ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 3 of 11  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Category Subject Text Attachments
  440   Mon Sep 16 13:51:23 2024 Luis MartinUpdateVACRGA Scans



   
    


 2024-09-11_PostBake1_ArO.png2024-09-13_PostBake1_ArO.png2024-09-16_PostBake1_ArO.png 
  439   Mon Sep 16 07:28:16 2024 LukeUpdateInterferometer SimulationsRing heater update   20240916_Ringheater_updates.pptx 
  438   Mon Sep 9 21:02:37 2024 LukeUpdateVACSteadystate temperature of flangesI measured the temperature of the flanges
and reconnected the RGA turning on its filament.
I then turned off the PID controllers.
  
  437   Mon Sep 9 14:27:36 2024 PooyanInfrastructureComputersChimay backup attemptOne ongoing work is to make all lab machines
automatically backed-up on Scribe on a daily
basis. The updates should be boatable and
  
  436   Mon Sep 9 12:36:45 2024 MichaelUpdateInterferometer SimulationsUpdate on Analysis of Mode Mismatch Minimization in A#I have taken a closer look at the solution
curve in the mirror parameter space which
I have searched, focusing on the "resilience"
 SRC_Mode_Mismatch_Update_9_9_24.pdf 
  435   Fri Sep 6 14:34:52 2024 Luke UpdateVACHeating tape workOn the 5th I had tried to start baking
the vacuum chamber however certain parts
of the chamber were getting too hot and causing
  
  434   Tue Sep 3 18:24:17 2024 TylerUpdateCDSCymac Timing Chassis Issue[Tyler, Jon]


The timing chassis used
for the cymac has been shut off due to an
unknown issue causing its supplied current
  
  433   Tue Sep 3 15:52:56 2024 LukeUpdateVACHeater tape initilization [Luke, Tyler, Jon]
On the 3rd we set up the pid controllers
for the heater tapes and after putting on
  
  432   Sun Sep 1 16:17:40 2024 LukeUpdateVACVacuum chamber leak checking and re-applying heating tape[Luke, Luis, Cinthia, Michal, Tyler]
On the 26th Cinthia, Michal, and
I took off the insolation on the vacuum chamber
  
  431   Thu Aug 29 16:39:34 2024 LukeUpdateVACPhotos of heater tape   6x 
  430   Tue Aug 27 18:37:40 2024 LukeUpdateInterferometer SimulationsRingheater model updateUpdated the model to produce a more circular
deformation in the HR surface. The first
three attachments are from irradiance patterns
 Initial_1W.pngIncreased_rays_100W.pngIncreased_rays_more_100W.pngInitial_100W.png 
  429   Tue Aug 27 15:01:26 2024 LukeUpdateVACRGA line leak testing[Luke, Tyler]
On the 27th Tyler and I ran the RGA
leak test again with the electron multiplier
  
  428   Mon Aug 26 14:42:04 2024 Cynthia UpdateInterferometer Simulationscurrent status on cavity scan with effects of FROSTII used the code and arm cavity model used
for previous O5 study on mirrors and HOM
(the pdf of the study and the result can
 LIGO_updates_8_26.pdf 
  427   Fri Aug 23 16:08:32 2024 LukeUpdateVACRGA line leak testing[Luke, Luis, Jon, Tyler]
On the 22nd Dr. Richardson showed
Luis, Tyler and I how to preform a leak test
  
  426   Mon Aug 19 07:11:55 2024 CynthiaUpdateInterferometer Simulationscavity scans with FROSTI effects    LIGO_update_8_19.pdf 
  425   Fri Aug 16 12:51:46 2024 Luis MartinUpdateVACUpdate on vacuum chamber status[Luis, Luke, Tyler]

Vacuum chamber parts were finally
received and assembled. After whipping down
 IMG_1910.HEICIMG_1911.HEICIMG_1909.HEICIMG_1912.HEIC 
  424   Mon Aug 12 17:09:04 2024 Cynthia UpdateInterferometer SimulationsO4 vs O5 cavity scans with ITM plume guess or ETMSo far the proposed solution for what to use
for O5 ITM mirror for SIS simulations is
either the plume guess file or using the
 O5_plots_and_tables.pdfO4_plots_and_tables.pdfETM12mapO5.pngScreenshot_2024-08-12_at_5.05.31_PM.png 
  423   Mon Aug 12 16:35:30 2024 Luke Update Ringheater modeling Update   HR_surface_deformation.pngIrradiation_pattern_input.pngHR_surface_deformation_other.png 
  422   Mon Aug 12 16:24:34 2024 TylerUpdateCleanroomRIN Measurement Update 1[Tyler]


For some preliminary tests,
I moved the IR photodetectors outside of
the cleanroom and onto the other optical
 Basic_setup.jpgRP.jpg 
  421   Tue Aug 6 13:07:07 2024 XuejunUpdateInterferometer Simulations [Xuejun]

 The width and location of
the measured in-air change in temperature
profile has been determined to be 0.045m
 Thermal_model_image.pnggenerated_irradiance_profile.png 
  Draft   Sun Aug 4 09:01:01 2024 MichaelUpdateInterferometer SimulationsUpdate on SRC Mode Mismatch AnalysisAn update on my analysis to minimize mode
mismatch/scattering by introducing toroidal
mirrors to the SRC.
 SRC_Mode_Mismatch_Update_8_2_24.pdfSRC_Mode_Mismatch_Update_8-12-24.pdf 
  419   Fri Aug 2 13:50:22 2024 ShaneUpdateCDSSerial Comm. Test (Agilent Turbo Pump)Did a brief communication test with the agilent
turbo pump today, to see if we could get
serial communications up and running for
 pinouts.jpeg 
  418   Tue Jul 30 07:42:47 2024 JonInfrastructureGeneralCable tray installed in 1119Yesterday I installed another 5' cable tray
in 1119, for permanently routing Ethernet
lines to the L-bench. It is securely bolted
 cable_tray_1119.jpg 
  417   Mon Jul 29 14:30:16 2024 TylerUpdateCleanroomRIN Measurement Set-up[Tyler]


I have begun moving parts
into the cleanroom for the upcoming FROSTI
RIN tests that will be conducted within the
 RIN_FROSTI.jpg 
  416   Mon Jul 29 13:39:16 2024 TylerUpdateDAQRTD Parameter Calibration[Tyler]


Using the data taken during
the FROSTI testing at Caltech, I attempted
to find a better calibration of the RTD sensors,
 RTD_Recal_params.pngRTD_recal_plots_fin.png 
  415   Mon Jul 29 12:23:10 2024 LiuUpdateInterferometer SimulationsUpdate on mechanical resonances of CE BS with stiffener ringUpdate on mechanical resonances of CE BS with
stiffener ring is attached. 
 eigen_freqs_merged.pdf 
  414   Mon Jul 29 12:20:56 2024 LiuUpdateInterferometer SimulationsUpdate on wavefront actuation with astigmatically driven RH for CEUpdate on wavefront actuation with astigmatically
driven RH for CE is attached. 
 SURF_nonastig_merged.pdf 
  413   Mon Jul 29 12:18:52 2024 LiuUpdateInterferometer SimulationsUpdate on FROSTI O5 ETM profile optimizationUpdate on FROSTI O5 ETM profile optimization
is attached. 
 pdf_merged.pdf 
  412   Fri Jul 26 17:25:42 2024 JonInfrastructureComputersNew workstation ws4 installed in 1129Today I installed the second desktop workstation
in 1129. The new machine is an Intel NUC13ANHi5,
with a 12-Core Intel i5-1340P CPU, 32GB DDR4
 ws4.jpg 
  411   Mon Jul 22 18:19:34 2024 LukeUpdateVACZero length reducer stuck boltsToday, I borrowed a bolt extractor drill
bit from the machine shop to remove some
stuck bolts from the zlr. Before starting,
 image_2024-07-22_181607501.pngimage_2024-07-22_181632965.png 
  410   Tue Jul 16 18:43:07 2024 ShaneUpdateCDSADC-DAC loopback testing and IOLAN installation
UPDATE: 
Follow up ADC-DAC loopback testing
now complete, matching all the ADC channels
to a single DAC channel, and then matching
 Follow-up_ADC-DAC_Loopback_Testing.xlsx 
  409   Mon Jul 15 15:52:40 2024 MichaelUpdateInterferometer SimulationsaLIGO locking with varying SRC mirrors and measuring mode mismatch   SRC_Astigmatism_Analysis_7_15_24.pdf 
  408   Mon Jul 15 15:44:52 2024 Cynthia UpdateInterferometer Simulationsperformed cavity scans with thermal effects and ring heater   cavity_scan_07_15.pdf 
  407   Mon Jul 15 14:49:06 2024 PooyanUpdateComputersSynology NAS server setupInstalled a Synology NAS server (Synology
RackStation RS1221) in lab room 1129, with
host name “scribe” and ip “192.168.1.17”.
  
  406   Mon Jul 15 14:28:32 2024 PooyanUpdateInterferometer SimulationsaLIGO test mass surface profiles Created a Google Slides presentation to
summarize all the mirror surface map information
that we use for simulating interferometers. 
  
  405   Mon Jul 15 13:30:49 2024 Luke UpdateVACProblem with 2.75" to 1.33" zero length reducer Last Friday while checking the depth of the
ZLR I got one of the screws stuck. Today
I tried a couple things to get it out. First
 IMG_1882.jpg 
  404   Mon Jul 15 09:36:44 2024 LiuUpdateInterferometer SimulationsETM Profile Optimization for FROSTI This is to optimize the FROSTI heating
profile for ETM, by minimizing the residual
RMSE of the HR surface deformation after
 pdf_merged.pdf 
  403   Sat Jul 13 15:09:04 2024 LukeUpdateGeneralRing heater COMSL model updateAfter the feedback from last meeting and
Liu's help narrowing down what I should do
to improve the model. I made some changes:
 image_2024-07-13_150654436.pngimage_2024-07-13_150704735.pngimage_2024-07-13_150716079.pngimage_2024-07-13_150726593.png 
  402   Thu Jul 11 21:01:37 2024 JonInfrastructureGeneralCable tray installed in 1129Today I installed a 10' cable tray in 1129,
for permanently routing Ethernet lines to
the workstations. It is securely bolted to
 IMG_1395.pngIMG_1396.png 
  401   Thu Jul 11 15:53:39 2024 LukeUpdateVACRGA line upgrade [ Luke, Jon ]
Started work at 11:00
As mentioned in my previous post
 image_2024-07-11_154630323.pngimage_2024-07-11_154818191.pngimage_2024-07-11_154902840.png 
  400   Wed Jul 10 17:31:07 2024 LukeUpdateVACRGA line disassembly and upgrade [ Luke, Cynthia, Michael, Xuesi, Anthony
]
Started work around 12:45
 image_2024-07-10_172112210.pngimage_2024-07-10_172431863.pngimage_2024-07-10_172603090.pngimage_2024-07-10_172823966.png 
  399   Tue Jul 9 18:19:50 2024 ShaneUpdateCDSADC-DAC loopback testing and IOLAN installation[Shane, Jon]

Finished ADC-DAC loopback
testing today (see attached xlsx file or
access directly here).
 iolanServerTerminal.jpegADC-DAC_Loopback_Testing.xlsxupdatedc1msc.jpeg 
  398   Mon Jul 8 17:01:45 2024 ShaneUpdateCDSNew CyMAC internal layout[Jon, Shane]

Internal layout of CyMAC has
been updated (labeled image attached) to
accommodate the replacement of the two ribbon
 updated_cymac.jpeg 
  397   Mon Jul 8 12:26:10 2024 MichaelUpdateInterferometer SimulationsMinimizing Astigmatic Effects in the SRC of LIGOThis is the first look and analysis of the
effects of astigmatism in the aLIGO optical
layout which can lead to mode mismatch and
  
  396   Mon Jul 8 10:39:14 2024 XuejunUpdateFLIRAverage Temperature Profile After taking data for each of the individual
heater elements, I imported them into python
and overlayed them to produce an average
 Average-Temperature-Profile.pdf 
  395   Fri Jul 5 14:23:13 2024 LiuUpdateInterferometer SimulationsEngineering drawings for straight edge heater element designs for FROSTIStep files and engineering drawings for the
straight edge heater element designs have
been created in COMSOL and SolidWorks. They
  
  394   Fri Jul 5 14:12:32 2024 LiuUpdateInterferometer SimulationsCE BS Mechanical ResonancesThe butterfly and drumhead mechanical modes
for the aLIGO BS were calculated in COMSOL.
The resonant frequencies for the two acoustic
 butterfly.pngdrumhead.png 
  393   Fri Jul 5 13:17:44 2024 LiuUpdateInterferometer SimulationsFour-quadrant FROSTI-like RH for astigmatic thermal actuation for CE opticsIn the CE corner layout design and down selection
study, interferometer layouts with large
incidence angles on some of the curved optics
 7x 
  392   Mon Jul 1 15:19:42 2024 Cynthia UpdateInterferometer SimulationsO4 and O5 mirror cavity scans with thermal effect   cavityScan_07_01.pdf 
  391   Mon Jul 1 11:45:45 2024 SidUpdateInterferometer Simulations Progress update: Most of last week was spent
getting set up with SIS, and learning how
to do basic simulations. The goal for this
  
ELOG V3.1.3-7933898