ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 220     Entry time: Tue Sep 5 16:43:19 2023
Author: Aiden 
Type: Update 
Category: General 
Subject: VAC System Heating Update 
Checked on bake 5 today after 3 days of equilibrium. The RGA cross is at 106 C and the turbo pump cross is at 74 C. This was reached while the PID controllers were at 140 C. I will now slowly raise the temperature to 150 on the PID controllers and see if the difference in the RGA cross can be reduced.
ELOG V3.1.3-7933898