    Reply  Tue Jul 16 18:43:07 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation Follow-up_ADC-DAC_Loopback_Testing.xlsx

UPDATE: 
Follow up ADC-DAC loopback testing now complete, matching all the ADC channels to a single DAC channel, and then matching all the DAC channels
to a single ADC channel (see attached xlsx file or access directly here).
Also note c1msc model file has been updated to include the second set of 16 ADC channels. The newly added channels also have their own filter modules,
Entry  Fri Aug 2 13:50:22 2024, Shane, Update, CDS, Serial Comm. Test (Agilent Turbo Pump) pinouts.jpeg
Did a brief communication test with the agilent turbo pump today, to see if we could get serial communications up and running for it. Used a simplified
python script with sockets package to establish a connection and send a simple command to query the pump's operational status. The connection was successful,
and had no issues establishing. The command also sent successfully, and received a response. The response didn't make sense, though, as all the possible
Entry  Tue Sep 3 18:24:17 2024, Tyler, Update, CDS, Cymac Timing Chassis Issue 
[Tyler, Jon]


The timing chassis used for the cymac has been shut off due to an unknown issue causing its supplied current to fluctuate. All real-time
models will be suspended until a solution is found.
Entry  Tue Oct 1 19:41:23 2024, Shane, Update, CDS, CyMAC Timing Chassis Issue IMG_5917.jpegIMG_5803.jpegIMG_5804.jpeg
[Shane, Luis]


Summary of the issue we've been having with the timing chassis: when we connect only the Valon 5015 to power, the timing signal comes
out of it sinusoidal as expected and the status lights are steady and all looks good. As soon as we connect the 3010 to power, the signal (both coming
out of the 5015 and coming out of the 3010) go flat and the status lights of the 5015 start to flicker. 

We think what may be going on is that the 5015
Entry  Thu Oct 17 13:24:23 2024, Shane, Update, CDS, Timing Chassis issue identified IMG_6462.jpegIMG_6464.jpeg




[Ma, Luis, Shane]

Working theory for the timing chassis issues had been that the 1A breaker was tripping and
causing the failure of the Valon 5015 and 3010 to output the timing signal correctly. We just tried bypassing the breaker, running 6 V on the benchtop
power supply (set the current limit to 1.5A), with the 5010 generating the sine wave to pass to the 3010. All worked correctly, and there were no issues.
Entry  Fri Oct 25 10:56:30 2024, Shane, Update, CDS, Timing Chassis fixed and reinstalled successful_timing.jpeg



[Ma, Shane]

We replaced the 1A breaker in the timing chassis today with a 4A one, and tested that all is working
well. The chassis successfully outputted the correct signal (image attached). The real time models have also been restarted and the CyMAC diagnostics screen
is showing all green flags. Timing chassis has been closed up and reinstalled in the server rack. 
Entry  Thu Nov 14 11:58:05 2024, Shane, Update, CDS, Turbo pump connection troubleshooting 
Attempted connection to the TV551 turbo pump through Varian/Agilent's software on spica. Successful connection established, and we are able to read out
al the readings associated with the pump (status, temperature, etc) through the software, which is actually pretty extensive and well organized. Was able
to stop and restart the pump with no issues. Serial communications seem to be working fine, and the current serial settings (baud rate 9600, serial type
Entry  Fri Jul 22 13:20:28 2022, Phoebe, Update, , Comsol 
I will be using comsol until 1:30 pm today. I will be updating the model for the heater mount to be thicker in certain areas, so that it can feasibly be
3D printed. Specifically, the radius of the center cartridge mount has been increased to add thickness to the pipe and the arms of the bridge. This will
allow us to print with a much smaller chance for error, as the printer can print objects with a minimum length of 1 mm. 
Entry  Tue Feb 28 19:33:51 2023, Peter, Update, , 532 M2 Measurements 
Y axis of plot in units of micrometers. X axis in units of millimeters. 
Entry  Wed Mar 8 18:35:52 2023, Pamella, Update, , Lab cleaning  
Today Pamella finished cleaning of the cleanroom, starting with the HEPA vacuuming,  mopping and clearing all floor with IPA wipes. 
Also Pamella and Julian
finished cleaning of lab floor, starting with the HEPA vacuuming and mopping.
Shane and Pamella wiped down every surfaces of the laser table, computer
table and the table with the vacuum pieces inside the cleanroom.
Shane, Peter, Tayler, Pamella and Julian then wiped down every surface of the laser table
Entry  Fri May 31 19:37:47 2024, Luke, Update, , Vacuum chamber Disassembly  IMG_1681.jpgIMG_1680.jpgIMG_1680.jpgIMG_1681.jpg
[Luke, Aiden, Jon, Michel, Tyler]

Work done:
On Tuesday (5/28) we removed the RGA line with minimal difficulty. On Wednesday (5/29) we removed the turbo
pump, which had a few bolts that we needed to cut. We borrowed a dremel with ceramic blades from the machine shop to help remove some of the bolts. On
Thursday we moved the vacuum chamber onto the floor to check and resecure the heating band on the bottom of the vacuum chamber. We then relocated the posts
Entry  Wed Jun 19 18:45:14 2024, Luke, Update, , Vacuum chamber reassembly  image_2024-06-19_182556383.pngimage_2024-06-19_182631737.pngIMG_1710.jpg
[Luke, Aiden, Mohak , Tyler]

On Tuesday we had the silver screws for the spherical cube shortened by a quarter of an inch so that they would fit into
the gate valve. We then attached the spherical cube to the vacuum chamber. 

On Wednesday we finished assembling the RGA line and the main turbo pump.
Entry  Mon Aug 12 16:35:30 2024, Luke , Update, , Ringheater modeling Update HR_surface_deformation.pngIrradiation_pattern_input.pngHR_surface_deformation_other.png
 
Entry  Wed Oct 2 10:31:46 2024, Xuesi Ma, Configuration, , Group Meeting Slides 10/2/2024 Group_Meeting_10_2.pdf

Group Meeting slides for Non-deterministic Heater Response.
Entry  Wed Oct 2 12:05:42 2024, Luke , Update, , Ringheater modeling Update 
Power point slides
Entry  Wed Oct 2 14:49:59 2024, Liu, Update, , FROSTI ETM actuation 
Proposed FROSTI ETM actuation on the HOM7 resonance.  

Animation
Entry  Wed Oct 16 14:13:31 2024, Liu, Update, , FROSTI with non uniform absorption scattering sources 
Slides
Entry  Wed Oct 23 12:33:54 2024, Luke , Update, , Zernike calculation update 
PowerPoint slides new

PowerPoint slides older