I could. I cleaned
the main chamber but not any of the connecting |
|
19
|
Fri Feb 3 13:04:04 2023 |
shane | Summary | General | clean room particle counts 1/25/23 | Clean room count graphs for each zone (as
of January 25, 2023) attached |
|
22
|
Mon Feb 6 20:02:32 2023 |
Julian | Update | General | Cleanroom Update | I wiped down the main table (including frame,
legs, and transparent shelf) and workbench
using alcohol wipes. Once I cleaned all of |
|
25
|
Fri Feb 10 15:15:30 2023 |
Aiden | Update | General | Bagging First Batch | Aiden Bagged and Tagged the first batch of
stainless steel parts shown on the google
spread sheet.
1. Removed two parts from |
|
27
|
Sat Feb 11 00:17:27 2023 |
Julian | Update | General | Vacuum Chamber Cleaning | Today I finished wiping down the rest of the
vacuum chamber, specifically focusing on
the connecting ports and outside surface |
|
28
|
Sat Feb 11 17:09:29 2023 |
Shane | Update | General | clean room particle counts 2/10/23 | Took a round of clean room counts after the
latest clean of vacuum chamber on Feb 10.
Used 60 second sample time, 5 samples for |
|
29
|
Mon Feb 13 18:57:53 2023 |
Aiden | Summary | General | Clean and Bake batch 2 | Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC, |
|
30
|
Fri Feb 17 19:12:39 2023 |
Aiden | Update | General | Clean and Bake batch 3 | Bagged and Tagged batch 2 parts by placing
no more than two parts per ESD bag then taped
them with kapton tape and tagged them with |
|
31
|
Tue Feb 21 17:51:04 2023 |
Aiden | Summary | General | Clean and Bake batch 4 | Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them |
|
32
|
Thu Feb 23 13:32:55 2023 |
Shane | Update | General | Clean room floor particle counts | Here are the counts from the clean room floor
today. The counts should be dated- the ones
from today (2/23/23) are the last 8 in the |
|
33
|
Thu Feb 23 21:12:33 2023 |
Julian | Update | General | Vacuum Chamber Cleaning | Today I was able to come in and wipe down
both sides of the vacuum chamber lid using
the regular alcohol wipes and also wipes |
|
34
|
Mon Feb 27 17:09:04 2023 |
Pamella | Update | General | Vacuum Chamber Cleaning | Pamella and Julian finished cleaning the interior
of the chamber, chamber lid, and the table.
We found some black residue on the side of |
|
35
|
Tue Feb 28 13:53:17 2023 |
Pamella | Update | General | Vacuum chamber cleaning | Pamella, Dr. Richardson and Dr.Cao finished
checking and cleaning the interior of the
chamber, chamber lid, and exterior of the |
|
38
|
Tue Feb 28 19:37:22 2023 |
Aiden | Summary | General | Clean and Bake batch 5 | Bagged and Tagged batch 4 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them |
|
41
|
Thu Mar 2 20:53:56 2023 |
Julian | Update | General | Cleanroom Update | Today Pamella and Julian began the final cleaning
of the cleanroom, starting with the HEPA
vacuuming and mopping then wiping down every |
|
42
|
Fri Mar 3 19:13:33 2023 |
Aiden | Summary | General | Clean and Bake Batch 6 | Started to clean the dirtiest of the valves.
I could not finish but I definitely made
good progress on it. The MDC valve is very |
|
43
|
Sat Mar 4 00:34:46 2023 |
Julian | Update | General | Cleanroom Update | Today I was able to finish cleaning the frame
of the laser table, and for good measure
I wiped down the tabletop and exterior of |
|
44
|
Mon Mar 6 15:32:58 2023 |
Jon | Infrastructure | General | Cabinet installation completed | Jon, Cao, Peter
This morning Facilities delivered
and installed two new cabinets with sliding |
|
45
|
Mon Mar 6 18:48:43 2023 |
Pamella | Update | General | Cleanroom update | Today Pamella and Julian finished cleaning
of the new lab cabinets. Also we wiped the
computer and put inside the cleanroom so |
|
47
|
Wed Mar 8 19:29:00 2023 |
Aiden | Summary | General | Clean and Bake batch 7 | Today gave another cleaning to the MDC gate
valve. It is still very dirty an will need
more cleaning. I also cleaned the other 3 |
|
49
|
Thu Mar 9 13:51:42 2023 |
Shane | Update | General | Clean room counts 3/9/23 | Here's the clean room counts from this morning.
Also attached is rough diagram of where the
five zones are in the clean room. Counts |
|
51
|
Tue Mar 14 18:21:41 2023 |
Aiden | Summary | General | Clean and Bake batch 8 | Starting off Peter and I refilled the deionized
water barrel.
Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for |
|
52
|
Fri Mar 17 19:46:39 2023 |
Aiden | Summary | General | Clean and Bake batch 9 | Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in |
|
54
|
Wed Mar 22 15:25:00 2023 |
Shane | Update | General | Clean room recertification particle counts | Attached are the five zone particle measurements
for the clean room now that the fan speeds
have been set to MEDIUM. 2 min sample time, |
|
55
|
Thu Mar 23 18:40:08 2023 |
Julian | Update | General | Cleanroom Update | Today Pamella and I came in to Hepa vacuum
and mop the floor of the cleanroom for general
maintenance. |
|
57
|
Fri Mar 24 13:36:17 2023 |
Pamella | Update | General | Clean and Bake batch 10 | Today I bagged and tagged batch 10.
I wiped
the RGA vacuum component for around 25 minutes
after that I bagged and tagged this part |
|
59
|
Fri Mar 31 14:23:13 2023 |
Pamella | Update | General | Clean and bake batch 11 | Today I bagged and tagged batch 11. I wiped
the some tools: Centering ring alum( 2 pieces),
reversible ratcheting, gasket removal (CF). |
|
60
|
Mon Apr 3 17:04:05 2023 |
Aiden | Summary | General | IDP Scroll Pump Assembly | Aiden installed the isolation valve and the
exhaust silencer kits on the IDP-3 Scroll
pump. The entire assembly still needs to |
|
66
|
Fri Apr 7 09:48:09 2023 |
Pamella | Update | General | Clean the system parts | Pamella and Julian wiped and tag system parts
for the vacuum machine. We used isopropyl
and vectra wipes in the most import pieces: |
7x |
68
|
Tue Apr 11 17:56:15 2023 |
Pamella | Update | General | Lab cleaning | Today Pamella and Julian finished cleaning
of the cleanroom, starting with the HEPA
vacuuming, mopping and clearing all floor |
|
69
|
Wed Apr 12 10:53:02 2023 |
Aiden | Summary | General | Valve Cleaning | Bagged and Tagged the parts from batch 10
and placed them inside the clean room.
Then
cleaned the last gate valve in liquinox for |
|