  207   Tue Aug 15 13:32:37 2023 SophiaUpdateScripts/ProgramsUpdate on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD PlotsI have now fixed all issues that I was having
this morning, and have added text boxes which
show the peak values of both PSD's and the
 Screenshot_2023-08-15_at_4.27.58_PM.pngScreenshot_2023-08-15_at_2.21.18_PM.pngScreenshot_2023-08-15_at_5.25.05_PM.png 
  208   Tue Aug 15 16:04:23 2023 AidenUpdateVACVAC Heating System Update
Pulled off the rest of the heater tape
along with the aluminum tape left behind.
The aluminum tape adhesive left behind a
 6x 
  209   Tue Aug 15 16:10:06 2023 CelesteUpdateTCS8/15/2023 Simulation Progress   Simulation_Progress__1_32nd_Model_(2).pdf 
  210   Wed Aug 16 16:55:40 2023 Shane, JonUpdateCDSexternal power supply cables finishedAll four external power supply cables for
the CyMAC chassis are now assembled. Using
them now to test if chassis power up correctly.
 IMG_9251.jpeg 
  211   Wed Aug 16 17:17:02 2023 Shane, JonUpdateCDSBinary input chassis powering correctly Binary input chassis passed power-on test,
and is lighting up as expected. Binary output
chassis also successfully powered on. AA
 IMG_9253.jpeg 
  212   Thu Aug 17 15:02:44 2023 AidenUpdateVACVAC Heating System Update
Put the heating tape back on and made
sure to have 4 coils around the barrel of
the chamber. To make this happen I did not
 11x 
  213   Thu Aug 17 15:18:48 2023 AidenUpdateVACVAC Heating System UpdateRelocated the PID controllers so that the
heating tape could be plugged in. In the
picture the left one controls the top half
 IMG_4628.jpg 
  214   Mon Aug 21 17:13:25 2023 AidenUpdateVACVacuum Chamber Baking Update
Came in to take RGA data and found the
turbo pump drawing .38 Amps. This was much
higher than what it was on Friday. I investigated
 bake3_230821_ArC.pngbake3_230821_ArO.png 
  215   Mon Aug 28 14:43:50 2023 AidenUpdateVACVacuum Chamber Baking UpdateThe PID controllers were turned off on Friday
and the chamber was left to cool over the
weekend. Just took data and it looks like
 bake4_230828_ArC.pngbake4_230828_ArO.png 
  216   Tue Aug 29 19:09:21 2023 AidenUpdateVACVacuum Chamber Baking UpdateHere are some more plots with the RGA data
take August 29. It seems that more pumping
time has led to the HC levels being dramatically
 bake4_230829_ArO.pngbake4_230829_ArC.png 
  217   Tue Aug 29 22:07:38 2023 AidenUpdateGeneralElectronic BenchDr Richardson is working on mounting more
power supplies in the server rack and is
using the electronics bench. Be aware to
 IMG_4632.jpg 
  218   Thu Aug 31 12:56:29 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook some more RGA data to see if the HC levels
have further declined since bake 4 and it
seems that it has started to plateau with
 bake4_230831_ArC.pngbake4_230831_ArO.pngbake4_230829_ArO.png 
  219   Fri Sep 1 19:21:19 2023 AidenUpdateVACVAC System Heating UpdateStarted bake 5 today. This will hopefully
be a longer and hotter bake with it lasting
6-7 days at around 150 C. The pressure in
  
  220   Tue Sep 5 16:43:19 2023 AidenUpdateGeneralVAC System Heating UpdateChecked on bake 5 today after 3 days of equilibrium.
The RGA cross is at 106 C and the turbo pump
cross is at 74 C. This was reached while
  
  221   Thu Sep 7 19:24:25 2023 PeterUpdateVLC UpdateVLC Launch ChainThe launch optics up to the Faraday Isolator
have been added to the breadboard. In the
first image, the optics are (from L to R)
 IMG-3404(1).jpgIMG-3408(1).jpg 
  222   Fri Sep 8 16:10:43 2023 AidenUpdateVACVAC System Heating UpdateTurned off the PID controllers to let the
chamber cool down. Final temperatures for
the RGA cross and Turbo pump cross were 113
  
  223   Mon Sep 11 16:02:42 2023 AidenUpdateVACVAC System Heating UpdateThe chamber has cooled down from bake 5 and
I took the first set of data. The pressure
measured during the RGA measurements reached
 bake5_230911_ArO.pngbake5_230911_ArC.png 
  224   Tue Sep 12 15:31:31 2023 AidenUpdateClean & BakeClean and Bake Batch 15Cleaned and Baked the SS screws for the heater
mount. Check the Clean and Bake data base
on the website to get a precise list of the
 IMG_4647.jpg 
  225   Thu Sep 14 17:05:38 2023 Shane, JonUpdateCDSTiming chassis setup and testingTested the setup today for the timing chassis
(intended to provide the timing reference
for the CyMAC). Was able to read the correct
  
  226   Fri Sep 15 17:33:35 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook some more RGA data and see that the chamber
has gotten much cleaner since monday. Next
step would be another bake with some focus
 bake5_230915_ArC.pngbake5_230915_ArO.png 
  227   Thu Sep 28 15:17:13 2023 AidenUpdateClean & BakeClean and Bake Batch 16Bagged and Tagged the parts from batch 15
and started baking batch 16 which includes
the 6" to 8" reducer.
  
  228   Fri Sep 29 11:22:33 2023 Shane, AidenUpdateCleanroomcleaning and particle count


[Aiden, Shane]


cleaning
cleanroom and particle count


10:06 am: ran zero count
  
  230   Fri Sep 29 11:53:54 2023 ShaneUpdateCleanroom5 zone particle count measurement in cleanroom Today's 5 zone measurement of cleanroom particulate
concentration is attached
 23.png23.png 
  231   Fri Sep 29 17:27:30 2023 Shane, JonUpdateCDSTiming chassis assembly progress (CyMAC)Worked on timing chassis assembly today for
the CyMAC, settled on layout (see attachment
1). Frequency synthesizer and frequency divider
 timing_chassis.jpegBI_chassis.jpeg 
  232   Tue Oct 3 15:07:48 2023 AidenUpdateClean & BakeClean and Bake Batch 17Cleaned and baked all the stainless steel
parts in Batch 17. Check data base for more
details on this.
  
  233   Sat Oct 7 17:10:27 2023 AidenUpdateClean & BakeClean and Bake Batch 18Bagged and tagged the parts from Batch 17
and placed them in the clean room on the
optic table. Also started an aluminum batch
  
  234   Mon Oct 9 11:06:17 2023 PeterUpdateVLC UpdateVLC Launch ChainImplemented the new stage for the EOM. Took
power data at different positions in the
launch chain. Beam waist: 0.066mm (beam waist
 IMG-3540.jpgIMG-3538.jpgIMG-3533.jpgIMG-3522.jpg 
  235   Mon Oct 9 11:29:37 2023 TylerUpdateElectronicsPSD/CSD Plot UpdatesContinuing from Sophia's SURF Project this
summer: Plotting the Power-Spectral Densities
(PSDs) and Cross-Spectral Densities of two
 Screenshot_2023-10-09_at_11.20.25_AM.pngwelch_csd-2.png 
  236   Mon Oct 9 16:59:21 2023 Shane, JonUpdateCDStiming chassis power cable and AI chassis testing for CyMAC


[Shane, Jon]


Today's
CyMAC work: 

Finished assembling
external power supply cable for the timing
 IMG_1457.jpeg 
  237   Mon Oct 9 21:41:24 2023 AidenUpdateClean & BakeClean and Bake Batch 19Bagged and tagged the parts from batch 18.
Started the Copper batch that includes all
the gaskets needed to start the vacuum chamber
  
  238   Wed Oct 11 20:47:11 2023 JonUpdateVACVacuum upgrade begins[Jon, Tyler, Aiden, Peter]
Upgrade of the UHV system to a larger
turbo pump began today. After obtaining a
 IMG_0619.pngIMG_0621.pngIMG_0618.png 
  239   Thu Oct 12 12:11:10 2023 AidenUpdateVACVacuum chamber Helium leak test[Aiden, Tyler, Peter, Jon]


Continued
tightening bolts on the turbo pump and 6"-8"
reducer to reduce the leak. The final leak
 IMG_4689.jpgIMG_4688.jpg 
  240   Thu Oct 19 11:41:04 2023 AidenUpdateVACVacuum Chamber Baking Update[Aiden, Tyler, Mohak]

Took some RGA
data when we came into the room. The pressure
of the chamber was 8.63e-8 Torr before turning
 6x 
  241   Fri Oct 20 16:38:02 2023 Shane, AidenUpdateCleanroomCleanrooom cleaning and particle count


[Aiden, Shane]


cleaning
cleanroom and particle count


 3:16 pm: started particle
  
  242   Mon Oct 23 07:28:57 2023 PeterUpdateVLC UpdateVLC Mode MatchingI have attached a pdf with slides of my latest
updates. 
 Carney_VLC_Update.pdf 
  243   Mon Oct 23 11:28:05 2023 TylerUpdateCamerasFLIR Camera Code UpdatesThe past week I've been spending time going
through the FLIR code on gitlab. Initially,
it had appeared that our measurements with
 Screenshot_2023-10-23_at_11.06.04_AM.png 
  244   Mon Oct 23 18:02:23 2023 Shane, JonUpdateCDSTiming chassis assembly completeConcluded assembly of timing chassis for CyMAC
today; see attachment 1 for interior set
up of chassis. Installed front and rear panels,
 timing_chassis_complete.jpegtiming_chassis_output_1.jpegtiming_chassis_output_2.jpeg 
  245   Thu Oct 26 13:00:45 2023 AidenUpdateVACVacuum Chamber Baking UpdateBake 6 was turned off on Monday. Tooke RGA
data today and have posted the data below.
The pressure of the chamber after taking
 bake6_231026_ArC.pngbake6_231026_ArO.png 
  246   Fri Oct 27 15:16:31 2023 AidenUpdateVACVacuum Leak TestLeak tested the worst flanges on the chamber
after moving it and after bake 6. The 6 inch
flange connected to the 8 inch reducing nipple
  
  247   Fri Oct 27 15:28:30 2023 ShaneUpdateCDSAA and AI chassis for CyMAC powered on and functionalCyMAC updates: Switched out the faulty power
regulator boards in the Anti-Aliasing and
Anti-Imaging chassis. Both chassis are now
 AI_chassis_lights_on.jpegAA_chassis_lights_on.jpeg 
  248   Mon Oct 30 08:42:22 2023 JonUpdateVACVacuum Leak TestBy 5:30 pm Friday, the pressure had reached
8.6e-8 torr and was continuing to fall. So
it seems we are OK to proceed with permanentizing
 IMG_0659.pngIMG_0660.png 
  249   Mon Oct 30 11:03:56 2023 TylerUpdateScripts/Programs 
FLIR: After some adjustments, the plot
generated from the FLIR measurements look
much more symmetric (see attachment). There
 Screenshot_2023-10-23_at_12.39.05_PM.png 
  250   Mon Oct 30 18:15:13 2023 ShaneUpdateCDSCyMAC chassis mounted and progress on power connectionsAll CyMAC chassis mounted in electronics rack
today, and shelf for monitor also mounted.
Images attached. Assembled grounding cables
 electronics_rack_back.jpegelectronics_rack_front.jpegmounted_chassis.jpegpower_supply.jpeg 
  251   Tue Oct 31 19:46:35 2023 AidenUpdateVACVAC System Heating UpdateStarted bake 7 on Monday but found issues
with the heating as the cross in front of
the RGA got way too hot too quickly. This
 IMG_4745.jpgIMG_4744.jpg 
  252   Wed Nov 1 18:24:01 2023 ShaneUpdateCDSCyMAC Power connections made



Finished
power connections today for the CyMAC chassis.
Images attached. Had to switch the shrink
 cymac_power_connected.jpegcymac_power_connections_back.jpeg 
  253   Wed Nov 1 20:22:07 2023 AidenUpdateVACVAC System Heating UpdateRaised the PID controller temperature to 105C
today as at that temperature the lid and
the barrel temperature sensors were reading
  
  254   Thu Nov 2 17:14:36 2023 Shane, Jon UpdateCDSCyMAC set up permanentized



CyMAC connections
have been finalized and made permanent. Also
tested voltages, which are all looking good.
 cymac_chassis_back.jpegcymac_chassis_back2.jpegcymac_chassis_front.jpegfinal_connections_back_of_power_supply.jpegpower_supply_back.jpeg 
  255   Mon Nov 6 11:29:24 2023 TylerUpdateElectronicsPreliminary RTD Calculations, RP Software Update
Preliminary RTD calculations are shown
below, given an input of 10 V and desiring
a few mA of current. It looks like R_ref
 cvt.pngVvC.pngIMG_7471.jpg 
  256   Mon Nov 6 11:31:25 2023 PeterUpdateVLC UpdateVLC Mode MatchingSee Update Attached  VLC_Update_11_6_23.pdf 
  257   Wed Nov 8 17:55:49 2023 JonUpdateGeneralLab Clean-Up Day 1[Jon, Tyler, Shane, Peter, Luis]
Today we completed the first phase
of lab clean-up. Activities included:
  