  36   Tue Feb 28 19:31:05 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook M2 measurements today. Configuration:
Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm)
at 200mm, camera at 350mm. The laser beam
 X_width_and_Y_width.png 
  35   Tue Feb 28 13:53:17 2023 PamellaUpdateGeneralVacuum chamber cleaning Pamella, Dr. Richardson and Dr.Cao finished
checking and cleaning the interior of the
chamber, chamber lid, and exterior of the
 EE5E0296-D362-4EA6-B482-85A629D93B46.jpeg4C0AA805-667E-45AD-8704-03389BD63489.jpeg51CE3D1E-F48E-4F57-8450-8F58C27154BB.jpeg58ADE656-52AD-4F0E-88BA-B993F977A519.jpeg 
  34   Mon Feb 27 17:09:04 2023 Pamella UpdateGeneralVacuum Chamber CleaningPamella and Julian finished cleaning the interior
of the chamber, chamber lid, and the table.
We found some black residue on the side of
 Side_of_Table.jpegWipes_from_table.jpeg 
  33   Thu Feb 23 21:12:33 2023 JulianUpdateGeneralVacuum Chamber CleaningToday I was able to come in and wipe down
both sides of the vacuum chamber lid using
the regular alcohol wipes and also wipes
 ChamberLid_inside.jpgChamberLid_outside.jpgVacuumChamber_inside.jpg 
  32   Thu Feb 23 13:32:55 2023 ShaneUpdateGeneralClean room floor particle countsHere are the counts from the clean room floor
today. The counts should be dated- the ones
from today (2/23/23) are the last 8 in the
 2.23.2023.pdf 
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4148.jpgIMG_4147.jpg 
  30   Fri Feb 17 19:12:39 2023 AidenUpdateGeneralClean and Bake batch 3Bagged and Tagged batch 2 parts by placing
no more than two parts per ESD bag then taped
them with kapton tape and tagged them with
 IMG_4126.jpgIMG_4125.jpg 
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC,
  
  28   Sat Feb 11 17:09:29 2023 ShaneUpdateGeneralclean room particle counts 2/10/23Took a round of clean room counts after the
latest clean of vacuum chamber on Feb 10.
Used 60 second sample time, 5 samples for
 occupied2.10.23.pdfunoccupied2.10.23.pdfparticlecounts2.10.23.PDF 
  27   Sat Feb 11 00:17:27 2023 JulianUpdateGeneralVacuum Chamber CleaningToday I finished wiping down the rest of the
vacuum chamber, specifically focusing on
the connecting ports and outside surface
 20230210_181404.jpg20230210_181424.jpg20230210_181541.jpg20230210_181606.jpg 
  26   Fri Feb 10 16:34:45 2023 Huy Tuong CaoInfrastructureClean & BakeNitrogen gas tank ready to useCao,


Today I fixed the final bit related
to the nitrogen gas tank, which is to apply
sealing tape to M-NPT connector of the hose
 AirGunSealed.jpg 
  25   Fri Feb 10 15:15:30 2023 AidenUpdateGeneralBagging First BatchAiden Bagged and Tagged the first batch of
stainless steel parts shown on the google
spread sheet. 
1. Removed two parts from
  
  24   Tue Feb 7 17:44:17 2023 JonInfrastructureComputersWorkstation 1 (ws1) set upThe Linux workstation (ws1) that used to sit
on the old workbench has been mounted on
the new electronics bench and is now ready
 ws1.jpg 
  23   Tue Feb 7 17:27:30 2023 AidenPhysicsELOGClean and Bake Batch #1Cleaned SS parts with liquinox for 20 min.
Then put in oven for 5 steps;
1. Ramp, 100
degC, 15 min
2. Const, 100 degC, 30 min
3.
  
  22   Mon Feb 6 20:02:32 2023 JulianUpdateGeneralCleanroom UpdateI wiped down the main table (including frame,
legs, and transparent shelf) and workbench
using alcohol wipes. Once I cleaned all of
  
  21   Sat Feb 4 17:01:03 2023 PeterUpdateVLC ElectronicsLaser DataPeter and Ryan took laser beam data. Configuration:
100mm focal length lens is ~100mm from lens.
150mm focal length lens is ~200mm from first
 OmegaX_M2_Fit_3.pngOmegaY_M2_Fit_3.png 
  19   Fri Feb 3 13:04:04 2023 shaneSummaryGeneralclean room particle counts 1/25/23Clean room count graphs for each zone (as
of January 25, 2023) attached
 cleanroomcountsJan25.pdf 
  18   Fri Jan 27 18:44:31 2023 Julian UpdateGeneralVacuum Chanmber CleaningI used the IPA wipes to wipe down the inside
of the chamber the best I could. I cleaned
the main chamber but not any of the connecting
  
  17   Thu Jan 26 18:58:25 2023 AidenUpdateGeneralOven HeatingAiden cleaned the oven with methanol again
and set the oven to 260 degC for 12 hours.
  
  16   Mon Jan 23 17:26:15 2023 Peter CarneyUpdateGeneralOven cleaningAiden and Cao 
Turned on the oven to 120
deg C for 12 hours. After 12 hours, put it
at 200 deg C for 48 hours. 
  
  15   Wed Jan 18 22:06:05 2023 JulianUpdateELOGCleanroom UpdateI wiped down all the inner walls of the cleanroom
using alcohol wipes, as per Cao's instruction.
  
  14   Wed Dec 14 18:34:33 2022 JonConfigurationElectronicsAdapter for 532 nm laser power supplyI installed an EU-to-US plug adapter for the
532nm laser's 9V power supply. I then re-measured
the laser's power with the correct supply
 laser_power.png 
  13   Wed Dec 14 17:35:41 2022 JonInfrastructureComputersWindows LaptopI set up the new Windows 10 laptop (pictured
below), which arrived yesterday. This laptop
is intended to be used for running lightweight
 laptop.png 
  12   Mon Nov 28 18:10:23 2022 shaneUpdateELOGParticle counts in the clean roomParticle count stats for the clean room Nov
28, 2022: 
Took 10 sample runs in each of
5 regions in the clean room (5 runs per region
 clean_room_particle_counts_11_28_-_Sheet1.pdf 
  11   Mon Oct 3 17:21:39 2022 CaoUpdateTCSInspection of macor partsThe macor parts arrived and inspected today.
These include:


 Macor spacer
(drawing:  LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf
 7x 
  10   Wed Aug 17 16:04:30 2022 Phoebe ZylaSummaryLoreTesting the Cartridge Heater and Collecting FLIR DataWe have tested the heater to find emissivity,
mounted the heater system to the optical
table, and have taken irradiance maps of
 Screenshot_(74).pngScreenshot_(75).pngScreenshot_from_2022-08-15_11-24-40.pngAcquisitionImage(Aug-15-2022_14_16).jpg 
  9   Tue Jul 26 14:10:35 2022 CassidyUpdateCamerasOptical Post Replacement and RealignmentToday I replaced the 3" optical post that
the camera rests on with a 2" optical post
in order for the screen to correctly fill
 YAxisAlignment.pngXRotZAlignment.pngNewOpticalPost.png 
  8   Fri Jul 22 13:20:28 2022 PhoebeUpdate ComsolI will be using comsol until 1:30 pm today.
I will be updating the model for the heater
mount to be thicker in certain areas, so
  
  7   Mon Jul 11 14:29:45 2022 JonOmnistructureGeneralHEPA filter installedToday I unpacked and installed the new HEPA
filter for the lab. It is an Omni CleanAir
OCA1210 capable of 1200 CFM. This flow rate
 IMG_1530.png 
  6   Tue Jun 21 18:31:49 2022 Cassidy and PhoebeUpdateCamerasIR Absorbing Screen and FLIR Camera SetupToday we set up the IR absorbing screen and
the camera on the optical table, as well
as tested that the camera was functioning
 IMG_6751.pngIMG_1146.pngIMG_6756.png 
  5   Mon Jun 6 17:11:48 2022 JonUpdateCamerasFLIR Camera SetupToday I tested the Spinnaker/PySpin software
installations (detailed in ELOG
#4) with the FLIR camera connected to
 IMG_1480.pngIMG_1481.png 
  4   Fri Jun 3 13:03:33 2022 JonUpdateCamerasFLIR Camera SetupSummary
I have installed the
requisite software on chimay for interfacing
the FLIR A70 camera in Python. There are
  
  3   Thu Jun 2 21:55:02 2022 JonUpdateCamerasFLIR Camera SetupThe new FLIR A70 infrared camera has arrived.
Tyler and I unpacked it in the lab yesterday.
In less than an hour, we succeeded in powering
 IMG_1473.pngIMG_1474.png 
  2   Thu Jun 2 16:14:58 2022 JonHowToGeneralCustom conda environment on JupyterHubCross-linking instructions: How
to run a Jupyter notebook in your custom
Conda environment
  
  1   Sun Apr 10 15:39:49 2022 Rutuja GuravHowToComputer Scripts/ProgramsHowTo: Renew the Let's Encrypt SSL certificate using certbotPort 80 is kept closed by default. This
might be causing the certbot auto-renewal
cronjob to fail. Therefore we must renew
  