  53   Wed Mar 22 12:16:20 2023 JonInfrastructureCleanroomExperimenting with HEPA fan speedsJon, Cao
In effort to try to reduce the noise
level inside the cleanroom, we have dialed
  
  56   Fri Mar 24 07:14:38 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe ws2 cart has been thoroughly wiped down
with IPA wipes and moved inside the cleanroom.
I have reconnected it to power and Ethernet
  
  67   Tue Apr 11 13:15:40 2023 CaoInfrastructureClean & BakeNitrogen gas tank replacedThe nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).

The new tank has been
  
  94   Tue May 9 15:49:20 2023 JonInfrastructureVACPermanent cable routingToday I brought in a fresh supply of zip
ties (we now have 1500 in the tool chest)
and used them to permanentize the cable routing
  
  95   Tue May 9 20:55:12 2023 JonInfrastructureVACCalibrated Ar leak rateFor future reference, the calibrated Argon
source has a leak rate of 7.55E-8
atm cc/s, or equivalently 
 VTI-Calibrated-Ar-Leak.jpeg 
  98   Sun May 14 15:50:48 2023 CaoInfrastructureComputersHigh resolution display of logrus machine[Cao]

 
The display resolution of the
logrus has been 1064x768 and has been the
only option, which is not great. While remote
  
  122   Tue Jun 13 21:08:46 2023 PamellaInfrastructureVACHeater system - Installation[Pamella, Cao and Jon]


 Heating system
installation 

 Today we
started installing the equipments for the
 IMG_7563.jpegIMG_7561.jpeg 
  129   Tue Jun 20 22:14:24 2023 Pamella, CaoInfrastructureVACShort term testing of vacuum heater controller units[Pamella, Cao]

 
 Fuse replacement


 Replace blown 10A fuse
in ucontroller outside cleanroom 
  
  130   Wed Jun 21 20:25:05 2023 CaoInfrastructureVACVacuum chamber bake attempt 1 TL;DR: 
We are not yet able to
bake the chamber at 150 deg C due to some
current limit, most likely caused power supply
 6x 
  136   Tue Jun 27 21:47:56 2023 JonInfrastructureVACVacuum chamber bake attempt 1The electrical overload problem encountered
in ELOG 130
has been resolved. The two heater controllers,
 IMG_0256.pngIMG_0257.pngIMG_0254.png 
  137   Wed Jun 28 15:58:56 2023 Shane, CaoInfrastructureVACPower trip problem remains, source of smoke is insulation[Shane, Cao] 


With the new change
in wiring configuration described in elog
136,
 Pumpline_afterRemoveInsul.jpgRGAline_afterRemoeInsul.jpgMeltedInsulation1.jpgMeltedInsulation1.jpgMeltedInsulation2.jpg 
  138   Thu Jun 29 18:27:26 2023 Jon, CaoInfrastructureVACVacuum bake attempt 3: success![Jon, Cao]


 Summary : We resolved
problems with heaters tripping power and
were able to proceed with chamber baking
 NewInsulation.pngBypassLineInsulation.jpg 
  141   Mon Jul 3 14:32:24 2023 CaoInfrastructureVACCooling down vacuum chamber[Cao]

 
After leaving the the chamber
to bake at 120 deg C from Thursday 3:41 pm.
Today I started to cool the chamber down
  
  142   Mon Jul 3 16:26:21 2023 CaoInfrastructureDAQAccess and control Red Pitaya remotely and run it on local machine[Cao]


To access and control the Red
Pitaya using Python locally on a machine
within the local network, one should follow
  
  145   Wed Jul 5 15:46:47 2023 Aiden, CaoInfrastructureVACVacuum Chamber Baking Update
Cao and Aiden put the RGA back on to
the chamber and measured the outgassing rate
after the chamber has cooled down from its
 bake1_230705.png 
  198   Wed Aug 9 11:32:56 2023 JonInfrastructureGeneralNew power cablesI delivered new NEMA 5-15 (120V / 15 A)
power cables to the lab for the following
items:
 IMG_0299.jpg 
  294   Sun Dec 17 21:04:15 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129[Jon, Tyler, Aiden, Luke]
On Friday we completed assembly of
the new stainless steel-topped benches in
 IMG_0781.pngIMG_0782.png 
  297   Wed Dec 20 10:33:34 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129Update: I
have completed permanent routing of the electrical
cables. I also ran the ultrasonic washer's
  
  303   Mon Jan 15 22:29:34 2024 JonInfrastructureGeneralCabinet installation & lab clean-up completed[Jon, Tyler, Aiden, Shane, Pooyan, Michael,
Cynthia, Luke]
On Wednesday, we completed long list
 1129.png1119.png 
  330   Tue Feb 20 08:01:30 2024 JonInfrastructureGeneralPower and network equipment installed in 1129 rack[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On
Thursday we installed the power conditioning/distribution
equipment and networking equipment in the
 IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg 
  339   Sat Feb 24 08:53:38 2024 JonInfrastructureComputersMatlab upgraded to 2023b on ChimayI upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me
  
  377   Mon Jun 17 11:47:46 2024 LiuInfrastructureGeneralTemporary cooling units for the labsBelow are the temporary cooling units installed
last week in labs 1119 and 1129. They are
the temp. replacement for the building AC
 1119.jpg1129.jpg 
  379   Thu Jun 20 18:01:11 2024 JonInfrastructureComputersNew workstation ws3 in 1129I have repurposed a spare Intel NUC to serve
as the first of two planned workstations
in 1129. Today I set it up with a fresh installation
  
  382   Mon Jun 24 21:38:25 2024 PooyanInfrastructureComputersComputer server changes in 1119 and 1129[Jon, Pooyan, Tyler]
 
A few computer machine changes have
 IMG_6889.jpgIMG_6890.jpg 
  385   Wed Jun 26 15:33:41 2024 JonInfrastructureComputersNew workstation ws3 in 1129
Set-up of the first CDS workstation for
1129, ws3, is complete and the machine is
ready for use. The login credentials are
 IMG_1368.jpg 
  402   Thu Jul 11 21:01:37 2024 JonInfrastructureGeneralCable tray installed in 1129Today I installed a 10' cable tray in 1129,
for permanently routing Ethernet lines to
the workstations. It is securely bolted to
 IMG_1395.pngIMG_1396.png 
  412   Fri Jul 26 17:25:42 2024 JonInfrastructureComputersNew workstation ws4 installed in 1129Today I installed the second desktop workstation
in 1129. The new machine is an Intel NUC13ANHi5,
with a 12-Core Intel i5-1340P CPU, 32GB DDR4
 ws4.jpg 
  418   Tue Jul 30 07:42:47 2024 JonInfrastructureGeneralCable tray installed in 1119Yesterday I installed another 5' cable tray
in 1119, for permanently routing Ethernet
lines to the L-bench. It is securely bolted
 cable_tray_1119.jpg 
  437   Mon Sep 9 14:27:36 2024 PooyanInfrastructureComputersChimay backup attemptOne ongoing work is to make all lab machines
automatically backed-up on Scribe on a daily
basis. The updates should be boatable and
  
  1   Sun Apr 10 15:39:49 2022 Rutuja GuravHowToComputer Scripts/ProgramsHowTo: Renew the Let's Encrypt SSL certificate using certbotPort 80 is kept closed by default. This
might be causing the certbot auto-renewal
cronjob to fail. Therefore we must renew
  
  2   Thu Jun 2 16:14:58 2022 JonHowToGeneralCustom conda environment on JupyterHubCross-linking instructions: How
to run a Jupyter notebook in your custom
Conda environment
  
  292   Fri Dec 15 14:03:02 2023 AidenHowToVACVacuum Chamber Opening[Aiden]

1. Turn off the RGA filament
and disconnect it.

2. Record the pressure
and then close the angle valve and gate valve
  
  14   Wed Dec 14 18:34:33 2022 JonConfigurationElectronicsAdapter for 532 nm laser power supplyI installed an EU-to-US plug adapter for the
532nm laser's 9V power supply. I then re-measured
the laser's power with the correct supply
 laser_power.png 
  271   Mon Nov 20 10:10:50 2023 TylerConfigurationElectronicsRTD Logic/Schematic Diagrams
Below are a basic diagram of what the
RTD measurement circuit logically looks like
and an example schematic of the actual wiring.
 FIN_RTD_circuit.pngSample_Circuit_Schematic.png 
  298   Fri Dec 29 16:02:27 2023 JonConfigurationElectronicsRTD Readout ChassisThe custom front and rear panels for the
RTD readout chassis arrived last Friday.
I installed them in the chassis frame to
 front.jpegrear.jpegoverhead.jpeg 
  300   Tue Jan 9 12:08:59 2024 TylerConfigurationElectronicsRTD Readout Chassis Update
Below is the current state of the RTD
readout chassis wiring. Initial continuity
tests seem good, will run through one more
 IMG_8105.jpg 
  305   Tue Jan 16 12:20:21 2024 TylerConfigurationElectronicsRTD Readout Chassis Update 2
I performed another continuity test on
the RTD chassis wiring, and everything seems
to be set up correctly. The chassis should
 IMG_8146.jpgIMG_8147.jpg 
  323   Tue Feb 13 11:54:45 2024 TylerConfigurationFLIRIn-Air Optical Test Configuration
Below is the proposed schematic for FROSTI
optical testing, chosen so enough space is
allotted for prototype assembly.
 In-air_optical_test_sketch.png 
  451   Wed Oct 2 10:31:46 2024 Xuesi MaConfiguration Group Meeting Slides 10/2/2024
Group Meeting slides for Non-deterministic
Heater Response.
 Group_Meeting_10_2.pdf 
  517   Tue Feb 18 11:19:13 2025 Luke ConfigurationVACRepositioning of the lid's temperature probeBefore the recent bake I slightly repositioned
the temperature probe on the lid from beside
the heater tape to under the heater tape.
  