  Richardson Lab Experimental Log, Page 1 of 11  Not logged in ELOG logo
ID Date Authordown Type Category Subject Text Attachments
  12   Mon Nov 28 18:10:23 2022 shaneUpdateELOGParticle counts in the clean roomParticle count stats for the clean room Nov
28, 2022: 
Took 10 sample runs in each of
5 regions in the clean room (5 runs per region
 clean_room_particle_counts_11_28_-_Sheet1.pdf 
  19   Fri Feb 3 13:04:04 2023 shaneSummaryGeneralclean room particle counts 1/25/23Clean room count graphs for each zone (as
of January 25, 2023) attached
 cleanroomcountsJan25.pdf 
  71   Wed Apr 12 16:17:50 2023 shaneUpdateGeneralParticle Counter movedWith the added height of the new docking station,
the particle counter no longer fits under
the Windows monitor in the electronics rack
 IMG_6693.HEIC 
  178   Fri Jul 28 13:39:39 2023 shaneUpdateCleanroomfull 5 zone cleanroom particle countHere's the 5 zone cleanroom measurement from
today. 
 download.png 
  193   Mon Aug 7 13:58:46 2023 shaneUpdateCDSinternal power supply cables done for AI chassisFinished assembling and installing the aLigo
chassis internal power supply cables in the
anti-imaging chassis today. Tested for continuity
 IMG_8674.jpeg 
  260   Thu Nov 9 19:06:46 2023 shaneUpdateCleanroom5 zone cleanroom measurementHere's today's five zone measurement, taken
~5 hours after the cleaning. Zone 5 (closest
to fire cabinet and back wall) is a bit over
 23.jpeg 
  262   Fri Nov 10 14:16:04 2023 shaneUpdateCleanroomnew cleanroom zone diagramsince the vac system has been moved and made
permanent, here's a new diagram of the cleanroom
zones. The zones themselves haven't moved,
 cleanroom_zones_nov2023.jpg 
  309   Thu Jan 18 18:06:49 2024 shaneUpdateCleanroomcleanroom 5 zone particle count measurementHere's today's full five zone measurement
of the cleanroom
 24.png 
  315   Fri Feb 2 19:18:24 2024 shaneUpdateCleanroomcleanroom cleaning and particle count


[Aiden, Shane,
Luis, Luke]


cleaning cleanroom
and particle count
  
  318   Wed Feb 7 12:43:22 2024 shaneUpdateCleanroomcleanroom particle counts (full 5 zone measurement)Here's today's full 5 zone measurement of
the cleanroom. Everything is back under the
requirement. 
 24.png 
  365   Tue May 7 20:34:31 2024 shaneUpdateCDSfrosti MEDM screen update[Luis, Shane]
Here is the updated MEDM screen,
with new orientation and updated labeling
to reflect the actual positions of the heater
 FROSTIMEDMMay7.2024.png 
  505   Tue Jan 28 13:30:46 2025 shaneUpdateCDSSerial comms testing updateAttempted to communicate with the smaller
vac pump (TwissTor 74) via Agilent software
today. Was able to communicate with the pump
  
  451   Wed Oct 2 10:31:46 2024 Xuesi MaConfiguration Group Meeting Slides 10/2/2024
Group Meeting slides for Non-deterministic
Heater Response.
 Group_Meeting_10_2.pdf 
  458   Tue Oct 15 15:27:38 2024 Xuesi MaUpdateELOGTiming Chassis Update
I conducted separate tests on the '5015'
and '3010a'. When powered individually, the
'5015' outputs a signal at 33.55 MHz with
 12x 
  503   Mon Jan 27 11:29:38 2025 Xuesi MaUpdate Heater Element Test[Ma, Cece, Luke, Mary, Shane]

On Friday (Jan 24), we installed
the heater elements on the stand. The heater
 20250124_165434.png20250124_165342.png 
  504   Mon Jan 27 23:35:28 2025 Xuesi MaUpdate  [Ma]
Installed all the pins to the peek
DB 25 connectors
 20250127_142647.jpg20250127_153454.jpg20250127_154516.jpg 
  506   Fri Jan 31 15:03:09 2025 Xuesi MaUpdate Heater Element Circuit Check
        table {
            width:
100%;
            border-collapse: collapse;
/* Merges borders into a single line */
  
  508   Mon Feb 3 13:17:21 2025 Xuesi MaUpdate  [Ma]
changed all zip ties to peek zip
ties, and grouped wires together. The setup
 20250203_123153.jpg20250203_123213.jpg 
  514   Tue Feb 18 10:01:07 2025 Xuesi MaUpdate  [Ma, Pooyan, Tyler]
On Friday, we connected the vacuum
chamber with the Cymac.
 IMG_7916.jpegIMG_7915.jpegIMG_7917.jpeg 
  515   Tue Feb 18 10:02:16 2025 Xuesi MaUpdate Group Meeting Slides 2/18/2025https://docs.google.com/presentation/d/1WiV2VqS0BzXNCK6VYYQ-Ty8xlHnzXatQaFbMf1-0rsY/edit?usp=sharing   
  525   Tue Feb 25 10:02:32 2025 Xuesi MaUpdate  1424039912.625576 2025/02/19 22:38:14 UTC Time
start
24V 2.8A right after start all 8
 resistance_vs_time_all_channels_all_time.pdftemperature_vs_time_all_channels_all_time.pdfresistance_vs_time_rise_time.pdfresistance_vs_time_fall_time.pdf 
  528   Tue Mar 4 03:05:42 2025 Xuesi MaUpdateELOGLOG1424564097.243212 2025/02/26 00:14:39 UTC Time
start
12V 2A right after start all 8 elements
  
  529   Tue Mar 4 03:33:18 2025 Xuesi MaUpdate UpdateSpikes Appear Again, need to address it
systematically.
Power on and off before reaching
 6x 
  539   Tue Mar 11 10:43:57 2025 Xuesi MaUpdate  Continue investigation in the spikes
Pulsed ADC with a function generator
and find no spikes. Rules out ADC for causing
 20250310_171936.jpg 
  544   Mon Mar 31 15:41:56 2025 Xuesi MaUpdate  The result from AI Chassis bypass test
showed that the AI Chassis may be the problem.
There are no spikes from DAC's direct output.
  
  389   Fri Jun 28 10:43:13 2024 XuejunUpdateCleanroomFrosti[Xuejun, Tyler]


We moved Frosti into
the cleanroom and debugged it to make sure
everything was working. One of the DB25 pins
 frosti.jpgchassis.jpg 
  396   Mon Jul 8 10:39:14 2024 XuejunUpdateFLIRAverage Temperature Profile After taking data for each of the individual
heater elements, I imported them into python
and overlayed them to produce an average
 Average-Temperature-Profile.pdf 
  421   Tue Aug 6 13:07:07 2024 XuejunUpdateInterferometer Simulations [Xuejun]

 The width and location of
the measured in-air change in temperature
profile has been determined to be 0.045m
 Thermal_model_image.pnggenerated_irradiance_profile.png 
  235   Mon Oct 9 11:29:37 2023 TylerUpdateElectronicsPSD/CSD Plot UpdatesContinuing from Sophia's SURF Project this
summer: Plotting the Power-Spectral Densities
(PSDs) and Cross-Spectral Densities of two
 Screenshot_2023-10-09_at_11.20.25_AM.pngwelch_csd-2.png 
  243   Mon Oct 23 11:28:05 2023 TylerUpdateCamerasFLIR Camera Code UpdatesThe past week I've been spending time going
through the FLIR code on gitlab. Initially,
it had appeared that our measurements with
 Screenshot_2023-10-23_at_11.06.04_AM.png 
  249   Mon Oct 30 11:03:56 2023 TylerUpdateScripts/Programs 
FLIR: After some adjustments, the plot
generated from the FLIR measurements look
much more symmetric (see attachment). There
 Screenshot_2023-10-23_at_12.39.05_PM.png 
  255   Mon Nov 6 11:29:24 2023 TylerUpdateElectronicsPreliminary RTD Calculations, RP Software Update
Preliminary RTD calculations are shown
below, given an input of 10 V and desiring
a few mA of current. It looks like R_ref
 cvt.pngVvC.pngIMG_7471.jpg 
  264   Mon Nov 13 11:07:50 2023 TylerUpdateVACRTD Analysis
After initial analysis from last week
on a single RTD, I then extended to looking
at all 8 in series with R_ref (set to 1 kOhm).
 Screenshot_2023-11-13_at_11.05.45_AM.pngScreenshot_2023-11-13_at_11.06.04_AM.png 
  271   Mon Nov 20 10:10:50 2023 TylerConfigurationElectronicsRTD Logic/Schematic Diagrams
Below are a basic diagram of what the
RTD measurement circuit logically looks like
and an example schematic of the actual wiring.
 FIN_RTD_circuit.pngSample_Circuit_Schematic.png 
  274   Tue Nov 21 14:47:24 2023 TylerUpdateLore1129 Workbench Assembly Update 1
[Tyler, Shane, Mohak, Cynthia, Luke,
Michael, Luis]


Started assembly of the workbench
 IMG_7569.jpgIMG_7568.jpg 
  278   Mon Nov 27 14:22:30 2023 TylerUpdateLore1129 Assembly Update[Tyler, Michael, Luke, Cynthia]


The
tabletops have been attached to the workbench
frames. Unfortunately, one of the tabletops
 IMG_7669.jpgIMG_7668.jpg 
  281   Thu Nov 30 13:50:32 2023 TylerUpdateLoreWorkbench Assembly Completed[Tyler, Luke, Aiden]



The workbenches
are now completely assembled and put into
their final places. Additionally, the tool
 IMG_7686.jpg 
  300   Tue Jan 9 12:08:59 2024 TylerConfigurationElectronicsRTD Readout Chassis Update
Below is the current state of the RTD
readout chassis wiring. Initial continuity
tests seem good, will run through one more
 IMG_8105.jpg 
  305   Tue Jan 16 12:20:21 2024 TylerConfigurationElectronicsRTD Readout Chassis Update 2
I performed another continuity test on
the RTD chassis wiring, and everything seems
to be set up correctly. The chassis should
 IMG_8146.jpgIMG_8147.jpg 
  310   Tue Jan 23 12:17:41 2024 TylerUpdateElectronicsRTD Chassis
After updating the wiring in the RTD
Chassis, a signal is now seen at each ADC
input. However, there seems to be a discrepancy
 rtd_updated_circuitry.jpg 
  311   Tue Jan 30 11:36:19 2024 TylerUpdateElectronicsRTD Chassis



  
  323   Tue Feb 13 11:54:45 2024 TylerConfigurationFLIRIn-Air Optical Test Configuration
Below is the proposed schematic for FROSTI
optical testing, chosen so enough space is
allotted for prototype assembly.
 In-air_optical_test_sketch.png 
  324   Tue Feb 13 12:26:23 2024 TylerUpdateInterferometer SimulationsBS Code Update I reproduced Cao's CE beamsplitter code
(see below for example plots). I received
the current info on the beamsplitter parameters
 thickness1.pdfbs_opd_homloss_h6cm_w2cm.pdf 
  331   Tue Feb 20 11:31:49 2024 TylerUpdateCleanroomGarment Cabinet Door Replacement[Luis, Luke, Pooyan, Tyler]


The replacement
door for the HEPA garment cabinet arrived
last week, and was installed on Thursday.
 image_67190529.JPGimage_67177473.JPG 
  338   Fri Feb 23 18:03:27 2024 TylerUpdateFLIROptical Test Setup in Cleanroom[Tyler, Xuesi]

The FLIR and test mass
stand-in have been transferred into the cleanroom.
A software test will be run as soon as we
 IMG_0941.png 
  344   Wed Feb 28 12:02:08 2024 TylerUpdateGeneralResistors for Heater Elements UpdatePower         Res (Ohm) RTD Res (Ohm)

Heater
1= 72.8; 80.6

Heater 2= 69.5; 80.8

Heater
3= 70; 83.2

Heater 4= 70.6; 78.7

Heater
  
  345   Wed Feb 28 17:49:18 2024 TylerUpdateTCSFROSTI Assembly - Days 2-3[Aiden, Jon, Luis, Luke, Michael, Tyler]

FROSTI
assembly was completed today. The RTD and
power wires were terminated at the DB-25
 IMG_0947.pngIMG_0956.pngIMG_0957.pngIMG_0959.png 
  347   Wed Mar 6 09:57:52 2024 TylerUpdateTCSFROSTI Wiring Upon finishing the FROSTI assembly last
week, we ran into some electrical issues.
An electrical short was found between two
  
  349   Tue Mar 19 10:55:30 2024 TylerUpdateFLIRIn-Air Optical TestBelow is an image I took using the FLIR just
before leaving for the LVK meeting. The profile
is roughly what we would expect (annular).
 FroSTI_Thermal_Profile.png 
  351   Thu Mar 21 16:56:42 2024 TylerUpdateDAQRTD Parameter Calibration[Jon,Tyler]

 We noticed that the RTD
temperature readings given on the Cymac were
off, and traced the issue to miscalibration
 RTD_Calib-2.pngIMG_8569.jpg 