ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 3 of 13  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Category Subject Text Attachments
  527   Thu Feb 27 18:22:21 2025 ShaneUpdateCDSOngoing work in server rack and desk area (1119)As part of the vacuum communications debugging
process, there is ongoing work in the server
rack and desk area in 1119. Please be careful
  
  526   Tue Feb 25 10:56:25 2025 CynthiaUpdateInterferometer Simulationsmirror coating added for simulation rerunI have tried to rerun the simulation on finesse
after adding the mirror coating. The result
has a large fluctuation in required input
 updats_(3).pdf 
  525   Tue Feb 25 10:02:32 2025 Xuesi MaUpdate  1424039912.625576 2025/02/19 22:38:14 UTC Time
start
24V 2.8A right after start all 8
 resistance_vs_time_all_channels_all_time.pdftemperature_vs_time_all_channels_all_time.pdfresistance_vs_time_rise_time.pdfresistance_vs_time_fall_time.pdf 
  523   Tue Feb 25 01:37:00 2025 MichaelUpdateInterferometer SimulationsUpdates and Current Next Steps for Toroidal Mirrors ProjectSince the previous discussion of this project,
I've worked on building finesse models to
verify mathematical results which model the
  
  522   Mon Feb 24 17:50:13 2025 LuisUpdateVACRGA Scan [Ma, Luis]
    February 24, 2025 - 1:00PM

    Ma performed an RGA scan with
 2025-2-24_HeaterElement_ArO.png 
  521   Sun Feb 23 16:00:07 2025 Luke UpdateScripts/ProgramsRingheater modeling UpdateThese are some plots:
The first shows the convergence of
the 02 mode reducing the size of the mesh.
 mesh_convergence.pngnumerical_error_in_innerproduct_of_zernike_basis_elemets.png 
  520   Sun Feb 23 12:11:43 2025 Luke SummaryCleanroomCleanroom cleaning[Luke, Mary, Luis]
Particle Count Measurements:

Pre-cleaning (8:40
 partical_count_2-21-25.png 
  519   Thu Feb 20 17:07:36 2025 LuisUpdateVACRGA Scan [Ma, Luis]
    February 20, 2025 - 3:30
PM
 2025-2-20_HeaterElement_ArO.png 
  518   Wed Feb 19 13:44:48 2025 ShaneUpdateCDSVac serial interfacing update


[Jon, Shane]



Debugging update for vac system serial
communications: we were able to successfully
  
  517   Tue Feb 18 11:19:13 2025 Luke ConfigurationVACRepositioning of the lid's temperature probeBefore the recent bake I slightly repositioned
the temperature probe on the lid from beside
the heater tape to under the heater tape.
  
  516   Tue Feb 18 10:12:39 2025 TylerUpdateTCSFinal RIN Plot Update
Below is a preview of the final RIN figure
that will be included in the FROSTI instrument
paper. A quick summary of what is shown below:
 Preliminary_RIN_plot.pdfFROSTI_ON.pdfDark_Noise.pdfADC_Noise.pdf 
  515   Tue Feb 18 10:02:16 2025 Xuesi MaUpdate Group Meeting Slides 2/18/2025https://docs.google.com/presentation/d/1WiV2VqS0BzXNCK6VYYQ-Ty8xlHnzXatQaFbMf1-0rsY/edit?usp=sharing   
  514   Tue Feb 18 10:01:07 2025 Xuesi MaUpdate  [Ma, Pooyan, Tyler]
On Friday, we connected the vacuum
chamber with the Cymac.
 IMG_7916.jpegIMG_7915.jpegIMG_7917.jpeg 
  513   Sun Feb 16 16:45:18 2025 Luke UpdateGeneralRingheater position optimization Over the last couple weeks I have been
working on finding the optimal position of
the ringheater's thermal profile. 
 02.png_40.png_4-4.png02_40_4-4.png 
  512   Fri Feb 14 12:15:23 2025 LuisUpdateVACVacuum sytem staus
    [Luis, Luke, Ma]
    February 12, 2025 - 4:00
PM
 2025-2-12_HeaterElement-Bake1_ArC.png2025-2-12_HeaterElement-Bake1_ArO.png 
  511   Fri Feb 14 11:57:50 2025 LuisUpdateVACVacuum Update[Luis]
        Feb/11/25 9:30am

        Pressure gages were connected.
  
  510   Tue Feb 11 08:07:02 2025 LuisUpdateVACBake stopped [Luis, Ma]
        Feb/10/25 4:00pm

        Bake was stopped.
  
  509   Fri Feb 7 12:25:56 2025 Luke SummaryVACStarted bake[Luke, Luis]
The
vacuum chamber is currently baking. 
  
  508   Mon Feb 3 13:17:21 2025 Xuesi MaUpdate  [Ma]
changed all zip ties to peek zip
ties, and grouped wires together. The setup
 20250203_123153.jpg20250203_123213.jpg 
  507   Sat Feb 1 17:25:52 2025 Luke SummaryGeneralCleanroom cleaning[Luke, Cece, Luis]
Particle Count Measurements:

Pre-cleaning (12:15
 20250131_particalcount.png 
  506   Fri Jan 31 15:03:09 2025 Xuesi MaUpdate Heater Element Circuit Check
        table {
            width:
100%;
            border-collapse: collapse;
/* Merges borders into a single line */
  
  505   Tue Jan 28 13:30:46 2025 shaneUpdateCDSSerial comms testing updateAttempted to communicate with the smaller
vac pump (TwissTor 74) via Agilent software
today. Was able to communicate with the pump
  
  504   Mon Jan 27 23:35:28 2025 Xuesi MaUpdate  [Ma]
Installed all the pins to the peek
DB 25 connectors
 20250127_142647.jpg20250127_153454.jpg20250127_154516.jpg 
  503   Mon Jan 27 11:29:38 2025 Xuesi MaUpdate Heater Element Test[Ma, Cece, Luke, Mary, Shane]

On Friday (Jan 24), we installed
the heater elements on the stand. The heater
 20250124_165434.png20250124_165342.png20250214_132811.jpg 
  502   Sat Jan 25 18:19:39 2025 Luke UpdateGeneralRingheater modeling UpdateHere
is a quick update on some of the things I
have been working on regarding my project. 
  
  501   Wed Jan 22 10:50:08 2025 TylerUpdateTCSFROSTI Disassembly[Tyler, Ma, Cece, Luis, Shane, Luke, Cynthia,
Liu, Jon]

On Tuesday (Jan 21), we took
the FROSTI apart in front of a filming crew.
 IMG_1843.pngIMG_1844.pngIMG_1849.pngIMG_1850.png 
  500   Tue Jan 21 10:12:02 2025 Luke SummaryGeneralFrosti toy model [Luke, Liu]
Over the winter break I have been
working on this
  
  499   Fri Jan 17 13:27:07 2025 TylerUpdateTCSFROSTI Pre-disassembly[Tyler, Ma, Cece, Jon, Luke, Cynthia, Michael]

On
Tuesday, we prepared the FROSTI for disassembly
in anticipation of the APS filming that is
 IMG_1828.jpegIMG_1830.jpeg 
  498   Tue Jan 14 10:27:14 2025 TylerUpdateTCSRIN Updates[Tyler]


Attached below are updated
plots for the FROSTI RIN measurements for
Jan 14 group meeting.
 ASD_plots_01_14_2025.pdf 
  497   Wed Jan 8 17:35:57 2025 Luke SummaryCleanroomCleanroom cleaning[Luke, Tyler, Cynthia, Shane, Michael]
Summary of Cleaning Activities:
We began cleaning Room 1119 at 2:00
 partical_count_250108.png 
  496   Thu Jan 2 17:52:58 2025 LuisUpdateVACMR Testing Continuation [Luis, Luke]
        RGA Volume:
T = 22°C, P = 2.10e-9 Torr
        Main Volume:
 2024-12-16_PostBake2_ArO_overlay.png2025-1-2_MR-Bake1_ArO.png2025-1-2_MR-Bake1_ArC_overlay.png 
  495   Mon Dec 23 14:33:36 2024 TylerUpdateTCSLatest RIN Measurement ResultsAttached below are the measurements I took
from the FROSTI from 12/18-12/22.
 Updated_ASD_plots.pdfDark_Noise_Thermal_ASD_plots.pdfDC_Voltages.pdfRP-2.jpg 
  494   Sun Dec 22 20:43:35 2024 LuisUpdateVACMR Testing[Luis, Luke]
        RGA Volume:
T = 23°C, P = 3.0e-9 Torr
        Main Volume:
 2024-12-13_PostBake2_ArO_Degas_overlay.png2024-12-22_MR-Bake1_ArO.png 
  493   Thu Dec 19 12:00:44 2024 LukeUpdateVACEnd of bakeThe
vacuum chamber has stopped baking. 
Current state as of 11:40, 12/19/2024:
  
  492   Wed Dec 18 15:41:56 2024 TylerUpdateTCSFROSTI RIN[Tyler]


I have begun the (hopefully)
final RIN measurements at 3:30 PM today.
If you need to go into the cleanroom at any
  
  491   Tue Dec 17 13:53:53 2024 LuisUpdateVACVacuum system status [Luis]

 The vacuum system is being
baked. I disconnected the digital gages and
the magnets, opened the Ar leak and started
  
  490   Mon Dec 16 21:32:21 2024 LuisUpdateVACMR Testing[Luis, Luke]

The MR material was
placed in the vacuum chamber following standard
procedures to ensure the vacuum remained
 IMG_6011.HEIC 
  489   Sat Dec 14 07:58:25 2024 LuisUpdateVACVacuum sytem staus and Viton O-rings  [Luis]
        RGA Volume:
T = 23°C, P = 1.71e-9 Torr
        Main Volume:
 2024-12-12_PostBake2_ArO_overlay.png 
  488   Thu Dec 12 13:06:39 2024 LuisUpdateVACRGA Scan and vacuum system updates    [Luis, Luke]
    
        RGA Volume:
T = 21°C, P = 1.74e-9 Torr
 2024-12-12_PostBake2_ArC.png2024-12-12_PostBake2_ArO_overlay.png 
  487   Wed Dec 11 16:06:05 2024 LuisUpdateVACRGA Status[Luis]

 I rebooted Spica and I
was able to connect the RGA again. After
Connecting the RGA, I left the filament on.
  
  486   Wed Dec 11 13:39:30 2024 TylerUpdateElectronicsRIN Update 12/11/2024[Tyler]


Attached below are updated
ASD plots for the FROSTI RIN measurements.
The parameters set for this are the following:
 Updated_ASD_plots.pdf 
  485   Thu Dec 5 10:31:13 2024 Luis UpdateVACRGA Scan and RGA updates



   
    


 2024-12-04_PostBake2_ArO.png 
  484   Wed Dec 4 16:01:23 2024 ShaneUpdateCDSVac serial interfacing troubleshooting updateUpdate on the issue with serial interfacing
for the TV 551 turbo pump: Tried a new test
today, to see if the commands being sent
  
  483   Mon Dec 2 13:35:45 2024 Luke UpdateGeneralClean and bake of Viton O-rings[Luke, Luis]
We couldn't access the bake log on
the wiki. (see attached) So we looked in
 image_(2).png 
  482   Mon Dec 2 00:11:23 2024 MichaelUpdateInterferometer SimulationsStatus Update on Toroidal Mirrors Project WorkAs it has been significant time from my last
update on this project, I compiled a few
notes about what I have been working on,
  
  481   Sat Nov 30 12:41:42 2024 LukeUpdateVACVacuum bake endThe
vacuum chamber has stopped bakeing. 
Current state as of 12:10, 11/30/2024:
  
  480   Wed Nov 27 16:23:58 2024 Luke UpdateVACStarted bake[Luke, Luis]
The
vacuum chamber is currently baking. 
  
  479   Wed Nov 27 13:48:01 2024 TylerUpdateElectronicsRIN Update[Tyler]

 
I downgraded the Red Pitaya
back to OS 2.00-18 due to runtime errors
during measurement. Once I did this, the
 New_ASD_plots.pdf 
  478   Wed Nov 27 12:27:45 2024 Luke SummaryVACSummary of vacuum work[Luke, Luis]
Update of current state of vacuum
chamber
 2024-11-27_PostBake1_ArO.png 
  477   Wed Nov 20 12:59:37 2024 TylerUpdateElectronicsRIN UpdateI went ahead and compared the noise spectrum
of the ADC to those of the photodetectors
with the FROSTI on and off. As discussed
 ASD_plots.pdf 
ELOG V3.1.3-7933898