  12   Mon Nov 28 18:10:23 2022 shaneUpdateELOGParticle counts in the clean roomParticle count stats for the clean room Nov
28, 2022: 
Took 10 sample runs in each of
5 regions in the clean room (5 runs per region
 clean_room_particle_counts_11_28_-_Sheet1.pdf 
  19   Fri Feb 3 13:04:04 2023 shaneSummaryGeneralclean room particle counts 1/25/23Clean room count graphs for each zone (as
of January 25, 2023) attached
 cleanroomcountsJan25.pdf 
  71   Wed Apr 12 16:17:50 2023 shaneUpdateGeneralParticle Counter movedWith the added height of the new docking station,
the particle counter no longer fits under
the Windows monitor in the electronics rack
 IMG_6693.HEIC 
  178   Fri Jul 28 13:39:39 2023 shaneUpdateCleanroomfull 5 zone cleanroom particle countHere's the 5 zone cleanroom measurement from
today. 
 download.png 
  193   Mon Aug 7 13:58:46 2023 shaneUpdateCDSinternal power supply cables done for AI chassisFinished assembling and installing the aLigo
chassis internal power supply cables in the
anti-imaging chassis today. Tested for continuity
 IMG_8674.jpeg 
  260   Thu Nov 9 19:06:46 2023 shaneUpdateCleanroom5 zone cleanroom measurementHere's today's five zone measurement, taken
~5 hours after the cleaning. Zone 5 (closest
to fire cabinet and back wall) is a bit over
 23.jpeg 
  262   Fri Nov 10 14:16:04 2023 shaneUpdateCleanroomnew cleanroom zone diagramsince the vac system has been moved and made
permanent, here's a new diagram of the cleanroom
zones. The zones themselves haven't moved,
 cleanroom_zones_nov2023.jpg 
  309   Thu Jan 18 18:06:49 2024 shaneUpdateCleanroomcleanroom 5 zone particle count measurementHere's today's full five zone measurement
of the cleanroom
 24.png 
  315   Fri Feb 2 19:18:24 2024 shaneUpdateCleanroomcleanroom cleaning and particle count


[Aiden, Shane,
Luis, Luke]


cleaning cleanroom
and particle count
  
  318   Wed Feb 7 12:43:22 2024 shaneUpdateCleanroomcleanroom particle counts (full 5 zone measurement)Here's today's full 5 zone measurement of
the cleanroom. Everything is back under the
requirement. 
 24.png 
  365   Tue May 7 20:34:31 2024 shaneUpdateCDSfrosti MEDM screen update[Luis, Shane]
Here is the updated MEDM screen,
with new orientation and updated labeling
to reflect the actual positions of the heater
 FROSTIMEDMMay7.2024.png 
  505   Tue Jan 28 13:30:46 2025 shaneUpdateCDSSerial comms testing updateAttempted to communicate with the smaller
vac pump (TwissTor 74) via Agilent software
today. Was able to communicate with the pump
  
  546   Thu Apr 3 13:23:37 2025 shaneUpdateCDSUPS interfacingUpdate on UPS serial interfacing: the driver
for the UPS webcard has been installed on
spica (for UPS1 in room 1119) and logrus
  
  451   Wed Oct 2 10:31:46 2024 Xuesi MaConfiguration Group Meeting Slides 10/2/2024
Group Meeting slides for Non-deterministic
Heater Response.
 Group_Meeting_10_2.pdf 
  458   Tue Oct 15 15:27:38 2024 Xuesi MaUpdateELOGTiming Chassis Update
I conducted separate tests on the '5015'
and '3010a'. When powered individually, the
'5015' outputs a signal at 33.55 MHz with
 12x 
  503   Mon Jan 27 11:29:38 2025 Xuesi MaUpdate Heater Element Test[Ma, Cece, Luke, Mary, Shane]

On Friday (Jan 24), we installed
the heater elements on the stand. The heater
 20250124_165434.png20250124_165342.png20250214_132811.jpg 
  504   Mon Jan 27 23:35:28 2025 Xuesi MaUpdate  [Ma]
Installed all the pins to the peek
DB 25 connectors
 20250127_142647.jpg20250127_153454.jpg20250127_154516.jpg 
  506   Fri Jan 31 15:03:09 2025 Xuesi MaUpdate Heater Element Circuit Check
        table {
            width:
100%;
            border-collapse: collapse;
/* Merges borders into a single line */
  
  508   Mon Feb 3 13:17:21 2025 Xuesi MaUpdate  [Ma]
changed all zip ties to peek zip
ties, and grouped wires together. The setup
 20250203_123153.jpg20250203_123213.jpg 
  514   Tue Feb 18 10:01:07 2025 Xuesi MaUpdate  [Ma, Pooyan, Tyler]
On Friday, we connected the vacuum
chamber with the Cymac.
 IMG_7916.jpegIMG_7915.jpegIMG_7917.jpeg 
  515   Tue Feb 18 10:02:16 2025 Xuesi MaUpdate Group Meeting Slides 2/18/2025https://docs.google.com/presentation/d/1WiV2VqS0BzXNCK6VYYQ-Ty8xlHnzXatQaFbMf1-0rsY/edit?usp=sharing   
  525   Tue Feb 25 10:02:32 2025 Xuesi MaUpdate  1424039912.625576 2025/02/19 22:38:14 UTC Time
start
24V 2.8A right after start all 8
 resistance_vs_time_all_channels_all_time.pdftemperature_vs_time_all_channels_all_time.pdfresistance_vs_time_rise_time.pdfresistance_vs_time_fall_time.pdf 
  528   Tue Mar 4 03:05:42 2025 Xuesi MaUpdateELOGLOG1424564097.243212 2025/02/26 00:14:39 UTC Time
start
12V 2A right after start all 8 elements
  
  529   Tue Mar 4 03:33:18 2025 Xuesi MaUpdate UpdateSpikes Appear Again, need to address it
systematically.
Power on and off before reaching
 6x 
  539   Tue Mar 11 10:43:57 2025 Xuesi MaUpdate  Continue investigation in the spikes
Pulsed ADC with a function generator
and find no spikes. Rules out ADC for causing
 20250310_171936.jpg 
  544   Mon Mar 31 15:41:56 2025 Xuesi MaUpdate  The result from AI Chassis bypass test
showed that the AI Chassis may be the problem.
There are no spikes from DAC's direct output.
  
  547   Mon Apr 7 13:28:49 2025 Xuesi MaUpdate  Test 1: Adapter Board Connected to Filter
Board

  Setup:
AI Chassis is powered on. Signal is measured
 20250403_151946.jpgELOG_Spike_adapter_filter_on.png20250404_143624.jpgELOG_Spike_adapter_isolate.png20250407_105846.jpg 
  553   Tue Apr 15 11:13:43 2025 Xuesi MaUpdate  Test 4: AI Chassis ground isolation


 Setup: AI Chassis isolated
from the ground with readout directly connected
 20250414_120428.jpg20250414_120423.jpg20250411_163105.jpg 
  559   Tue Apr 22 12:08:46 2025 Xuesi MaUpdate  Test 7: Reconnect ribbon cables


 Setup: Reconnect all
the ribbon cables, and turned on the AI Chassis
 20250415_161755.jpg20250416_174640.jpg20250422_105614.jpg 
  567   Wed Apr 30 17:33:14 2025 Xuesi MaUpdateVACStarted bake[Luke, Ma, Tyler]
The
vacuum chamber is currently baking. 
  
  568   Fri May 2 12:34:02 2025 Xuesi MaUpdateVACStopped bakeThe
vacuum chamber has stopped baking. 
Current state as of 12:30, 5/2/2025:
  
  572   Tue May 6 13:19:31 2025 Xuesi MaUpdate     resistance_vs_time_RV_rise_time_24.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  576   Tue May 13 12:35:01 2025 Xuesi MaUpdate     resistance_vs_voltage_all.pdfresistance_vs_voltage_overlay.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  578   Thu May 15 12:03:41 2025 Xuesi MaInfrastructureElectronicsNoticeAll Sorensen power supplies are turned
off. The Cymac system is down (All Chassis
are down)
  
  579   Mon May 19 10:59:14 2025 Xuesi MaInfrastructure  

  Status Update


 Previous Status:
  
  580   Wed May 21 14:40:38 2025 Xuesi MaInfrastructureCleanroomCleanroom Temperature
    Date and Time:
Around 2:20 PM on May 21, 2025
    Location and Temperature:
 20250521_142051.jpg20250521_142220.jpg 
  583   Tue May 27 12:52:22 2025 Xuesi MaUpdate  Using the configuration in section 2.11.1
in the Sorensen installation and operation
manual (attached below), I'm able to remote
 6x 
  588   Tue Jun 3 13:08:47 2025 Xuesi MaUpdate  We currently have the parts for a DB9 connector
but need parts for a DB25 connector, where
did we get the parts for the DB9 connector?
 934.jpg933.jpg 
  589   Tue Jun 3 13:16:53 2025 Xuesi MaInfrastructure  
    Date and Time:
Around 3:50 PM on June 2, 2025
    Location and Temperature:
 928.jpg929.jpg931.jpg930.jpg932.jpg 
  591   Tue Jun 10 12:13:00 2025 Xuesi MaUpdate  
  By measuring the resistance of the
ladder, I obtained a graph of resistance
as a function of voltage.
 resistance_vs_voltage.pdfresistance_vs_voltage_element_5.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  594   Tue Jun 17 12:22:43 2025 Xuesi MaUpdate  



   
    
 11x 
  596   Tue Jun 24 11:50:15 2025 Xuesi MaUpdate  



   
    
 resistance_vs_time_all_channels_channel_switch.jpgresistance_vs_time_all_channels_channel_switch_one_cycle_before.jpgresistance_vs_time_all_channels_channel_switch_one_cycle_after.jpgresistance_vs_voltage.jpg 
  603   Tue Jul 1 13:41:36 2025 Xuesi MaUpdate  [Ma, Liu]
 Slides
  
  389   Fri Jun 28 10:43:13 2024 XuejunUpdateCleanroomFrosti[Xuejun, Tyler]


We moved Frosti into
the cleanroom and debugged it to make sure
everything was working. One of the DB25 pins
 frosti.jpgchassis.jpg 
  396   Mon Jul 8 10:39:14 2024 XuejunUpdateFLIRAverage Temperature Profile After taking data for each of the individual
heater elements, I imported them into python
and overlayed them to produce an average
 Average-Temperature-Profile.pdf 
  421   Tue Aug 6 13:07:07 2024 XuejunUpdateInterferometer Simulations [Xuejun]

 The width and location of
the measured in-air change in temperature
profile has been determined to be 0.045m
 Thermal_model_image.pnggenerated_irradiance_profile.png 
  235   Mon Oct 9 11:29:37 2023 TylerUpdateElectronicsPSD/CSD Plot UpdatesContinuing from Sophia's SURF Project this
summer: Plotting the Power-Spectral Densities
(PSDs) and Cross-Spectral Densities of two
 Screenshot_2023-10-09_at_11.20.25_AM.pngwelch_csd-2.png 
  243   Mon Oct 23 11:28:05 2023 TylerUpdateCamerasFLIR Camera Code UpdatesThe past week I've been spending time going
through the FLIR code on gitlab. Initially,
it had appeared that our measurements with
 Screenshot_2023-10-23_at_11.06.04_AM.png 
  249   Mon Oct 30 11:03:56 2023 TylerUpdateScripts/Programs 
FLIR: After some adjustments, the plot
generated from the FLIR measurements look
much more symmetric (see attachment). There
 Screenshot_2023-10-23_at_12.39.05_PM.png 
  255   Mon Nov 6 11:29:24 2023 TylerUpdateElectronicsPreliminary RTD Calculations, RP Software Update
Preliminary RTD calculations are shown
below, given an input of 10 V and desiring
a few mA of current. It looks like R_ref
 cvt.pngVvC.pngIMG_7471.jpg 