Entry  Fri Oct 27 15:16:31 2023, Aiden, Update, VAC, Vacuum Leak Test 
    Reply  Mon Oct 30 08:42:22 2023, Jon, Update, VAC, Vacuum Leak Test IMG_0659.pngIMG_0660.png
Message ID: 246     Entry time: Fri Oct 27 15:16:31 2023     Reply to this: 248
Author: Aiden 
Type: Update 
Category: VAC 
Subject: Vacuum Leak Test 
Leak tested the worst flanges on the chamber after moving it and after bake 6. The 6 inch flange connected to the 8 inch reducing nipple is now leaking at 1.5 e-9, previously at 4 e-9. The 8 inch flange connected to the turbo pump is now leaking at 1.9 e-9, previously at 3 e-9. This means that the baking most likely improved the seals on these flanges and a hotter bake might fix the leaks for good.