  303   Mon Jan 15 22:29:34 2024 JonInfrastructureGeneralCabinet installation & lab clean-up completed[Jon, Tyler, Aiden, Shane, Pooyan, Michael,
Cynthia, Luke]
On Wednesday, we completed long list
 1129.png1119.png 
  302   Wed Jan 10 15:27:18 2024 ShaneUpdateCleanroomcleanroom cleaning and particle count


[Aiden, Shane]


cleaning
cleanroom and particle count


2:03 pm: changed sticky
  
  301   Tue Jan 9 16:35:09 2024 AidenUpdateVACVAC System Leak and Heating[Luis, Luke, Aiden]

Leak tested each
flange and weld and only found two flanges
to have noticeable leaks with the electron
  
  300   Tue Jan 9 12:08:59 2024 TylerConfigurationElectronicsRTD Readout Chassis Update
Below is the current state of the RTD
readout chassis wiring. Initial continuity
tests seem good, will run through one more
 IMG_8105.jpg 
  299   Mon Jan 8 20:24:53 2024 AidenUpdateGeneral [Jon, Aiden]

Installed the heater elements
into their fixture and prepped the cables
by twisting the wires into pairs. We also
 IMG_4888.jpgIMG_4886.jpgIMG_4887.jpg 
  298   Fri Dec 29 16:02:27 2023 JonConfigurationElectronicsRTD Readout ChassisThe custom front and rear panels for the
RTD readout chassis arrived last Friday.
I installed them in the chassis frame to
 front.jpegrear.jpegoverhead.jpeg 
  297   Wed Dec 20 10:33:34 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129Update: I
have completed permanent routing of the electrical
cables. I also ran the ultrasonic washer's
  
  296   Tue Dec 19 15:45:05 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook RGA data for the macor parts inside of
the chamber. With the Ar open the HC levels
read 30 torrl/s which is around where it
 bake9_231219_Macor_ArO.pngbake9_231219_Macor_ArC.png 
  295   Mon Dec 18 15:51:49 2023 AidenUpdateVACVAC System Heating UpdateAfter letting the chamber cool down I put
the electronics back on and turned the RGA
element back on. No data has been taken yet
  
  294   Sun Dec 17 21:04:15 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129[Jon, Tyler, Aiden, Luke]
On Friday we completed assembly of
the new stainless steel-topped benches in
 IMG_0781.pngIMG_0782.png 
  293   Sun Dec 17 19:43:18 2023 AidenUpdateVACVac Heating Update[Aiden]

I measured the temperature of
the flanges where some of the electronics
will go and I found that the RGA flange was
  
  292   Fri Dec 15 14:03:02 2023 AidenHowToVACVacuum Chamber Opening[Aiden]

1. Turn off the RGA filament
and disconnect it.

2. Record the pressure
and then close the angle valve and gate valve
  
  291   Mon Dec 11 16:20:17 2023 JonSummaryTCSFROSTI Assembly ProcedureBelow is the procedure we will follow to
assemble the FROSTI prototype.

Install SS guide rods and
  
  290   Mon Dec 11 12:58:57 2023 Shane, LuisUpdateCDSDAC-ADC loopback test debugging[Luis, Shane]

Working on debugging last
week's weird results for the ADC-DAC loopback
test for channels 14 and 15. With DAC output
  
  289   Sat Dec 9 12:34:12 2023 JonUpdateGeneralElectronics workshop migrated to 1129[Jon, Tyler, Shane, Luis]
On Wednesday we completed the migration
of the electronics workshop from 1119 to
 IMG_0765.jpgIMG_0767.jpeg 
  288   Fri Dec 8 11:15:21 2023 PeterUpdateVLC UpdateVLC AssemblyThe optics of the visible light cavity have
been assembled. The mode matching telescope
is folded through the two stirring mirrors
 IMG_4194.jpgIMG_4195.jpgIMG_4197.jpgIMG_4196.jpg 
  287   Thu Dec 7 14:13:15 2023 ShaneUpdateCleanroomcleanroom cleaning and particle count


[Aiden, Shane,
Michael, Luke, Cynthia]


cleaning
cleanroom and particle count
  
  286   Thu Dec 7 12:42:42 2023 AidenUpdateVACVacuum Chamber Baking UpdateAfter leaving the RGA on for a few days the
chamber has settled at 2.01 e-8 torr. I also
have good news that the chamber looks to
 December_06_Ar_Open_Stainless_Steel_Fasteners_Analyzed.pngbake8_231206_SSFasteners_ArO.png 
  285   Mon Dec 4 21:27:53 2023 ShaneUpdateCDSADC-DAC loopback test resultsHere are the test results from today's ADC-DAC
loopback tests. Channels 14 and 15 were the
only ones behaving abnormally. Not sure what
 adc-dac_loopback_testing_results.pdf 
  284   Mon Dec 4 11:19:50 2023 AidenUpdateVACVacuum Chamber Baking Update[Aiden]

Took some RGA data of the chamber
after it has been cooling down. I do not
believe that this data accurately shows the
 bake8_231204_SSFasteners_ArO.pngbake8_231204_SSFasteners_ArC.pngDecember_04_Ar_Open_Stainless_Steel_Fasteners_Analyzed.pngbake8_231204_SSFasteners_ArO.png 
  283   Sat Dec 2 18:10:23 2023 AidenUpdateVACVAC System Heating Update[Aiden]

Turned off the heating tape
today in anticipation to take more RGA data
on Sunday or Monday morning before the meeting.
  
  282   Thu Nov 30 13:58:18 2023 AidenUpdateVACVAC System Heating Update[Aiden]

Came into the lab in the morning
to check on the chamber heating. I decided
to set the PID controllers to 110C rather
  
  281   Thu Nov 30 13:50:32 2023 TylerUpdateLoreWorkbench Assembly Completed[Tyler, Luke, Aiden]



The workbenches
are now completely assembled and put into
their final places. Additionally, the tool
 IMG_7686.jpg 
  280   Wed Nov 29 21:13:32 2023 AidenUpdateVACVAC System Heating UpdateStarted Bake 8 today. Set the PID controllers
to 120 C and will check in the morning for
equilibrium temperatures for the lid and
  
  279   Mon Nov 27 19:34:50 2023 AidenUpdateClean & BakeClean and Bake Batch 20 BaggingBagged and tagged bath 20 which included the
macor hardware and place it inside the clean
room on the table.
  
  278   Mon Nov 27 14:22:30 2023 TylerUpdateLore1129 Assembly Update[Tyler, Michael, Luke, Cynthia]


The
tabletops have been attached to the workbench
frames. Unfortunately, one of the tabletops
 IMG_7669.jpgIMG_7668.jpg 
  277   Thu Nov 23 12:34:44 2023 JonUpdateCDSDB25 signal connections for FROSTI heatersUpdate: I was able to put the
FROSTI power controller on the lab network.
It is connected to the switch in the top
  
  276   Wed Nov 22 15:46:50 2023 ShaneUpdateCDSDB25 signal connections for FROSTI heaters


[Shane,
Jon]

Installed new DC smart switch in electronics
 DB25input_signals.pdfIMG_3137.jpegdc_smart_switch_signal_connections.jpeg 
  275   Tue Nov 21 22:09:44 2023 AidenUpdateGeneralTesting Parts[Aiden, Luis]


Luis and Aiden vented
the chamber today. We closed off the RGA
section and then proceeded to open the the
 8x 
  274   Tue Nov 21 14:47:24 2023 TylerUpdateLore1129 Workbench Assembly Update 1
[Tyler, Shane, Mohak, Cynthia, Luke,
Michael, Luis]


Started assembly of the workbench
 IMG_7569.jpgIMG_7568.jpg 
  273   Mon Nov 20 20:45:16 2023 AidenUpdateVACLeak Test
[Aiden, Luis]

Tested every weld
and flange to find leaks. Only found that
the flange on the turbo pump and reducing
  
  272   Mon Nov 20 20:37:45 2023 AidenUpdateVACClean and Bake Batch 20[Aiden, Luis]
Started to clean and bake the
macor parts for the FROSTI reflector. Per
LIGO documentation cleaned the macor in liquinox
  
  271   Mon Nov 20 10:10:50 2023 TylerConfigurationElectronicsRTD Logic/Schematic Diagrams
Below are a basic diagram of what the
RTD measurement circuit logically looks like
and an example schematic of the actual wiring.
 FIN_RTD_circuit.pngSample_Circuit_Schematic.png 
  270   Fri Nov 17 14:06:01 2023 ShaneUpdateCleanroom5 zone particle countHere's today's 5 zone particle count measurement
for the cleanroom. Zone 5 (closest to back
wall by fire cabinet) is still above the
 23.png 
  269   Thu Nov 16 19:32:31 2023 AidenUpdateVACVAC HC Levels UpdateTook some more RGA data today and overlaid
it with data taken from October 19. I added
a red line that symbolizes where all amu
 bake7_231116_ArO.pngNovember_15_Ar_Open_Analyzed.png 
  268   Thu Nov 16 17:12:42 2023 Luis, Shane, MohakUpdateCleanroomCleanroom cleaning and particle count


[Shane, Luis,
Mohak]


cleaning cleanroom and
particle count
  
  267   Wed Nov 15 21:52:33 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook RGA data before running the degas mode.
Made sure to close off the main volume before
running the degas. And left the filament
 bake7_231115_ArC.pngbake7_231115_ArO.png 
  266   Tue Nov 14 17:21:40 2023 JonUpdateVACRGA best practicesAs a follow up ELOG 261,
I have received advice from one of the vacuum
experts at LIGO Hanford on best practices
  
  265   Mon Nov 13 11:23:54 2023 Jon UpdateCDSCyMAC testing[Jon, Shane, Luis]
My repair of the internal ribbon
connecting the ADC to the adapter board resolved
 Cymac_GDS_Diagnostics.png 
  264   Mon Nov 13 11:07:50 2023 TylerUpdateVACRTD Analysis
After initial analysis from last week
on a single RTD, I then extended to looking
at all 8 in series with R_ref (set to 1 kOhm).
 Screenshot_2023-11-13_at_11.05.45_AM.pngScreenshot_2023-11-13_at_11.06.04_AM.png 
  263   Mon Nov 13 06:15:45 2023 PeterUpdateVLC UpdateVLC Mode MatchingWeekly Updates Attached in pdf  VLC_Mode_Matching_3.pdf 
  262   Fri Nov 10 14:16:04 2023 shaneUpdateCleanroomnew cleanroom zone diagramsince the vac system has been moved and made
permanent, here's a new diagram of the cleanroom
zones. The zones themselves haven't moved,
 cleanroom_zones_nov2023.jpg 
  261   Fri Nov 10 08:32:34 2023 JonUpdateVACRGA experimentsI ran a 3-minute
degas cycle of the RGA filament for the first
time yesterday (in this process, the filament
  
  260   Thu Nov 9 19:06:46 2023 shaneUpdateCleanroom5 zone cleanroom measurementHere's today's five zone measurement, taken
~5 hours after the cleaning. Zone 5 (closest
to fire cabinet and back wall) is a bit over
 23.jpeg 
  259   Thu Nov 9 13:57:58 2023 Shane, Luis, Aiden, TylerUpdateCleanroomcleanroom cleaning and particle count


[Aiden, Shane,
Luis, Tyler]


cleaning cleanroom
and particle count
  
  258   Thu Nov 9 13:48:47 2023 AidenUpdateVACVacuum Chamber Baking UpdateAfter bake 7 was stopped on Wednesday morning
(11,8,2023), I took RGA data of the chamber
to compare to a later scan that will be done
 bake7_231109_ArC.pngbake7_231109_ArO.png 
  257   Wed Nov 8 17:55:49 2023 JonUpdateGeneralLab Clean-Up Day 1[Jon, Tyler, Shane, Peter, Luis]
Today we completed the first phase
of lab clean-up. Activities included:
  
  256   Mon Nov 6 11:31:25 2023 PeterUpdateVLC UpdateVLC Mode MatchingSee Update Attached  VLC_Update_11_6_23.pdf 
  255   Mon Nov 6 11:29:24 2023 TylerUpdateElectronicsPreliminary RTD Calculations, RP Software Update
Preliminary RTD calculations are shown
below, given an input of 10 V and desiring
a few mA of current. It looks like R_ref
 cvt.pngVvC.pngIMG_7471.jpg 
  254   Thu Nov 2 17:14:36 2023 Shane, Jon UpdateCDSCyMAC set up permanentized



CyMAC connections
have been finalized and made permanent. Also
tested voltages, which are all looking good.
 cymac_chassis_back.jpegcymac_chassis_back2.jpegcymac_chassis_front.jpegfinal_connections_back_of_power_supply.jpegpower_supply_back.jpeg 