ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 222     Entry time: Fri Sep 8 16:10:43 2023
Author: Aiden 
Type: Update 
Category: VAC 
Subject: VAC System Heating Update 
Turned off the PID controllers to let the chamber cool down. Final temperatures for the RGA cross and Turbo pump cross were 113 C and 80 C respectively. The system should be cool enough to start taking measurements on Monday.
ELOG V3.1.3-7933898