Entry  Mon Oct 9 16:59:21 2023, Shane, Jon, Update, CDS, timing chassis power cable and AI chassis testing for CyMAC IMG_1457.jpeg
[Shane, Jon]
    Today's CyMAC work:
  • Finished assembling external power supply cable for the timing chassis (see attached image)
  • Also did some debugging of AA and AI chassis re: power issues. After testing voltages at various test points on the power regulator board (TP1-TP6) in the AA chassis, it seems like it's the source of the problem. Used bench DC power supply to test, running 15V, and the correct voltage is coming in to the board but something significantly smaller is being output. We're also getting unexpected negative signs on voltage at certain test points, with leads in correct positions
  • Upon further examination, it looks like the lights on the filter boards are actually turning on (in both the AA and AI chassis), though it's only 2/4 lights on each board and they are very faint
  • Corrected DC on/off switch spade lug orientation in AI chassis.
  • Tested AI chassis power regulator board to see if the problem was the same, and found again that voltage coming in was correct, and voltage going out was not.
  • In case of interest in exact numbers, results were as follows:
    • Voltage difference between TP1(+Vin) and TP6(-Vin) is ~30V
    • Voltage difference between grounded chassis wall and TP1 (+Vin) is ~15V
    • Voltage difference between grounded chassis wall and TP6(-Vin) is ~-15 V
    • voltage difference between TP2(+Vout) and TP5(-Vout) is ~3V
    • Voltage difference between TP3 (gnd) and TP2(+Vout) is -0.065V
    • Voltage difference between TP5(-Vout) and ground is ~3V
Entry  Mon Apr 15 15:25:10 2024, Cynthia, Update, Interferometer Simulations, progress on simulation so far LIGO_update_week3_(2).pdf
 
Entry  Mon Jul 15 15:44:52 2024, Cynthia , Update, Interferometer Simulations, performed cavity scans with thermal effects and ring heater cavity_scan_07_15.pdf
 
Entry  Mon Apr 8 14:57:41 2024, Cynthia, Pooyan, Update, Interferometer Simulations, performed cavity scans for O4 O5, and coupled cavity  LIGO_update_week1.pdf
 
Entry  Wed Jan 31 14:37:26 2024, Shane, Summary, CDS, path directions for CyMAC model and parts library 
Path to cds parts library in Matlab simulink: /usr/share/advligorts/src/src/epics/simLink. File name CDS_PARTS.mdl Path to user models: /opt/rtcds/usercode/models, using file name c1msc.mdl
Entry  Fri Nov 10 14:16:04 2023, shane, Update, Cleanroom, new cleanroom zone diagram cleanroom_zones_nov2023.jpg
since the vac system has been moved and made permanent, here's a new diagram of the cleanroom zones. The zones themselves haven't moved, but the diagram has been updated to reflect the new set up of the cleanroom.
Entry  Mon Aug 7 13:58:46 2023, shane, Update, CDS, internal power supply cables done for AI chassis IMG_8674.jpeg
Finished assembling and installing the aLigo chassis internal power supply cables in the anti-imaging chassis today. Tested for continuity and everything looked good. Chassis lid still secured with two temporary screws because I'm not sure what the correct size is.
Entry  Fri Jul 28 13:39:39 2023, shane, Update, Cleanroom, full 5 zone cleanroom particle count download.png
Here's the 5 zone cleanroom measurement from today.
Entry  Tue May 7 20:34:31 2024, shane, Update, CDS, frosti MEDM screen update FROSTIMEDMMay7.2024.png
[Luis, Shane] Here is the updated MEDM screen, with new orientation and updated labeling to reflect the actual positions of the heater elements. Note that indices start at T0 to be consistent with simulink model, though in the previous elog for the FROSTI layout the heater elements are labeled 1-8. Also, we finally learned how to take a screenshot on debian.
Entry  Wed Aug 16 16:55:40 2023, Shane, Jon, Update, CDS, external power supply cables finished IMG_9251.jpeg
All four external power supply cables for the CyMAC chassis are now assembled. Using them now to test if chassis power up correctly.
Entry  Mon Aug 26 14:42:04 2024, Cynthia , Update, Interferometer Simulations, current status on cavity scan with effects of FROSTI LIGO_updates_8_26.pdf
I used the code and arm cavity model used for previous O5 study on mirrors and HOM (the pdf of the study and the result can be found at https://dcc.ligo.org/LIGO-G2100878), but it seems like the result I obtained is different from the study result. Since my cavity scans codes have a large portion of it relying on this code, I will have to go over the study result and the code to make sure there is no issue with that code itself first. There are also some other updates or issued encountered when I tried to plot the mirror maps with effects of FROSTI.
Entry  Mon Sep 23 15:00:41 2024, Cynthia , Update, Interferometer Simulations, corrections on assumption for O5 coating Uncoated_S1_ETM07-v2.pdf
The document recording ETM07 and ETM08 coating (T2300093) was discussed: the current plume files are not necessarily correct in a way that LIGO lab have tried to add it on uncoated ETM such as ETM07 and it does not match what the coated ETM07 would look like. the plume should be added on top of the uncoated ETM instead of assuming an ideal ETM. According to Garilynn, the imperfection on uncoated ETM matters. So far the possible ETM data used for O5, ETM 11,14,19, and 20 are all uncoated, and different ways could be used to predict the plume, including the plume data on LIGO dcc or subtract the uncoated data from the coated for O4 ETM and use that as another guessed plume.
Entry  Wed Apr 26 18:05:41 2023, Pamella, Julian, Shane, Update, Cleanroom, cleanroom particle counts and cleaning log counts4_26_23.png
  • pre-cleaning particle counts:
    • zone 3
      • 0.3 mu: 2494
      • 0.5 mu: 748
      • 1.0 mu 124
    • zone 4
      • 0.3 mu: 374
      • 0.5 mu: 41
      • 1.0 mu: 0
  • 3:45 pm: Started wiping the surfaces(laser table,chamber, computer) inside the cleaning room.
  • 4:05 pm: Finished wiped the surfaces
  • 4:08 pm: Began vacuuming cleanroom floor
  • 4:28 pm: Finished vacuuming cleanroom floor.
  • 4:29 pm: Began mopping the cleanroom floor.
  • 5:15 pm: Finished cleanroom clean.
  • 6:00 pm: post-cleaning particle counts (full 5 zone measurement) attached below
Entry  Wed May 31 12:16:28 2023, Shane, Update, Cleanroom, cleanroom particle counts (full 5 zone measurement) 23.png
Attached is the full 5 zone particle measurement for the cleanroom after this week's cleaning, 5/31/23.
Entry  Wed Feb 7 12:43:22 2024, shane, Update, Cleanroom, cleanroom particle counts (full 5 zone measurement) 24.png
Here's today's full 5 zone measurement of the cleanroom. Everything is back under the requirement.
Entry  Fri Jul 28 13:07:39 2023, Shane, Aiden , Update, Cleanroom, cleanroom cleaning and particle count 6x
[Aiden, Shane]

cleaning cleanroom and particle count

  • 11:08 am: started particle count
    • zone 3:
      • 0.3 u: 4198
      • 0.5 u: 1080
      • 1.0 u: 581
    • zone 4:
      • 0.3 u: 1247
      • 0.5 u: 623
      • 1.0 u: 415
  • 11:24 am: break for removal of vac chamber insulation (pictures attached), with counts before removal as seen above, and counts after removal/replacement for zone 3 as follows:
    • zone 3:
      • 0.3 u: 2993
      • 0.5 u: 415
      • 1.0 u: 207
  • 12:02 pm: began surface check and wipedown
  • 12:13 pm: started vacuuming the floor
  • 12:25 pm: finished vacuuming the floor
  • 12:26 pm: started mopping the floor
  • 12:32 pm: finished mopping the floor
  • 12:32 pm: started cleaning the buckets
  • 12:37 pm: started mopping with IPA wipes
  • 12:43 pm: finished mopping with IPA wipes
  • 12:45 pm: changed sticky floor mats
  • 12:47 pm: started particle count
    • zone 3:
      • 0.3 u: 2951
      • 0.5 u: 290
      • 1.0 u: 41
    • zone 4:
      • 0.3 u: 290
      • 0.5 u: 0
      • 1.0 u: 0
Entry  Thu Nov 9 13:57:58 2023, Shane, Luis, Aiden, Tyler, Update, Cleanroom, cleanroom cleaning and particle count 
[Aiden, Shane, Luis, Tyler]

cleaning cleanroom and particle count

  • 12:30 pm: Tyler and Aiden started organizing cables in cleanroom
  • 12:35 pm: started particle count in flow bench
    • 0.3 u: 11681
    • 0.5 u: 3284
    • 1.0 u: 1039
  • 12:50 pm: started cleanroom particle count
    • zone 3:
      • 0.3 u: 14549
      • 0.5 u: 10351
      • 1.0 u: 6194
    • zone 4:
      • 0.3 u: 10808
      • 0.5 u: 4655
      • 1.0 u: 1953
  • 1:07 pm: began surface check and wipedown, including softwalls
  • 1:19 pm: started vacuuming the floor
  • 1:28 pm: finished vacuuming the floor
  • 1:29 pm: started mopping the floor
  • 1:33 pm: finished mopping the floor
  • 1:34 pm: started cleaning the buckets
  • 1:37 pm: started mopping with IPA wipes
  • 1:39 pm: finished mopping with IPA wipes
  • 1:40 pm: changed sticky floor mats
  • 1:41 pm: started particle count
    • zone 3:
      • 0.3 u: 8397
      • 0.5 u: 5071
      • 1.0 u: 2618
    • zone 4:
      • 0.3 u: 6651
      • 0.5 u: 4323
      • 1.0 u: 2120
Entry  Thu Dec 7 14:13:15 2023, Shane, Update, Cleanroom, cleanroom cleaning and particle count 
[Aiden, Shane, Michael, Luke, Cynthia]

cleaning cleanroom and particle count

  • 12:30 pm: ran zero count test on particle counter
  • 12:32 pm: started particle count.
    • zone 3:
      • 0.3 u: 59,488
      • 0.5 u: 9561
      • 1.0 u: 706
    • zone 4:
      • 0.3 u: 7732
      • 0.5 u: 1912
      • 1.0 u: 290

    NOTE: Frame ceiling tile collapsed in cleanroom, explaining insanely high 0.3 u particle count in zone 3 (nearly 6 times above limit). Wiped down tile and put it back in ceiling frame.

  • 12:56 pm: began surface check and wipedown, including softwalls
  • 1:16 pm: started vacuuming the floor
  • 1:32 pm: finished vacuuming the floor
  • 1:33 pm: started mopping the floor
  • 1:47 pm: finished mopping the floor
  • 1:48 pm: started cleaning the buckets
  • 1:53 pm: started mopping with IPA wipes
  • 2:05 pm: finished mopping with IPA wipes
  • 2:06 pm: changed sticky floor mats
  • 1:53 pm: started particle count
    • zone 3:
      • 0.3 u: 6401
      • 0.5 u: 3450
      • 1.0 u: 1787
    • zone 4:
      • 0.3 u: 4073
      • 0.5 u: 2452
      • 1.0 u: 1039
Entry  Wed Jan 10 15:27:18 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count 
[Aiden, Shane]

cleaning cleanroom and particle count

  • 2:03 pm: changed sticky floor mats
  • 2:05 pm: started particle count
    • zone 3:
      • 0.3 u: 4863
      • 0.5 u: 1205
      • 1.0 u: 872
    • zone 4:
      • 0.3 u: 1953
      • 0.5 u: 789
      • 1.0 u: 457
  • 2:35 pm: began surface check and wipedown, including softwalls and ceiling tiles
  • 2:45 pm: started vacuuming the floor
  • 2:56 pm: finished vacuuming the floor
  • 2:57 pm: started mopping the floor
  • 3:01 pm: finished mopping the floor
  • 3:02 pm: started cleaning the buckets
  • 3:05 pm: started mopping with IPA wipes
  • 3:08 pm: finished mopping with IPA wipes
  • 3:09 pm: started particle count
    • zone 3:
      • 0.3 u: 5528
      • 0.5 u: 2203
      • 1.0 u: 1662
    • zone 4:
      • 0.3 u: 1080
      • 0.5 u: 415
      • 1.0 u: 332
Entry  Fri Feb 2 19:18:24 2024, shane, Update, Cleanroom, cleanroom cleaning and particle count 
[Aiden, Shane, Luis, Luke]

cleaning cleanroom and particle count

  • 5:10 pm: ran zero count test on particle counter
  • 5:14 pm: started particle count

    NOTE: initial counts are significantly above allowed limit. ~10 times larger than ISO class 5 standard in the smallest size range. Realized partway through ceiling tile changes that the power/lights for some of the hepa fans in the ceiling frame had been turned off. May explain this high number. Have since turned fans back back on.

    • zone 3:
      • 0.3 u: 109208
      • 0.5 u: 16337
      • 1.0 u: 581
    • zone 4:
      • 0.3 u: 51340
      • 0.5 u: 9228
      • 1.0 u: 581
  • 5:33 pm: started replacing ceiling tiles
  • 6:25 pm: began surface check and wipedown, including softwalls
  • 6:33 pm: started vacuuming the floor
  • 6:45 pm: finished vacuuming the floor
  • 6:45 pm: started mopping the floor
  • 6:50 pm: finished mopping the floor
  • 6:52 pm: started cleaning the buckets
  • 6:53 pm: started mopping with IPA wipes
  • 6:58 pm: finished mopping with IPA wipes
  • 6:59 pm: changed sticky floor mats
  • 7:00 pm: started particle count
    • zone 3:
      • 0.3 u: 5404
      • 0.5 u: 1413
      • 1.0 u: 41
    • zone 4:
      • 0.3 u: 1704
      • 0.5 u: 332
      • 1.0 u: 166
Entry  Wed Feb 21 11:58:30 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count 
[Luke, Shane, Tyler]

cleaning cleanroom and particle count

  • 11:50 am: ran zero count test on particle counter
  • 11:55 am: started particle count
    • zone 3:
      • 0.3 u: 1787
      • 0.5 u: 581
      • 1.0 u: 166
    • zone 4:
      • 0.3 u: 623
      • 0.5 u: 290
      • 1.0 u: 124
  • 12:17 pm: began surface check and wipedown, including softwalls
  • 12:25 pm: started vacuuming the floor
  • 12:36 pm: finished vacuuming the floor
  • 12:44 pm: started mopping the floor
  • 12:57 pm: finished mopping the floor
  • 12:58 pm: started cleaning the buckets
  • 12:59 pm: started mopping with IPA wipes
  • 1:05 pm: finished mopping with IPA wipes
  • 1:06 pm: changed sticky floor mats
  • 1:08 pm: started particle count
    • zone 3:
      • 0.3 u: 1621
      • 0.5 u: 581
      • 1.0 u: 332
    • zone 4:
      • 0.3 u: 1080
      • 0.5 u: 457
      • 1.0 u: 249
Entry  Tue Jun 25 12:34:18 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count 
[Luke, Shane, Xuejun, Mohak, Michael, Tyler, Cynthia]

cleaning cleanroom and particle count

  • 10:45 am: ran zero count test on particle counter
  • 11:02 am: started particle count
    • zone 3:
      • 0.3 u: 3284
      • 0.5 u: 1247
      • 1.0 u:332
    • zone 4:
      • 0.3 u: 1829
      • 0.5 u: 581
      • 1.0 u: 207
  • 11:15 am: began hepavac of rest of lab
  • 11:19 am: began surface check and wipedown, including softwalls
  • 11:32 am: finished hepavac of rest of lab
  • 11:35 am: started vacuuming the cleanroom floor
  • 11:45 am: finished vacuuming the floor
  • 11:47 am: started mopping the floor
  • 11:55 am: finished mopping the floor
  • 11:56 am: started cleaning the buckets
  • 11:57 am: started mopping with IPA wipes
  • 12:02 pm: finished mopping with IPA wipes
  • 12:03 pm: changed sticky floor mats
  • 12:04 pm: started particle count
    • zone 3:
      • 0.3 u: 3117
      • 0.5 u: 374
      • 1.0 u: 124
    • zone 4:
      • 0.3 u: 4531
      • 0.5 u: 540
      • 1.0 u: 0
Entry  Tue Jun 27 12:09:37 2023, Shane, Update, Cleanroom, cleanroom 5 zone particle count measurement 23.png
Attached is 5 zone measurement for cleanroom particulate count. Zone 3 (in front of vacuum chamber) higher than usual, likely due to recent vac work. Slightly above ISO class 5 standard in 1.0 micron range, measuring 997 particles/cubic meter while ISO standard is 832 particles/cubic meter in this range. Zero count test on particle counter performed prior to today's measurement.
Entry  Thu Jan 18 18:06:49 2024, shane, Update, Cleanroom, cleanroom 5 zone particle count measurement 24.png
Here's today's full five zone measurement of the cleanroom
Entry  Thu Jun 27 13:42:02 2024, Shane, Update, Cleanroom, cleanroom 5 zone particle count measurement 24.png
Here's today's 5 zone measurement of the cleanroom. We're above the limit by a bit in zone three (all three size ranges), likely as a result of the recent work installing FROSTI, so it could probably use another focused cleaning. Everything else is below the limit.
Entry  Thu Jul 6 13:34:48 2023, Pamella, Shane, Julian, Aiden, Update, Cleanroom, cleaning and particle count 
[Pamella, Julian, Aiden, and Shane]

    cleaning cleanroom and particle count

  • 12:00 pm: started particle count
    • Zone 3:
        0.3 u: 2826
        0.5 u: 457
        1.0 u: 166
    • Zone 4:
        0.3 u: 457
        0.5 u: 83
        1.0 u: 41
  • 12:17 pm: began surface check and wipedown. NOTE: found a few ants crawling up the metal table frame and on the desk
  • 12:29 pm: started vacuuming the floor
  • 12:45 pm: Finished vacuuming the floor
  • 12:46 pm: Started mopping the floor
  • 12:52 pm: Finished mopping the floor
  • 12:55 pm: Started cleaning the buckets
  • 1:02 pm: Started mopping with IPA wipes
  • 1:11 pm: Finished mopping with IPA wipes
  • 1:12 pm: Changed sticky floor mats
  • 1:14 pm: started particle count
    • Zone 3:
        0.3 u: 2577
        0.5 u: 457
        1.0 u: 166
    • Zone 4:
        0.3 u: 457
        0.5 u: 41
        1.0 u: 0
Entry  Wed Jul 19 14:39:19 2023, Pamella, Shane, Aiden, Update, Cleanroom, cleaning and particle count 
[Pamella, Shane, Aiden]

cleaning cleanroom and particle count

  • 1:10 pm: started particle count
    • Zone 3:
        0.3 u: 2535
        0.5 u: 207
        1.0 u: 41
    • Zone 4:
        0.3 u: 789
        0.5 u: 41
        1.0 u: 0
  • 1:30 pm: began surface check and wipedown
  • 1:41 pm: started vacuuming the floor
  • 1:55 pm: finished vacuuming the floor
  • 1:57 pm: started mopping the floor
  • 2:01 pm: finished mopping the floor
  • 2:02 pm: started cleaning the buckets
  • 2:08 pm: started mopping with IPA wipes
  • 2:17 pm: finished mopping with IPA wipes
  • 2:18 pm: changed sticky floor mats
  • 2:19 pm: started particle count
    • Zone 3:
        0.3 u: 3990
        0.5 u: 1080
        1.0 u: 374
    • Zone 4:
        0.3 u: 540
        0.5 u: 207
        1.0 u: 0
Entry  Fri Sep 29 11:22:33 2023, Shane, Aiden, Update, Cleanroom, cleaning and particle count 
[Aiden, Shane]

cleaning cleanroom and particle count

  • 10:06 am: ran zero count test on particle counter
  • 10:07 am: started particle count
    • zone 3:
      • 0.3 u: 2203
      • 0.5 u: 831
      • 1.0 u: 540
    • zone 4:
      • 0.3 u: 374
      • 0.5 u: 124
      • 1.0 u: 124
  • 10:25 am: began surface check and wipedown
  • 10:34 am: started vacuuming the floor
  • 10:44 am: finished vacuuming the floor
  • 10:45 am: started mopping the floor
  • 10:49 am: finished mopping the floor
  • 10:50 am: started cleaning the buckets
  • 10:57 am: started mopping with IPA wipes
  • 11:01 am: finished mopping with IPA wipes
  • 11:02 am: changed sticky floor mats
  • 11:03 am: started particle count
    • zone 3:
      • 0.3 u: 2535
      • 0.5 u: 374
      • 1.0 u: 166
    • zone 4:
      • 0.3 u: 581
      • 0.5 u: 41
      • 1.0 u: 0
Entry  Sat Feb 11 17:09:29 2023, Shane, Update, General, clean room particle counts 2/10/23 occupied2.10.23.pdfunoccupied2.10.23.pdfparticlecounts2.10.23.PDF
Took a round of clean room counts after the latest clean of vacuum chamber on Feb 10. Used 60 second sample time, 5 samples for each of the 5 zones. Plots attached for both occupied clean room (one person inside, attachment 1) and unoccupied clean room (empty attachment 2), as well as the raw data from the particle counter (attachment 3).
Entry  Fri Feb 3 13:04:04 2023, shane, Summary, General, clean room particle counts 1/25/23 cleanroomcountsJan25.pdf
Clean room count graphs for each zone (as of January 25, 2023) attached
Entry  Mon Aug 19 07:11:55 2024, Cynthia, Update, Interferometer Simulations, cavity scans with FROSTI effects  LIGO_update_8_19.pdf
 
Entry  Tue Feb 27 09:06:29 2024, Cynthia , Update, Interferometer Simulations, cavity scan with higher order input laser ligoPre_2_27.pdf
I performed a few cavity scan with the inputing laser with a different mode (not pure 00). For each laser I included a graph for just plotting the order with highest power (for example 1st order laser input the first plot only scanned for 1st order in that cavity), and I have also included a graph scanning for order 1-10.
Entry  Wed Oct 2 13:38:00 2024, Cynthia, Update, Interferometer Simulations, cavity scan with averaged O4 ETM coating as plume O5plumevsCoating.pngO5CoatAvgpt5.pngO5AVgcoatingFROSTIpt5.PNG
 
Entry  Mon Apr 22 15:06:33 2024, Cynthia , Update, Interferometer Simulations, cavity scan update LIGO_4_22.pdf
[Cynthia,Pooyan] Completed some simulations injecting 0-10th order modes. Some graphs will be used for the poster after some further titles, axis, and range adjustments.
Entry  Mon Jul 15 14:28:32 2024, Pooyan, Update, Interferometer Simulations, aLIGO test mass surface profiles  

Created a Google Slides presentation to summarize all the mirror surface map information that we use for simulating interferometers. 

A+ expected maps are based on correspondence with G. Billingsley. The estimate for the A+ ITMs will be to take the “as polished” data and add coating non-uniformity to it. (T2000398) Neither of these are scaled for the precise thickness of the Ti:Ge coatings.

Google Slides link: https://docs.google.com/presentation/d/1ge-ciAiEdNyyTvSShYdZz2JpACFRY2W3JDpxHRqMnOQ/edit?usp=sharing

 

 

 

Entry  Mon Jul 15 15:52:40 2024, Michael, Update, Interferometer Simulations, aLIGO locking with varying SRC mirrors and measuring mode mismatch SRC_Astigmatism_Analysis_7_15_24.pdf
 
Entry  Mon Sep 16 15:18:59 2024, Cynthia , Update, Interferometer Simulations, a breakdown of FROSTI and thermal effects and the resulting cavity scan  ligo_update_9_16_(1).pdf
 
Entry  Mon Jul 22 18:19:34 2024, Luke, Update, VAC, Zero length reducer stuck bolts image_2024-07-22_181607501.pngimage_2024-07-22_181632965.png

Today, I borrowed a bolt extractor drill bit from the machine shop to remove some stuck bolts from the zlr. Before starting, I laid down a sheet of aluminum foil on the work table and wiped down all the tools I was going to use. I began by drilling a small pilot hole and then enlarged it with a 5/32 drill bit. However, when I attempted to use the bolt extractor, it didn't grip the bolt effectively. Our bolts were too seized, causing the extractor bit to repeatedly slip instead of gaining traction.

Entry  Wed Oct 23 12:33:54 2024, Luke , Update, , Zernike calculation update 

PowerPoint slides new

PowerPoint slides older

Entry  Wed Mar 1 21:50:46 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart ws2_cart-1.jpegws2_cart-2.jpeg

The Linux workstation (ws2) that used to sit on the blue workbench (now inside the cleanroom) has been mounted on a mobile cart, as pictured below. This is intended to be a clean cart that will be housed inside the cleanroom.

The cart is currently dirty and will need to be throughly wiped down (along with the computer monitor and peripherals) prior to being moved into the cleanroom. Once the cleaned cart has been moved inside, it should never be brought back outside the cleanroom and should never be touched with ungloved hands.

I also upgraded the OS to Debian 11.6 and upgraded the CDS workstation tools.

    Reply  Fri Mar 24 07:14:38 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart 
The ws2 cart has been thoroughly wiped down with IPA wipes and moved inside the cleanroom. I have reconnected it to power and Ethernet (cables bundled and ran to the server rack just outside the cleanroom). It is ready for use.

Quote:

The Linux workstation (ws2) that used to sit on the blue workbench (now inside the cleanroom) has been mounted on a mobile cart, as pictured below. This is intended to be a clean cart that will be housed inside the cleanroom.

The cart is currently dirty and will need to be throughly wiped down (along with the computer monitor and peripherals) prior to being moved into the cleanroom. Once the cleaned cart has been moved inside, it should never be brought back outside the cleanroom and should never be touched with ungloved hands.

I also upgraded the OS to Debian 11.6 and upgraded the CDS workstation tools.

 

Entry  Tue Feb 7 17:44:17 2023, Jon, Infrastructure, Computers, Workstation 1 (ws1) set up ws1.jpg
The Linux workstation (ws1) that used to sit on the old workbench has been mounted on the new electronics bench and is now ready for use again. I upgraded the OS to Debian 11.6 and also upgraded the CDS workstation tools.
Entry  Thu Nov 30 13:50:32 2023, Tyler, Update, Lore, Workbench Assembly Completed IMG_7686.jpg
[Tyler, Luke, Aiden]

The workbenches are now completely assembled and put into their final places. Additionally, the tool chest has been moved.

Entry  Tue Jun 13 10:28:50 2023, Pamella, Update, General, Wiped and bagged the heating and cords. heater_cords_wiped.jpg
[Pamella]
  • Cleaning the heater system parts.
  • 09:13 am: Started wiping the last parts for the heater system (heating and cords).
  • 10:18 am: Finished wiping the parts to the heater system (heating and cords). I wiped, tagged and bagged the heating and cords.
  • Note: In some parts looks like the silicone insulation material is having some sort of residue on the wipe so I wiped very careful this part and just for a few minutes.
  • 10:23 am: I putted all bags inside the cleanroom.
    I attached the photos below.
Entry  Wed Dec 14 17:35:41 2022, Jon, Infrastructure, Computers, Windows Laptop laptop.png

I set up the new Windows 10 laptop (pictured below), which arrived yesterday. This laptop is intended to be used for running lightweight Windows-only programs, such as the Thorlabs beam profiler software or the SRS RGA client. However, none of that software is installed yet.

Configuration details

As usual, the computer is configured with one shared account (username: controls) and the standard password. Note that it is connected to the campus wifi (UCR-SECURE).

If a connection to the lab's local network is required, then the laptop must be connected by an Ethernet cable to the switch in the top of the server rack.

Entry  Tue Jun 6 16:04:46 2023, Aiden, Update, General, Water 
Aiden went and refilled the de-ionized water to continue clean and bake batches.
Entry  Wed Apr 12 10:53:02 2023, Aiden, Summary, General, Valve Cleaning 
Bagged and Tagged the parts from batch 10 and placed them inside the clean room. Then cleaned the last gate valve in liquinox for 20 minutes (10 minutes each side). Then dried the valve, bagged, tagged, and placed it inside the clean room.
Entry  Thu Feb 22 21:48:16 2024, Jon, Update, VAC, Vacuum vent for RGA testing of reflector IMG_0938.pngIMG_0939.png
[Jon, Tyler, Luke, Aiden]

Summary

Following Wednesday's cleanroom cleaning [333], we proceeded to vent the vacuum chamber, remove the heater elements and their mount structure, and install the FROSTI reflectors. The reflectors are the final components to undergo RGA testing before the FROSTI prototype can be assembled. After installing the reflectors, we pumped the chamber back down and initiated a 48-hour 125 C bake.

Vacuum Vent

At ~1:00 pm, we shut off power to all eight of the FROSTI heater elements. Prior to shutoff, all were operating in vacuum at roughly 300 C. We then waited approximately 30 minutes for the elements' temperatures to fall below 50 C.

At this point, we isolated the RGA volume from the main volume by closing both gate valves, leaving the RGA volume to continue to be pumped through the bypass line. We then backfilled the main volume via the needle valve connected to one of the 2.75" ports. Once the pressures had equalized, we removed the chamber lid via our usual procedure (requiring only a small amount of flathead-screwdriver prying) and extracted the heater element assembly.

Reflector Assembly

We then removed the FROSTI reflectors from their protective packaging (for the very first time) on the cleanroom tabletop. We tested the fit of the Macor and stainless steel hardware in the reflectors' tapped holes. The Macor standoffs and bolts appear to fit perfectly. However, the 1/4-20 tapped holes for joining the two reflector halves are too shallow by ~1/4". As a temporary fix, we used some on-hand stainless steel washers (which had already been cleaned and baked) to securely fasten the two halves together. In the final assembly we will replace these with slightly shorter 1/4-20 vented bolts.

Pumpdown and Bake

The two fastened reflector halves were placed inside the chamber, sitting on top of the two mounting legs (see attached photos). We then reinstalled the lid. In order to rough the main volume, we isolated the RGA volume from the pumpline (by closing the bypass line valve), shut down the pumps, and then backfilled the pumpline via the manual vent valve on the turbo pump.

Once the pressures had equalized, we opened the 6" gate valve separating the pumpline from the main volume and powered on the roughing pump. Once the main volume pressure fell below 0.5 Torr, we powered on the turbo pump as well. The main volume pressure reached 5e-6 Torr within ~30 minutes, consistent with previous experience, and was continuing to slowly fall.

Lastly, we initiated a 125 C bake-out of the entire system following our usual procedure. We plan to run this bake for 48 hours (i.e., through the end of the day Friday).

Entry  Wed Oct 11 20:47:11 2023, Jon, Update, VAC, Vacuum upgrade begins IMG_0619.pngIMG_0621.pngIMG_0618.png

[Jon, Tyler, Aiden, Peter]

Upgrade of the UHV system to a larger turbo pump began today. After obtaining a final RGA scan in the old configuration (Aiden to post), we vented all three volumes and proceeded to disassemble the 4.5"-diameter pump line. We completed installation of the new 6"-diameter pump line to the point where the new turbo pump will attach. This includes a 6" manual gate valve, 6"/2.75" reducing cross, and 6"/8" conical reducing nipple, as pictured below. Strain relief was also installed due to the longer length and greater weight of the new fittings.

Tomorrow we will continue with attaching the Varian TV 551 pump and perform a pump-down test. If this pump is confirmed to be operable, then we will relocate the entire system ~18" closer to the middle of the table and permanentize the setup.

    Reply  Fri Apr 21 00:06:43 2023, Jon, Update, VAC, Vacuum prep and installation - parts have arrived SS_parts.png

The two parts needed to complete the vacuum assembly (ELOG 70) have arrived.

  • (10) 5/16"-24 x 1 3/4" threaded rods - for attaching the turbo pump reducing nipple to the CF 4.5" gate valve;
  • (1) 45 degree CF 2.75" elbow for attaching the calibrated Ar/He leak to the chamber.

I left them laying on top of the ultrasonic washer. They both need to cleaned and baked following the standard procedure for stainless steel, as the threaded rods are visibly dirty.