69
|
Wed Apr 12 10:53:02 2023 |
Aiden | Summary | General | Valve Cleaning | Bagged and Tagged the parts from batch 10
and placed them inside the clean room.
Then
cleaned the last gate valve in liquinox for |
|
335
|
Thu Feb 22 21:48:16 2024 |
Jon | Update | VAC | Vacuum vent for RGA testing of reflector | [Jon, Tyler, Luke, Aiden]
Summary
Following
Wednesday's cleanroom cleaning [333],
we proceeded to vent the vacuum chamber, |
 |
238
|
Wed Oct 11 20:47:11 2023 |
Jon | Update | VAC | Vacuum upgrade begins | [Jon, Tyler, Aiden, Peter]
Upgrade of the UHV system to a larger
turbo pump began today. After obtaining a |
  |
489
|
Sat Dec 14 07:58:25 2024 |
Luis | Update | VAC | Vacuum sytem staus and Viton O-rings | [Luis]
RGA Volume:
T = 23°C, P = 1.71e-9 Torr
Main Volume: |
|
512
|
Fri Feb 14 12:15:23 2025 |
Luis | Update | VAC | Vacuum sytem staus |
[Luis, Luke, Ma]
February 12, 2025 - 4:00
PM |
 |
491
|
Tue Dec 17 13:53:53 2024 |
Luis | Update | VAC | Vacuum system status | [Luis]
The vacuum system is being
baked. I disconnected the digital gages and
the magnets, opened the Ar leak and started |
|
74
|
Fri Apr 21 00:06:43 2023 |
Jon | Update | VAC | Vacuum prep and installation - parts have arrived | The two parts needed to complete the vacuum
assembly (ELOG
70) have arrived. |
|
70
|
Wed Apr 12 16:13:19 2023 |
Cao | Physics | VAC | Vacuum prep and installation | Aiden, Pamella, Peter, Shane, Cao
Today
we started vacuum chamber assembly work
10:16 am: Particle count measurement of clean |
|
378
|
Wed Jun 19 18:45:14 2024 |
Luke | Update | | Vacuum chamber reassembly | [Luke, Aiden, Mohak , Tyler]
On Tuesday
we had the silver screws for the spherical
cube shortened by a quarter of an inch so |
  |
432
|
Sun Sep 1 16:17:40 2024 |
Luke | Update | VAC | Vacuum chamber leak checking and re-applying heating tape | [Luke, Luis, Cinthia, Michal, Tyler]
On the 26th Cinthia, Michal, and
I took off the insolation on the vacuum chamber |
|
384
|
Tue Jun 25 17:19:42 2024 |
Luke | Update | VAC | Vacuum chamber leak checking | Currently our main leak is in the RGA line.
We found this by closing the gate valve from
the main volume to see if which side was |
   |
386
|
Wed Jun 26 16:39:34 2024 |
Luke | Update | VAC | Vacuum chamber leak checking | On Tuesday I had isolated the main volume
and let it pump down over-night. Today, Wednesday,
I checked it and it had only gone down by |
 |
35
|
Tue Feb 28 13:53:17 2023 |
Pamella | Update | General | Vacuum chamber cleaning | Pamella, Dr. Richardson and Dr.Cao finished
checking and cleaning the interior of the
chamber, chamber lid, and exterior of the |
   |
130
|
Wed Jun 21 20:25:05 2023 |
Cao | Infrastructure | VAC | Vacuum chamber bake attempt 1 | TL;DR:
We are not yet able to
bake the chamber at 150 deg C due to some
current limit, most likely caused power supply |
6x |
136
|
Tue Jun 27 21:47:56 2023 |
Jon | Infrastructure | VAC | Vacuum chamber bake attempt 1 | The electrical overload problem encountered
in ELOG 130
has been resolved. The two heater controllers, |
  |
97
|
Fri May 12 20:28:34 2023 |
Aiden, Cao | Physics | VAC | Vacuum chamber Helium leak test | [Aiden, Cao]
1. Helium leak test
2:00 pm: Uninstall regulator from nitrogen |
 |
239
|
Thu Oct 12 12:11:10 2023 |
Aiden | Update | VAC | Vacuum chamber Helium leak test | [Aiden, Tyler, Peter, Jon]
Continued
tightening bolts on the turbo pump and 6"-8"
reducer to reduce the leak. The final leak |
 |
371
|
Fri May 31 19:37:47 2024 |
Luke | Update | | Vacuum chamber Disassembly | [Luke, Aiden, Jon, Michel, Tyler]
Work
done:
On Tuesday (5/28) we removed the RGA
line with minimal difficulty. On Wednesday |
   |
390
|
Fri Jun 28 18:15:16 2024 |
Luke | Update | VAC | Vacuum chamber | We will be configuring the RGA line to
remove the spherical cube from the system.
Currently our plan for the new design is |
|
481
|
Sat Nov 30 12:41:42 2024 |
Luke | Update | VAC | Vacuum bake end | The
vacuum chamber has stopped bakeing.
Current state as of 12:10, 11/30/2024: |
|
138
|
Thu Jun 29 18:27:26 2023 |
Jon, Cao | Infrastructure | VAC | Vacuum bake attempt 3: success! | [Jon, Cao]
Summary : We resolved
problems with heaters tripping power and
were able to proceed with chamber baking
|
 |
511
|
Fri Feb 14 11:57:50 2025 |
Luis | Update | VAC | Vacuum Update | [Luis]
Feb/11/25 9:30am
Pressure gages were connected. |
|
246
|
Fri Oct 27 15:16:31 2023 |
Aiden | Update | VAC | Vacuum Leak Test | Leak tested the worst flanges on the chamber
after moving it and after bake 6. The 6 inch
flange connected to the 8 inch reducing nipple |
|
248
|
Mon Oct 30 08:42:22 2023 |
Jon | Update | VAC | Vacuum Leak Test | By 5:30 pm Friday, the pressure had reached
8.6e-8 torr and was continuing to fall. So
it seems we are OK to proceed with permanentizing |
 |
18
|
Fri Jan 27 18:44:31 2023 |
Julian | Update | General | Vacuum Chanmber Cleaning | I used the IPA wipes to wipe down the inside
of the chamber the best I could. I cleaned
the main chamber but not any of the connecting |
|
372
|
Mon Jun 3 09:24:48 2024 |
Aiden | Update | VAC | Vacuum Chamber Rendering | Here is a new render of the vacuum chamber
that includes the 2.75 tee to place the Argon
leak right next to the RGA. The conical reducer |
 |
292
|
Fri Dec 15 14:03:02 2023 |
Aiden | HowTo | VAC | Vacuum Chamber Opening | [Aiden]
1. Turn off the RGA filament
and disconnect it.
2. Record the pressure
and then close the angle valve and gate valve |
|
348
|
Fri Mar 15 16:58:55 2024 |
Aiden | Update | VAC | Vacuum Chamber Frosti Testing | [Luke, Luis, Aiden]
On Thursday, March
14 - Took preliminary RGA scans of the empty
chamber to compare later on. Vented the chamber |
 |
27
|
Sat Feb 11 00:17:27 2023 |
Julian | Update | General | Vacuum Chamber Cleaning | Today I finished wiping down the rest of the
vacuum chamber, specifically focusing on
the connecting ports and outside surface |
   |
33
|
Thu Feb 23 21:12:33 2023 |
Julian | Update | General | Vacuum Chamber Cleaning | Today I was able to come in and wipe down
both sides of the vacuum chamber lid using
the regular alcohol wipes and also wipes |
  |
34
|
Mon Feb 27 17:09:04 2023 |
Pamella | Update | General | Vacuum Chamber Cleaning | Pamella and Julian finished cleaning the interior
of the chamber, chamber lid, and the table.
We found some black residue on the side of |
 |
145
|
Wed Jul 5 15:46:47 2023 |
Aiden, Cao | Infrastructure | VAC | Vacuum Chamber Baking Update |
Cao and Aiden put the RGA back on to
the chamber and measured the outgassing rate
after the chamber has cooled down from its |
|
148
|
Thu Jul 6 16:16:03 2023 |
Aiden | Summary | VAC | Vacuum Chamber Baking Update |
Pressure Measured Before Removing Gauge
2.31 E-7 Torr.
Went in and turned
on the heating tape in increments of 30 degC |
|
168
|
Thu Jul 20 18:03:19 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update |
Took another set of RGA data after the
second bake has cooled down to 27 degC.
Just
by visual comparison to the other graphs, |
|
179
|
Fri Jul 28 13:46:17 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update |
Took some more data to look at the HC
count. Initial data was from leaving the
Argon leak closed and then left it open for |
   |
184
|
Tue Aug 1 12:10:03 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update |
Dr. Richardson and I took off the insulation
on the lid again to add more insulation in-between
the heater tape folds in addition to what |
  |
214
|
Mon Aug 21 17:13:25 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update |
Came in to take RGA data and found the
turbo pump drawing .38 Amps. This was much
higher than what it was on Friday. I investigated |
 |
215
|
Mon Aug 28 14:43:50 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | The PID controllers were turned off on Friday
and the chamber was left to cool over the
weekend. Just took data and it looks like |
 |
216
|
Tue Aug 29 19:09:21 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | Here are some more plots with the RGA data
take August 29. It seems that more pumping
time has led to the HC levels being dramatically |
 |
218
|
Thu Aug 31 12:56:29 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | Took some more RGA data to see if the HC levels
have further declined since bake 4 and it
seems that it has started to plateau with |
  |
226
|
Fri Sep 15 17:33:35 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | Took some more RGA data and see that the chamber
has gotten much cleaner since monday. Next
step would be another bake with some focus |
 |
240
|
Thu Oct 19 11:41:04 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | [Aiden, Tyler, Mohak]
Took some RGA
data when we came into the room. The pressure
of the chamber was 8.63e-8 Torr before turning |
6x |
245
|
Thu Oct 26 13:00:45 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | Bake 6 was turned off on Monday. Tooke RGA
data today and have posted the data below.
The pressure of the chamber after taking |
 |
258
|
Thu Nov 9 13:48:47 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | After bake 7 was stopped on Wednesday morning
(11,8,2023), I took RGA data of the chamber
to compare to a later scan that will be done |
 |
267
|
Wed Nov 15 21:52:33 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | Took RGA data before running the degas mode.
Made sure to close off the main volume before
running the degas. And left the filament |
 |
284
|
Mon Dec 4 11:19:50 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | [Aiden]
Took some RGA data of the chamber
after it has been cooling down. I do not
believe that this data accurately shows the |
   |
286
|
Thu Dec 7 12:42:42 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | After leaving the RGA on for a few days the
chamber has settled at 2.01 e-8 torr. I also
have good news that the chamber looks to |
 |
296
|
Tue Dec 19 15:45:05 2023 |
Aiden | Update | VAC | Vacuum Chamber Baking Update | Took RGA data for the macor parts inside of
the chamber. With the Ar open the HC levels
read 30 torrl/s which is around where it |
 |
340
|
Mon Feb 26 15:15:39 2024 |
Aiden | Update | General | Vacuum Chamber Baking Update | Started Bake 12 on Wednesday Feb. 21 and turned
the bake off on Saturday Feb. 24. This was
a normal low temp bake with the PID controllers |
|
532
|
Tue Mar 4 10:47:03 2025 |
Shane | Update | CDS | Vac system pinouts | Attached here are the pinouts, as we currently
know them, for the vacuum system. The three