  Richardson Lab Experimental Log, Page 4 of 11  Not logged in ELOG logo
ID Date Authordown Type Category Subject Text Attachments
  326   Tue Feb 13 13:02:41 2024 PooyanUpdateInterferometer SimulationsCacity sacn of Fabry-Perot Created a simple model of Fabry-Perot cavity
in SIS, and did a cavity scan. Total power
in the cavity, 00 mode, and HOMs is measured.
 IFOSim_update_2_13_24.pdf 
  356   Wed Mar 27 00:03:57 2024 PooyanUpdateComputersChimay relocation to Physics 1129 [Jon, Pooyan]

 Moved Chimay from
the server rack in Physics 1119 to a new
rack in Physics 1129. It is connected to
 Chima_front.jpgChimay_back.jpg 
  358   Mon Apr 8 14:43:29 2024 PooyanUpdateInterferometer SimulationsSIS update single and coupled cavities[Pooyan, Cynthia]

Attached is a brief
recap PDF file. A video file showing separate
HOMs plots for the cavity scan with ETM08
 IFOSim_SIS__update_4_8_24.pdfScreen_Recording_2024-03-31_at_2.46.29_AM.mov 
  382   Mon Jun 24 21:38:25 2024 PooyanInfrastructureComputersComputer server changes in 1119 and 1129[Jon, Pooyan, Tyler]
 
A few computer machine changes have
 IMG_6889.jpgIMG_6890.jpg 
  406   Mon Jul 15 14:28:32 2024 PooyanUpdateInterferometer SimulationsaLIGO test mass surface profiles Created a Google Slides presentation to
summarize all the mirror surface map information
that we use for simulating interferometers. 
  
  407   Mon Jul 15 14:49:06 2024 PooyanUpdateComputersSynology NAS server setupInstalled a Synology NAS server (Synology
RackStation RS1221) in lab room 1129, with
host name “scribe” and ip “192.168.1.17”.
  
  437   Mon Sep 9 14:27:36 2024 PooyanInfrastructureComputersChimay backup attemptOne ongoing work is to make all lab machines
automatically backed-up on Scribe on a daily
basis. The updates should be boatable and
  
  10   Wed Aug 17 16:04:30 2022 Phoebe ZylaSummaryLoreTesting the Cartridge Heater and Collecting FLIR DataWe have tested the heater to find emissivity,
mounted the heater system to the optical
table, and have taken irradiance maps of
 Screenshot_(74).pngScreenshot_(75).pngScreenshot_from_2022-08-15_11-24-40.pngAcquisitionImage(Aug-15-2022_14_16).jpg 
  8   Fri Jul 22 13:20:28 2022 PhoebeUpdate ComsolI will be using comsol until 1:30 pm today.
I will be updating the model for the heater
mount to be thicker in certain areas, so
  
  16   Mon Jan 23 17:26:15 2023 Peter CarneyUpdateGeneralOven cleaningAiden and Cao 
Turned on the oven to 120
deg C for 12 hours. After 12 hours, put it
at 200 deg C for 48 hours. 
  
  21   Sat Feb 4 17:01:03 2023 PeterUpdateVLC ElectronicsLaser DataPeter and Ryan took laser beam data. Configuration:
100mm focal length lens is ~100mm from lens.
150mm focal length lens is ~200mm from first
 OmegaX_M2_Fit_3.pngOmegaY_M2_Fit_3.png 
  36   Tue Feb 28 19:31:05 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook M2 measurements today. Configuration:
Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm)
at 200mm, camera at 350mm. The laser beam
 X_width_and_Y_width.png 
  37   Tue Feb 28 19:33:51 2023 PeterUpdate 532 M2 MeasurementsY axis of plot in units of micrometers. X
axis in units of millimeters. 
  
  48   Thu Mar 9 12:03:59 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 Data today. Picture of the optical
set up is shown below. lens1 f = 100mm, lens2
f = 50mm, lens3 f = 150mm. There was a nice
 OmegaY_M2_Fit_3.pngOmegaX_M2_Fit_3.pngoptical_setup.jpg 
  50   Fri Mar 10 12:08:09 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 laser data today. The configuration
is the same as before except now the beam
camera is the only component moving. Pictures
 OmegaX_M2_Fit_4.pngOmegaY_M2_Fit_4.png 
  61   Tue Apr 4 09:39:58 2023 PeterUpdateVLC Electronics532 M2 MeasurementsFinal M squared measurements were taken Wednesday,
3/29/23 by Peter and Ryan Hinosawa. 5 separate
sets of data were taken, and upon discussion,
 OmegaY_M2_Fit_8.pdfOmegaX_M2_Fit_8.pdfM2_Measurements_Set_Up.svgBeam_Data_8_3lens.txt 
  62   Tue Apr 4 09:53:37 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsThe set up for the next round of beam characterization
measurements has begun. The beam is initially
passing through a half waveplate, is split
 initial_Intens_measure_set_up.jpg 
  65   Thu Apr 6 10:20:43 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsMore optical components were added to the
optical set up for laser intensity / polarization
drift measurements. Both lenses and both
 Optical_Setup_4-6-23.jpg 
  83   Fri Apr 28 11:21:01 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsThe Digi-key cables have arrived, and I have
began implementing them in the intensity
drift measurements. 

There was a slight
 IMG-0183.jpg 
  88   Mon May 1 18:56:57 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementI've configured the two PDA's to the Red Pitaya.
I put a 50 ohm resistor connector to each
red pitaya input port. This was because the
 graphs.jpgTime_Series_Trial_1.png 
  89   Tue May 2 15:55:33 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementI changed the 1/2 wave plate from the lens
mount to the rotational optic mount. This
allowed me to rotate the 1/2 wave plate,
 IMG-0221.jpgIMG-0222.jpggraphs(1).jpgTime_Series_Trial_2.png 
  92   Thu May 4 14:01:10 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementI adjusted the rotational mount of the wave
plate to see if the power can be 100% coupled
into either S or P polarization. The images
 graphs(3).jpggraphs(2).jpg 
  99   Tue May 16 11:56:33 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementWith the configuration the exact same as before,
I used the Jupyter notebook in the red pitaya's
development package to collect data from
 Time_Series_Trial_3.png 
  101   Thu May 18 14:07:08 2023 PeterUpdateVLC Update532nm Intensity MeasurementI figured out a method in which to capture
power measurements including the initial
seconds in which the beam is first turned
 Time_Series_Trial_4.pngTime_Series_Trial_5_2hrs.png 
  102   Mon May 22 16:43:28 2023 PeterUpdateVLC ElectronicsLaser intensity/polarization drift measurementsIn order to fully analyze the polarization
data taken last Thursday, I needed to convert
the signal output (which is in volts) to
 S-P_Polarization_Diagram.svgPolar_angle_vs_time.pngRel_Intens_vs_time.png 
  107   Wed May 24 14:28:26 2023 PeterUpdateVLC ElectronicsLaser intensity/polarization drift measurementsI went in and took polarization drift data
for 16 hours. The run started at 6:08pm and
finished at 9:15am the next day. The four
 Time_Series_Trial_7_16hrs.pngPower_vs_Time_16hrs.pngPolar_angle_vs_time_16hrs.pngRel_Intens_vs_time_16hrs.png 
  116   Tue Jun 6 16:15:09 2023 PeterUpdateVLC UpdateLaunch Optics for Visible Light CavityI assembled the first few components of the
launch optics for the visible light cavity.
Below is an image of the current table configuration,
 IMG-0882.jpgIMG-0883.jpg 
  221   Thu Sep 7 19:24:25 2023 PeterUpdateVLC UpdateVLC Launch ChainThe launch optics up to the Faraday Isolator
have been added to the breadboard. In the
first image, the optics are (from L to R)
 IMG-3404(1).jpgIMG-3408(1).jpg 
  234   Mon Oct 9 11:06:17 2023 PeterUpdateVLC UpdateVLC Launch ChainImplemented the new stage for the EOM. Took
power data at different positions in the
launch chain. Beam waist: 0.066mm (beam waist
 IMG-3540.jpgIMG-3538.jpgIMG-3533.jpgIMG-3522.jpg 
  242   Mon Oct 23 07:28:57 2023 PeterUpdateVLC UpdateVLC Mode MatchingI have attached a pdf with slides of my latest
updates. 
 Carney_VLC_Update.pdf 
  256   Mon Nov 6 11:31:25 2023 PeterUpdateVLC UpdateVLC Mode MatchingSee Update Attached  VLC_Update_11_6_23.pdf 
  263   Mon Nov 13 06:15:45 2023 PeterUpdateVLC UpdateVLC Mode MatchingWeekly Updates Attached in pdf  VLC_Mode_Matching_3.pdf 
  288   Fri Dec 8 11:15:21 2023 PeterUpdateVLC UpdateVLC AssemblyThe optics of the visible light cavity have
been assembled. The mode matching telescope
is folded through the two stirring mirrors
 IMG_4194.jpgIMG_4195.jpgIMG_4197.jpgIMG_4196.jpg 
  304   Tue Jan 16 10:01:21 2024 PeterUpdateVLC UpdateVLC Faraday Isolator and Mode MatchingAttached is a PDF of my weekly updates.   VLC_Mode_Matching_Design_-_Remastered.pdf 
  321   Tue Feb 13 01:26:30 2024 PeterUpdateInterferometer SimulationsCARM Power SimulationsCao's simulations of the circulating power
and gouy phase through a single arm cavity
of the interferometer have been reproduced.
 Scenario_3_CARM.pdfScenario_3_CARM_Gouy.pdf 
  360   Mon Apr 15 11:51:03 2024 PeterUpdateVLC UpdateVLCAn update on the VLC project is attached below:  VLC_Update_April_15_2024.pdf 
  368   Mon May 13 14:53:29 2024 PeterUpdateVLC UpdateVLCVLC Update WEEK 7 attached below  VLC_Update.pdf 
  147   Thu Jul 6 13:34:48 2023 Pamella, Shane, Julian, AidenUpdateCleanroomcleaning and particle count



[Pamella,
Julian, Aiden, and Shane]


cleaning
cleanroom and particle count
  
  93   Mon May 8 12:00:03 2023 Pamella, Shane, JulianUpdateGeneralCleanroom particle counts and cleaning the cleanroom.[Pamella,Julian, Shane]


Today we
cleaned the clean-room (floor, surfaces)
and particle count.



10:00
  
  166   Wed Jul 19 14:39:19 2023 Pamella, Shane, AidenUpdateCleanroomcleaning and particle count



[Pamella,
Shane, Aiden]

cleaning cleanroom
and particle count
  
  79   Wed Apr 26 18:05:41 2023 Pamella, Julian, ShaneUpdateCleanroomcleanroom particle counts and cleaning log

 pre-cleaning particle counts:

  zone 3 
 
 0.3
mu: 2494

 0.5 mu: 748

 counts4_26_23.png 
  100   Wed May 17 12:18:08 2023 Pamella, Julian and Shane UpdateGeneralCleaning room and particle count[Pamella, Julian and Shane]



Particle
count: 
  10 am: Started particle count


 Zone 3 :

  
  109   Wed May 31 11:42:16 2023 Pamella, Julian and ShaneUpdateGeneralCleaning room and particle count[Pamella, Shane and Julian]


 Cleaning
room and particle count 


 09:58 am: Started the particle count
  
  131   Thu Jun 22 13:58:00 2023 Pamella, Julian and ShaneUpdateCleanroomCleaning and Particle Count


[Pamella,
Shane, and Julian]
cleaning cleanroom
and particle count



12:00
  
  129   Tue Jun 20 22:14:24 2023 Pamella, CaoInfrastructureVACShort term testing of vacuum heater controller units[Pamella, Cao]

 
 Fuse replacement


 Replace blown 10A fuse
in ucontroller outside cleanroom 
  
  34   Mon Feb 27 17:09:04 2023 Pamella UpdateGeneralVacuum Chamber CleaningPamella and Julian finished cleaning the interior
of the chamber, chamber lid, and the table.
We found some black residue on the side of
 Side_of_Table.jpegWipes_from_table.jpeg 
  35   Tue Feb 28 13:53:17 2023 PamellaUpdateGeneralVacuum chamber cleaning Pamella, Dr. Richardson and Dr.Cao finished
checking and cleaning the interior of the
chamber, chamber lid, and exterior of the
 EE5E0296-D362-4EA6-B482-85A629D93B46.jpeg4C0AA805-667E-45AD-8704-03389BD63489.jpeg51CE3D1E-F48E-4F57-8450-8F58C27154BB.jpeg58ADE656-52AD-4F0E-88BA-B993F977A519.jpeg 
  45   Mon Mar 6 18:48:43 2023 PamellaUpdateGeneralCleanroom update Today Pamella and Julian finished cleaning
of the new lab cabinets. Also we wiped the
computer and  put inside the cleanroom so
 203863E0-106A-465E-8D9C-461B0358FB60.jpeg779F360D-CAD0-4C49-AE0B-973F97F6D099.jpeg276B9F0C-6661-441F-AD34-D79DA61E1FC3.jpeg 
  46   Wed Mar 8 18:35:52 2023 PamellaUpdate Lab cleaning Today Pamella finished cleaning of the cleanroom,
starting with the HEPA vacuuming,  mopping
and clearing all floor with IPA wipes. 
Also
  
  57   Fri Mar 24 13:36:17 2023 PamellaUpdateGeneralClean and Bake batch 10Today I bagged and tagged batch 10.
 I wiped
the RGA vacuum component for around 25 minutes
after that I bagged and tagged this part
 260AEB73-02D0-4635-93B3-B2EB3269FB84.jpeg59FD199A-A444-439A-8D51-C242B65BBECD.jpeg9A48A0EE-5EFE-409D-ACC0-17011F6F7EBF.jpeg950F85B7-D304-4724-AB3D-B606E422F1E3.jpeg 
ELOG V3.1.3-7933898