ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 211     Entry time: Wed Aug 16 17:17:02 2023
Author: Shane, Jon 
Type: Update 
Category: CDS 
Subject: Binary input chassis powering correctly  
Binary input chassis passed power-on test, and is lighting up as expected. Binary output chassis also successfully powered on. AA and AI chassis not powering on correctly, need to do some debugging to find the problem.
Attachment 1: IMG_9253.jpeg  2.231 MB  | Hide | Hide all
IMG_9253.jpeg
ELOG V3.1.3-7933898