  70   Wed Apr 12 16:13:19 2023 CaoPhysicsVACVacuum prep and installationAiden, Pamella, Peter, Shane, Cao 


Today
we started vacuum chamber assembly work


10:16 am: Particle count measurement of clean
 VacAssy230412.png 
  378   Wed Jun 19 18:45:14 2024 LukeUpdate Vacuum chamber reassembly [Luke, Aiden, Mohak , Tyler]

On Tuesday
we had the silver screws for the spherical
cube shortened by a quarter of an inch so
 image_2024-06-19_182556383.pngimage_2024-06-19_182631737.pngIMG_1710.jpg 
  432   Sun Sep 1 16:17:40 2024 LukeUpdateVACVacuum chamber leak checking and re-applying heating tape[Luke, Luis, Cinthia, Michal, Tyler]
On the 26th Cinthia, Michal, and
I took off the insolation on the vacuum chamber
  
  384   Tue Jun 25 17:19:42 2024 LukeUpdateVACVacuum chamber leak checking Currently our main leak is in the RGA line.
We found this by closing the gate valve from
the main volume to see if which side was
 image_2024-06-25_170036021.pngimage_2024-06-25_170057738.pngimage_2024-06-25_170120030.pngimage_2024-06-25_171238788.png 
  386   Wed Jun 26 16:39:34 2024 LukeUpdateVACVacuum chamber leak checking On Tuesday I had isolated the main volume
and let it pump down over-night. Today, Wednesday,
I checked it and it had only gone down by
 image_2024-06-26_162539705.pngimage_2024-06-26_162601616.png 
  35   Tue Feb 28 13:53:17 2023 PamellaUpdateGeneralVacuum chamber cleaning Pamella, Dr. Richardson and Dr.Cao finished
checking and cleaning the interior of the
chamber, chamber lid, and exterior of the
 EE5E0296-D362-4EA6-B482-85A629D93B46.jpeg4C0AA805-667E-45AD-8704-03389BD63489.jpeg51CE3D1E-F48E-4F57-8450-8F58C27154BB.jpeg58ADE656-52AD-4F0E-88BA-B993F977A519.jpeg 
  130   Wed Jun 21 20:25:05 2023 CaoInfrastructureVACVacuum chamber bake attempt 1 TL;DR: 
We are not yet able to
bake the chamber at 150 deg C due to some
current limit, most likely caused power supply
 6x 
  136   Tue Jun 27 21:47:56 2023 JonInfrastructureVACVacuum chamber bake attempt 1The electrical overload problem encountered
in ELOG 130
has been resolved. The two heater controllers,
 IMG_0256.pngIMG_0257.pngIMG_0254.png 
  97   Fri May 12 20:28:34 2023 Aiden, CaoPhysicsVACVacuum chamber Helium leak test [Aiden, Cao] 

 
 1. Helium leak test 


2:00 pm: Uninstall regulator from nitrogen
 PXL_20230512_211717602.jpgArLeak_230512.png 
  239   Thu Oct 12 12:11:10 2023 AidenUpdateVACVacuum chamber Helium leak test[Aiden, Tyler, Peter, Jon]


Continued
tightening bolts on the turbo pump and 6"-8"
reducer to reduce the leak. The final leak
 IMG_4689.jpgIMG_4688.jpg 
  371   Fri May 31 19:37:47 2024 LukeUpdate Vacuum chamber Disassembly [Luke, Aiden, Jon, Michel, Tyler]

Work
done:
On Tuesday (5/28) we removed the RGA
line with minimal difficulty. On Wednesday
 IMG_1681.jpgIMG_1680.jpgIMG_1680.jpgIMG_1681.jpg 
  390   Fri Jun 28 18:15:16 2024 LukeUpdateVACVacuum chamber We will be configuring the RGA line to
remove the spherical cube from the system.
Currently our plan for the new design is
  
  138   Thu Jun 29 18:27:26 2023 Jon, CaoInfrastructureVACVacuum bake attempt 3: success![Jon, Cao]


 Summary : We resolved
problems with heaters tripping power and
were able to proceed with chamber baking
 NewInsulation.pngBypassLineInsulation.jpg 
  246   Fri Oct 27 15:16:31 2023 AidenUpdateVACVacuum Leak TestLeak tested the worst flanges on the chamber
after moving it and after bake 6. The 6 inch
flange connected to the 8 inch reducing nipple
  
  248   Mon Oct 30 08:42:22 2023 JonUpdateVACVacuum Leak TestBy 5:30 pm Friday, the pressure had reached
8.6e-8 torr and was continuing to fall. So
it seems we are OK to proceed with permanentizing
 IMG_0659.pngIMG_0660.png 
  18   Fri Jan 27 18:44:31 2023 Julian UpdateGeneralVacuum Chanmber CleaningI used the IPA wipes to wipe down the inside
of the chamber the best I could. I cleaned
the main chamber but not any of the connecting
  
  372   Mon Jun 3 09:24:48 2024 AidenUpdateVACVacuum Chamber RenderingHere is a new render of the vacuum chamber
that includes the 2.75 tee to place the Argon
leak right next to the RGA. The conical reducer
 VaccumChamberAssembly__Redesign_with_tee.jpgVaccumChamberAssembly__Redesign_with_tee_top.png 
  292   Fri Dec 15 14:03:02 2023 AidenHowToVACVacuum Chamber Opening[Aiden]

1. Turn off the RGA filament
and disconnect it.

2. Record the pressure
and then close the angle valve and gate valve
  
  348   Fri Mar 15 16:58:55 2024 AidenUpdateVACVacuum Chamber Frosti Testing[Luke, Luis, Aiden]

On Thursday, March
14 - Took preliminary RGA scans of the empty
chamber to compare later on. Vented the chamber
 bake12_240314_Empty_ArC.pngbake12_240314_Empty_ArO.png 
  27   Sat Feb 11 00:17:27 2023 JulianUpdateGeneralVacuum Chamber CleaningToday I finished wiping down the rest of the
vacuum chamber, specifically focusing on
the connecting ports and outside surface
 20230210_181404.jpg20230210_181424.jpg20230210_181541.jpg20230210_181606.jpg 
  33   Thu Feb 23 21:12:33 2023 JulianUpdateGeneralVacuum Chamber CleaningToday I was able to come in and wipe down
both sides of the vacuum chamber lid using
the regular alcohol wipes and also wipes
 ChamberLid_inside.jpgChamberLid_outside.jpgVacuumChamber_inside.jpg 
  34   Mon Feb 27 17:09:04 2023 Pamella UpdateGeneralVacuum Chamber CleaningPamella and Julian finished cleaning the interior
of the chamber, chamber lid, and the table.
We found some black residue on the side of
 Side_of_Table.jpegWipes_from_table.jpeg 
  145   Wed Jul 5 15:46:47 2023 Aiden, CaoInfrastructureVACVacuum Chamber Baking Update
Cao and Aiden put the RGA back on to
the chamber and measured the outgassing rate
after the chamber has cooled down from its
 bake1_230705.png 
  148   Thu Jul 6 16:16:03 2023 AidenSummaryVACVacuum Chamber Baking Update
Pressure Measured Before Removing Gauge
2.31 E-7 Torr.


Went in and turned
on the heating tape in increments of 30 degC
  
  168   Thu Jul 20 18:03:19 2023 AidenUpdateVACVacuum Chamber Baking Update
Took another set of RGA data after the
second bake has cooled down to 27 degC.


Just
by visual comparison to the other graphs,
 bake2_230720.png 
  179   Fri Jul 28 13:46:17 2023 AidenUpdateVACVacuum Chamber Baking Update
Took some more data to look at the HC
count. Initial data was from leaving the
Argon leak closed and then left it open for
 bake2_230720_ArC.pngbake2_230720_ArO.pngbake2_230728_Closed_Open.pngbake2_230728_Open_Open.png 
  184   Tue Aug 1 12:10:03 2023 AidenUpdateVACVacuum Chamber Baking Update
Dr. Richardson and I took off the insulation
on the lid again to add more insulation in-between
the heater tape folds in addition to what
 bake2_230801_ArC.pngbake2_230801_ArO.pngbake2_230801_Closed_Open.png 
  214   Mon Aug 21 17:13:25 2023 AidenUpdateVACVacuum Chamber Baking Update
Came in to take RGA data and found the
turbo pump drawing .38 Amps. This was much
higher than what it was on Friday. I investigated
 bake3_230821_ArC.pngbake3_230821_ArO.png 
  215   Mon Aug 28 14:43:50 2023 AidenUpdateVACVacuum Chamber Baking UpdateThe PID controllers were turned off on Friday
and the chamber was left to cool over the
weekend. Just took data and it looks like
 bake4_230828_ArC.pngbake4_230828_ArO.png 
  216   Tue Aug 29 19:09:21 2023 AidenUpdateVACVacuum Chamber Baking UpdateHere are some more plots with the RGA data
take August 29. It seems that more pumping
time has led to the HC levels being dramatically
 bake4_230829_ArO.pngbake4_230829_ArC.png 
  218   Thu Aug 31 12:56:29 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook some more RGA data to see if the HC levels
have further declined since bake 4 and it
seems that it has started to plateau with
 bake4_230831_ArC.pngbake4_230831_ArO.pngbake4_230829_ArO.png 
  226   Fri Sep 15 17:33:35 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook some more RGA data and see that the chamber
has gotten much cleaner since monday. Next
step would be another bake with some focus
 bake5_230915_ArC.pngbake5_230915_ArO.png 
  240   Thu Oct 19 11:41:04 2023 AidenUpdateVACVacuum Chamber Baking Update[Aiden, Tyler, Mohak]

Took some RGA
data when we came into the room. The pressure
of the chamber was 8.63e-8 Torr before turning
 6x 
  245   Thu Oct 26 13:00:45 2023 AidenUpdateVACVacuum Chamber Baking UpdateBake 6 was turned off on Monday. Tooke RGA
data today and have posted the data below.
The pressure of the chamber after taking
 bake6_231026_ArC.pngbake6_231026_ArO.png 
  258   Thu Nov 9 13:48:47 2023 AidenUpdateVACVacuum Chamber Baking UpdateAfter bake 7 was stopped on Wednesday morning
(11,8,2023), I took RGA data of the chamber
to compare to a later scan that will be done
 bake7_231109_ArC.pngbake7_231109_ArO.png 
  267   Wed Nov 15 21:52:33 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook RGA data before running the degas mode.
Made sure to close off the main volume before
running the degas. And left the filament
 bake7_231115_ArC.pngbake7_231115_ArO.png 
  284   Mon Dec 4 11:19:50 2023 AidenUpdateVACVacuum Chamber Baking Update[Aiden]

Took some RGA data of the chamber
after it has been cooling down. I do not
believe that this data accurately shows the
 bake8_231204_SSFasteners_ArO.pngbake8_231204_SSFasteners_ArC.pngDecember_04_Ar_Open_Stainless_Steel_Fasteners_Analyzed.pngbake8_231204_SSFasteners_ArO.png 
  286   Thu Dec 7 12:42:42 2023 AidenUpdateVACVacuum Chamber Baking UpdateAfter leaving the RGA on for a few days the
chamber has settled at 2.01 e-8 torr. I also
have good news that the chamber looks to
 December_06_Ar_Open_Stainless_Steel_Fasteners_Analyzed.pngbake8_231206_SSFasteners_ArO.png 
  296   Tue Dec 19 15:45:05 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook RGA data for the macor parts inside of
the chamber. With the Ar open the HC levels
read 30 torrl/s which is around where it
 bake9_231219_Macor_ArO.pngbake9_231219_Macor_ArC.png 
  340   Mon Feb 26 15:15:39 2024 AidenUpdateGeneralVacuum Chamber Baking UpdateStarted Bake 12 on Wednesday Feb. 21 and turned
the bake off on Saturday Feb. 24. This was
a normal low temp bake with the PID controllers
  
  293   Sun Dec 17 19:43:18 2023 AidenUpdateVACVac Heating Update[Aiden]

I measured the temperature of
the flanges where some of the electronics
will go and I found that the RGA flange was
  
  242   Mon Oct 23 07:28:57 2023 PeterUpdateVLC UpdateVLC Mode MatchingI have attached a pdf with slides of my latest
updates. 
 Carney_VLC_Update.pdf 
  256   Mon Nov 6 11:31:25 2023 PeterUpdateVLC UpdateVLC Mode MatchingSee Update Attached  VLC_Update_11_6_23.pdf 
  263   Mon Nov 13 06:15:45 2023 PeterUpdateVLC UpdateVLC Mode MatchingWeekly Updates Attached in pdf  VLC_Mode_Matching_3.pdf 
  221   Thu Sep 7 19:24:25 2023 PeterUpdateVLC UpdateVLC Launch ChainThe launch optics up to the Faraday Isolator
have been added to the breadboard. In the
first image, the optics are (from L to R)
 IMG-3404(1).jpgIMG-3408(1).jpg 
  234   Mon Oct 9 11:06:17 2023 PeterUpdateVLC UpdateVLC Launch ChainImplemented the new stage for the EOM. Took
power data at different positions in the
launch chain. Beam waist: 0.066mm (beam waist
 IMG-3540.jpgIMG-3538.jpgIMG-3533.jpgIMG-3522.jpg 
  304   Tue Jan 16 10:01:21 2024 PeterUpdateVLC UpdateVLC Faraday Isolator and Mode MatchingAttached is a PDF of my weekly updates.   VLC_Mode_Matching_Design_-_Remastered.pdf 
  288   Fri Dec 8 11:15:21 2023 PeterUpdateVLC UpdateVLC AssemblyThe optics of the visible light cavity have
been assembled. The mode matching telescope
is folded through the two stirring mirrors
 IMG_4194.jpgIMG_4195.jpgIMG_4197.jpgIMG_4196.jpg 
  360   Mon Apr 15 11:51:03 2024 PeterUpdateVLC UpdateVLCAn update on the VLC project is attached below:  VLC_Update_April_15_2024.pdf 
  368   Mon May 13 14:53:29 2024 PeterUpdateVLC UpdateVLCVLC Update WEEK 7 attached below  VLC_Update.pdf 
ELOG V3.1.3-7933898