Wed Oct 16 13:58:59 2024, Luis Martin, Update, VAC, RGA Scan
|
Wed Oct 23 11:48:06 2024, Luis Martin, Update, VAC, Leak Test Results
|
Wed Oct 23 12:08:36 2024, Luis Martin, Update, VAC, RGA Scan
|
Tue Nov 5 09:56:04 2024, Luis Martin, Update, Clean & Bake, MR Bake
|
Tue Nov 5 11:08:40 2024, Luis Martin, Update, VAC, ISO Test
|
Wed Nov 20 12:31:24 2024, Luis, Update, VAC, Leak test RGA Scan after vacuum repairs
|
Fri Jun 14 13:32:13 2024, Liu, Update, Scripts/Programs, COMSOL simulation on rectangular heater elements design 6x
|
Mon Jun 17 11:47:46 2024, Liu, Infrastructure, General, Temporary cooling units for the labs
|
Fri Jun 21 11:47:30 2024, Liu, Update, Scripts/Programs, COMSOL simulation on alternative straightened heater elements design 6x
|
Thu Jun 27 11:09:14 2024, Liu, Update, Scripts/Programs, Straight edge STEP files and ray loss analysis
|
Fri Jul 5 13:17:44 2024, Liu, Update, Interferometer Simulations, Four-quadrant FROSTI-like RH for astigmatic thermal actuation for CE optics 7x
|
Fri Jul 5 14:12:32 2024, Liu, Update, Interferometer Simulations, CE BS Mechanical Resonances
|
Fri Jul 5 14:23:13 2024, Liu, Update, Interferometer Simulations, Engineering drawings for straight edge heater element designs for FROSTI
|
Mon Jul 15 09:36:44 2024, Liu, Update, Interferometer Simulations, ETM Profile Optimization for FROSTI
|
Mon Jul 29 12:18:52 2024, Liu, Update, Interferometer Simulations, Update on FROSTI O5 ETM profile optimization
|
Mon Jul 29 12:20:56 2024, Liu, Update, Interferometer Simulations, Update on wavefront actuation with astigmatically driven RH for CE
|
Mon Jul 29 12:23:10 2024, Liu, Update, Interferometer Simulations, Update on mechanical resonances of CE BS with stiffener ring
|
Wed Oct 2 14:49:59 2024, Liu, Update, , FROSTI ETM actuation
|
Wed Oct 16 14:13:31 2024, Liu, Update, , FROSTI with non uniform absorption scattering sources
|
Wed Nov 6 13:48:55 2024, Liu, Update, Interferometer Simulations, QN modeling update
|
Wed May 3 19:03:47 2023, Julian,Pamella and Cao, Physics, VAC, Modify vacuum asssembly and install RGA
|
Fri Jan 27 18:44:31 2023, Julian , Update, General, Vacuum Chanmber Cleaning
|
Wed Jan 18 22:06:05 2023, Julian, Update, ELOG, Cleanroom Update
|
Mon Feb 6 20:02:32 2023, Julian, Update, General, Cleanroom Update
|
Sat Feb 11 00:17:27 2023, Julian, Update, General, Vacuum Chamber Cleaning
|
Thu Feb 23 21:12:33 2023, Julian, Update, General, Vacuum Chamber Cleaning
|
Thu Mar 2 20:53:56 2023, Julian, Update, General, Cleanroom Update
|
Sat Mar 4 00:34:46 2023, Julian, Update, General, Cleanroom Update
|
Thu Mar 23 18:40:08 2023, Julian, Update, General, Cleanroom Update
|
Tue May 2 17:03:14 2023, Jon, Cao, Physics, VAC, First pump-down test of vacuum chamber
|
Thu Jun 29 18:27:26 2023, Jon, Cao, Infrastructure, VAC, Vacuum bake attempt 3: success!
|
Mon Nov 13 11:23:54 2023, Jon , Update, CDS, CyMAC testing
|
Thu Jun 2 16:14:58 2022, Jon, HowTo, General, Custom conda environment on JupyterHub
|
Thu Jun 2 21:55:02 2022, Jon, Update, Cameras, FLIR Camera Setup
|
Fri Jun 3 13:03:33 2022, Jon, Update, Cameras, FLIR Camera Setup
|
Mon Jun 6 17:11:48 2022, Jon, Update, Cameras, FLIR Camera Setup
|
Mon Jul 11 14:29:45 2022, Jon, Omnistructure, General, HEPA filter installed
|
Wed Dec 14 17:35:41 2022, Jon, Infrastructure, Computers, Windows Laptop
|
Wed Dec 14 18:34:33 2022, Jon, Configuration, Electronics, Adapter for 532 nm laser power supply
|
Tue Feb 7 17:44:17 2023, Jon, Infrastructure, Computers, Workstation 1 (ws1) set up
|
Wed Mar 1 21:27:20 2023, Jon, Infrastructure, Cleanroom, Over-table shelf height raised
|
Wed Mar 1 21:50:46 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart
|
Mon Mar 6 15:32:58 2023, Jon, Infrastructure, General, Cabinet installation completed
|
Wed Mar 22 12:16:20 2023, Jon, Infrastructure, Cleanroom, Experimenting with HEPA fan speeds
|
Fri Mar 24 07:14:38 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart
|
Tue Apr 4 16:43:53 2023, Jon, Update, VLC Electronics, Additional Thorlabs PDA10A2
|
Tue Apr 4 16:52:08 2023, Jon, Update, Cleanroom, Particle counter docking station
|
Fri Apr 21 00:06:43 2023, Jon, Update, VAC, Vacuum prep and installation - parts have arrived
|
Tue Apr 25 11:56:37 2023, Jon, Update, VLC Electronics, Red Pataya has arrived
|
Thu Apr 27 21:43:07 2023, Jon, Physics, VAC, Grounding vacuum system
|
|