  459   Wed Oct 16 13:58:59 2024 Luis MartinUpdateVACRGA ScanThe following figure displays data acquired
on 10/09, and it shows that we are no longer
below the cleanliness standard. Also, the
 2024-10-09_PostBake1_ArO.png 
  462   Wed Oct 23 11:48:06 2024 Luis MartinUpdateVACLeak Test Results[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself
ran a leak test, the results are displayed
  
  463   Wed Oct 23 12:08:36 2024 Luis MartinUpdateVACRGA Scan[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself
ran a RGA scan, the results are displayed
 2024-10-22_PostBake1_ArO.png 
  467   Tue Nov 5 09:56:04 2024 Luis MartinUpdateClean & BakeMR Bake    [Luke, Luis]
    
        On Friday, 11/1/24,
the MR was unpackaged and cleaned under the
  
  468   Tue Nov 5 11:08:40 2024 Luis MartinUpdateVACISO Test
    [Luis, Luke, Ma Michael]
    
        The isolation test
was conducted on the vacuum system. Every
  
  476   Wed Nov 20 12:31:24 2024 LuisUpdateVACLeak test RGA Scan after vacuum repairs[Luke, Luis]
After the gasket replacement performed
on Monday (11/18/24) we let the vacuum pump
 2024-11-20_PostBake1_ArO.png 
  376   Fri Jun 14 13:32:13 2024 LiuUpdateScripts/ProgramsCOMSOL simulation on rectangular heater elements designI have been looking at the feasibility
of an alternative heater element design for
FROSTI that replaces the original ring-like
 6x 
  377   Mon Jun 17 11:47:46 2024 LiuInfrastructureGeneralTemporary cooling units for the labsBelow are the temporary cooling units installed
last week in labs 1119 and 1129. They are
the temp. replacement for the building AC
 1119.jpg1129.jpg 
  380   Fri Jun 21 11:47:30 2024 LiuUpdateScripts/ProgramsCOMSOL simulation on alternative straightened heater elements design In the previous post, we saw
that for the heater element design with straight
 6x 
  387   Thu Jun 27 11:09:14 2024 LiuUpdateScripts/ProgramsStraight edge STEP files and ray loss analysis Drawings and CAD models of the straight-edge
designs are exported, and are visualized
in SOLIDWORKS. Two are attached. One is a
 edge_CAD_8x2_step.PNGedge_CAD_step.PNGIrradiance_frontheater.pngIrradiance_profile.pdf 
  393   Fri Jul 5 13:17:44 2024 LiuUpdateInterferometer SimulationsFour-quadrant FROSTI-like RH for astigmatic thermal actuation for CE opticsIn the CE corner layout design and down selection
study, interferometer layouts with large
incidence angles on some of the curved optics
 7x 
  394   Fri Jul 5 14:12:32 2024 LiuUpdateInterferometer SimulationsCE BS Mechanical ResonancesThe butterfly and drumhead mechanical modes
for the aLIGO BS were calculated in COMSOL.
The resonant frequencies for the two acoustic
 butterfly.pngdrumhead.png 
  395   Fri Jul 5 14:23:13 2024 LiuUpdateInterferometer SimulationsEngineering drawings for straight edge heater element designs for FROSTIStep files and engineering drawings for the
straight edge heater element designs have
been created in COMSOL and SolidWorks. They
  
  404   Mon Jul 15 09:36:44 2024 LiuUpdateInterferometer SimulationsETM Profile Optimization for FROSTI This is to optimize the FROSTI heating
profile for ETM, by minimizing the residual
RMSE of the HR surface deformation after
 pdf_merged.pdf 
  413   Mon Jul 29 12:18:52 2024 LiuUpdateInterferometer SimulationsUpdate on FROSTI O5 ETM profile optimizationUpdate on FROSTI O5 ETM profile optimization
is attached. 
 pdf_merged.pdf 
  414   Mon Jul 29 12:20:56 2024 LiuUpdateInterferometer SimulationsUpdate on wavefront actuation with astigmatically driven RH for CEUpdate on wavefront actuation with astigmatically
driven RH for CE is attached. 
 SURF_nonastig_merged.pdf 
  415   Mon Jul 29 12:23:10 2024 LiuUpdateInterferometer SimulationsUpdate on mechanical resonances of CE BS with stiffener ringUpdate on mechanical resonances of CE BS with
stiffener ring is attached. 
 eigen_freqs_merged.pdf 
  455   Wed Oct 2 14:49:59 2024 LiuUpdate FROSTI ETM actuationProposed FROSTI ETM actuation on the HOM7
resonance.  

Animation
  
  460   Wed Oct 16 14:13:31 2024 LiuUpdate FROSTI with non uniform absorption scattering sourcesSlides   
  469   Wed Nov 6 13:48:55 2024 LiuUpdateInterferometer SimulationsQN modeling updateSlides   
  91   Wed May 3 19:03:47 2023 Julian,Pamella and CaoPhysicsVACModify vacuum asssembly and install RGA[Pamella, Julian, Cao]

   Today we
started re-configuring the vacuum chamber
components. 

 Particle count
 vaccum_chamber_re-configuration.jpg 
  18   Fri Jan 27 18:44:31 2023 Julian UpdateGeneralVacuum Chanmber CleaningI used the IPA wipes to wipe down the inside
of the chamber the best I could. I cleaned
the main chamber but not any of the connecting
  
  15   Wed Jan 18 22:06:05 2023 JulianUpdateELOGCleanroom UpdateI wiped down all the inner walls of the cleanroom
using alcohol wipes, as per Cao's instruction.
  
  22   Mon Feb 6 20:02:32 2023 JulianUpdateGeneralCleanroom UpdateI wiped down the main table (including frame,
legs, and transparent shelf) and workbench
using alcohol wipes. Once I cleaned all of
  
  27   Sat Feb 11 00:17:27 2023 JulianUpdateGeneralVacuum Chamber CleaningToday I finished wiping down the rest of the
vacuum chamber, specifically focusing on
the connecting ports and outside surface
 20230210_181404.jpg20230210_181424.jpg20230210_181541.jpg20230210_181606.jpg 
  33   Thu Feb 23 21:12:33 2023 JulianUpdateGeneralVacuum Chamber CleaningToday I was able to come in and wipe down
both sides of the vacuum chamber lid using
the regular alcohol wipes and also wipes
 ChamberLid_inside.jpgChamberLid_outside.jpgVacuumChamber_inside.jpg 
  41   Thu Mar 2 20:53:56 2023 JulianUpdateGeneralCleanroom UpdateToday Pamella and Julian began the final cleaning
of the cleanroom, starting with the HEPA
vacuuming and mopping then wiping down every
  
  43   Sat Mar 4 00:34:46 2023 JulianUpdateGeneralCleanroom UpdateToday I was able to finish cleaning the frame
of the laser table, and for good measure
I wiped down the tabletop and exterior of
  
  55   Thu Mar 23 18:40:08 2023 JulianUpdateGeneralCleanroom UpdateToday Pamella and I came in to Hepa vacuum
and mop the floor of the cleanroom for general
maintenance. 
  
  90   Tue May 2 17:03:14 2023 Jon, CaoPhysicsVACFirst pump-down test of vacuum chamber [Jon, Cao] 

  1. Re-routing of cables 
 PXL_20230502_203343616.jpgPXL_20230502_210234897.MP.jpg 
  138   Thu Jun 29 18:27:26 2023 Jon, CaoInfrastructureVACVacuum bake attempt 3: success![Jon, Cao]


 Summary : We resolved
problems with heaters tripping power and
were able to proceed with chamber baking
 NewInsulation.pngBypassLineInsulation.jpg 
  265   Mon Nov 13 11:23:54 2023 Jon UpdateCDSCyMAC testing[Jon, Shane, Luis]
My repair of the internal ribbon
connecting the ADC to the adapter board resolved
 Cymac_GDS_Diagnostics.png 
  2   Thu Jun 2 16:14:58 2022 JonHowToGeneralCustom conda environment on JupyterHubCross-linking instructions: How
to run a Jupyter notebook in your custom
Conda environment
  
  3   Thu Jun 2 21:55:02 2022 JonUpdateCamerasFLIR Camera SetupThe new FLIR A70 infrared camera has arrived.
Tyler and I unpacked it in the lab yesterday.
In less than an hour, we succeeded in powering
 IMG_1473.pngIMG_1474.png 
  4   Fri Jun 3 13:03:33 2022 JonUpdateCamerasFLIR Camera SetupSummary
I have installed the
requisite software on chimay for interfacing
the FLIR A70 camera in Python. There are
  
  5   Mon Jun 6 17:11:48 2022 JonUpdateCamerasFLIR Camera SetupToday I tested the Spinnaker/PySpin software
installations (detailed in ELOG
#4) with the FLIR camera connected to
 IMG_1480.pngIMG_1481.png 
  7   Mon Jul 11 14:29:45 2022 JonOmnistructureGeneralHEPA filter installedToday I unpacked and installed the new HEPA
filter for the lab. It is an Omni CleanAir
OCA1210 capable of 1200 CFM. This flow rate
 IMG_1530.png 
  13   Wed Dec 14 17:35:41 2022 JonInfrastructureComputersWindows LaptopI set up the new Windows 10 laptop (pictured
below), which arrived yesterday. This laptop
is intended to be used for running lightweight
 laptop.png 
  14   Wed Dec 14 18:34:33 2022 JonConfigurationElectronicsAdapter for 532 nm laser power supplyI installed an EU-to-US plug adapter for the
532nm laser's 9V power supply. I then re-measured
the laser's power with the correct supply
 laser_power.png 
  24   Tue Feb 7 17:44:17 2023 JonInfrastructureComputersWorkstation 1 (ws1) set upThe Linux workstation (ws1) that used to sit
on the old workbench has been mounted on
the new electronics bench and is now ready
 ws1.jpg 
  39   Wed Mar 1 21:27:20 2023 JonInfrastructureCleanroomOver-table shelf height raisedJon, Cao

Today we raised the height of the
shelf overhanging the cleanroom laser table
 cleanroom-shelf.jpg 
  40   Wed Mar 1 21:50:46 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe Linux workstation (ws2) that used to
sit on the blue workbench (now inside the
cleanroom) has been mounted on a mobile cart,
 ws2_cart-1.jpegws2_cart-2.jpeg 
  44   Mon Mar 6 15:32:58 2023 JonInfrastructureGeneralCabinet installation completedJon, Cao, Peter
This morning Facilities delivered
and installed two new cabinets with sliding
 IMG_0088.jpgIMG_0089.jpg 
  53   Wed Mar 22 12:16:20 2023 JonInfrastructureCleanroomExperimenting with HEPA fan speedsJon, Cao
In effort to try to reduce the noise
level inside the cleanroom, we have dialed
  
  56   Fri Mar 24 07:14:38 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe ws2 cart has been thoroughly wiped down
with IPA wipes and moved inside the cleanroom.
I have reconnected it to power and Ethernet
  
  63   Tue Apr 4 16:43:53 2023 JonUpdateVLC ElectronicsAdditional Thorlabs PDA10A2I ordered a second PDA10A2 and mounting post
+ spacer (which puts the aperture at the
VLC's standard 3" beam height). These arrived
 PDA10A2.png 
  64   Tue Apr 4 16:52:08 2023 JonUpdateCleanroomParticle counter docking stationDue to the problems we have encountered trying
to serially communicate directly with the
Met One DR-528 particle counter, I went ahead
 Met_One_Dock.png 
  74   Fri Apr 21 00:06:43 2023 JonUpdateVACVacuum prep and installation - parts have arrivedThe two parts needed to complete the vacuum
assembly (ELOG
70) have arrived.
 SS_parts.png 
  78   Tue Apr 25 11:56:37 2023 JonUpdateVLC ElectronicsRed Pataya has arrivedThe Red Pataya 125-14 starter kit that we
ordered for locking the 532 nm cavity has
arrived. I left it laying on the optical
 Red_Pataya.jpg 
  82   Thu Apr 27 21:43:07 2023 JonPhysicsVACGrounding vacuum systemThis afternoon I made up a green 10 AWG
grounding cable and connected it to the vacuum
system.
 IMG_0141.pngIMG_0140.png 