Wed Nov 20 12:59:37 2024, Tyler, Update, Electronics, RIN Update
|
Wed Nov 20 12:31:24 2024, Luis, Update, VAC, Leak test RGA Scan after vacuum repairs
|
Tue Nov 19 17:10:34 2024, Luke , Update, VAC, Leak check
|
Thu Nov 14 11:58:05 2024, Shane, Update, CDS, Turbo pump connection troubleshooting
|
Thu Nov 14 10:46:20 2024, Luke , Summary, Cleanroom, Cleanroom cleaning
|
Wed Nov 13 14:06:00 2024, Luke , Update, General,
|
Wed Nov 13 14:03:32 2024, Tyler, Update, Electronics, RIN Update
|
Wed Nov 6 13:48:55 2024, Liu, Update, Interferometer Simulations, QN modeling update
|
Tue Nov 5 11:08:40 2024, Luis Martin, Update, VAC, ISO Test
|
Tue Nov 5 09:56:04 2024, Luis Martin, Update, Clean & Bake, MR Bake
|
Tue Oct 29 16:37:35 2024, Tyler, Update, Electronics, Red Pitaya OS Update
|
Fri Oct 25 10:56:30 2024, Shane, Update, CDS, Timing Chassis fixed and reinstalled
|
Wed Oct 23 12:33:54 2024, Luke , Update, , Zernike calculation update
|
Wed Oct 23 12:08:36 2024, Luis Martin, Update, VAC, RGA Scan
|
Wed Oct 23 11:48:06 2024, Luis Martin, Update, VAC, Leak Test Results
|
Thu Oct 17 13:24:23 2024, Shane, Update, CDS, Timing Chassis issue identified
|
Wed Oct 16 14:13:31 2024, Liu, Update, , FROSTI with non uniform absorption scattering sources
|
Wed Oct 16 13:58:59 2024, Luis Martin, Update, VAC, RGA Scan
|
Tue Oct 15 15:27:38 2024, Xuesi Ma, Update, ELOG, Timing Chassis Update 12x
|
Wed Oct 9 13:52:31 2024, Tyler, Update, TCS, RIN Update 10/09/2024
|
Thu Oct 3 19:35:04 2024, Shane, Update, Cleanroom, Cleanroom cleaning and particle count
|
Wed Oct 2 14:49:59 2024, Liu, Update, , FROSTI ETM actuation
|
Wed Oct 2 13:38:00 2024, Cynthia, Update, Interferometer Simulations, cavity scan with averaged O4 ETM coating as plume
|
Wed Oct 2 12:20:43 2024, Tyler, Update, TCS, Updated FROSTI Analysis 10/02/2024
|
Wed Oct 2 12:05:42 2024, Luke , Update, , Ringheater modeling Update
|
Wed Oct 2 10:31:46 2024, Xuesi Ma, Configuration, , Group Meeting Slides 10/2/2024
|
Tue Oct 1 19:41:23 2024, Shane, Update, CDS, CyMAC Timing Chassis Issue
|
Wed Sep 25 09:06:09 2024, Luis Martin, Update, VAC, RGA Scans
|
Mon Sep 23 15:11:21 2024, Tyler, Update, Scripts/Programs, Effective Emissivity Analysis and RIN Update
|
Mon Sep 23 15:00:41 2024, Cynthia , Update, Interferometer Simulations, corrections on assumption for O5 coating
|
Mon Sep 23 08:29:49 2024, Luke, Update, Interferometer Simulations, Ringheater update
|
Mon Sep 16 15:18:59 2024, Cynthia , Update, Interferometer Simulations, a breakdown of FROSTI and thermal effects and the resulting cavity scan
|
Mon Sep 16 14:59:51 2024, Tyler, Update, TCS, FLIR RIN Update 09/16
|
Mon Sep 16 13:51:23 2024, Luis Martin, Update, VAC, RGA Scans
|
Mon Sep 16 07:28:16 2024, Luke, Update, Interferometer Simulations, Ring heater update
|
Mon Sep 9 21:02:37 2024, Luke, Update, VAC, Steadystate temperature of flanges
|
Mon Sep 9 14:27:36 2024, Pooyan, Infrastructure, Computers, Chimay backup attempt
|
Mon Sep 9 12:36:45 2024, Michael, Update, Interferometer Simulations, Update on Analysis of Mode Mismatch Minimization in A#
|
Fri Sep 6 14:34:52 2024, Luke , Update, VAC, Heating tape work
|
Tue Sep 3 18:24:17 2024, Tyler, Update, CDS, Cymac Timing Chassis Issue
|
Tue Sep 3 15:52:56 2024, Luke, Update, VAC, Heater tape initilization
|
Sun Sep 1 16:17:40 2024, Luke, Update, VAC, Vacuum chamber leak checking and re-applying heating tape
|
Thu Aug 29 16:39:34 2024, Luke, Update, VAC, Photos of heater tape 6x
|
Tue Aug 27 18:37:40 2024, Luke, Update, Interferometer Simulations, Ringheater model update
|
Tue Aug 27 15:01:26 2024, Luke, Update, VAC, RGA line leak testing
|
Mon Aug 26 14:42:04 2024, Cynthia , Update, Interferometer Simulations, current status on cavity scan with effects of FROSTI
|
Fri Aug 23 16:08:32 2024, Luke, Update, VAC, RGA line leak testing
|
Mon Aug 19 07:11:55 2024, Cynthia, Update, Interferometer Simulations, cavity scans with FROSTI effects
|
Fri Aug 16 12:51:46 2024, Luis Martin, Update, VAC, Update on vacuum chamber status
|
Mon Aug 12 17:09:04 2024, Cynthia , Update, Interferometer Simulations, O4 vs O5 cavity scans with ITM plume guess or ETM
|
Mon Aug 12 16:35:30 2024, Luke , Update, , Ringheater modeling Update
| +
Mon Aug 12 16:24:34 2024, Tyler, Update, Cleanroom, RIN Measurement Update 1
|
Tue Aug 6 13:07:07 2024, Xuejun, Update, Interferometer Simulations,
|
Sun Aug 4 09:01:01 2024, Michael, Update, Interferometer Simulations, Update on SRC Mode Mismatch Analysis
|
Fri Aug 2 13:50:22 2024, Shane, Update, CDS, Serial Comm. Test (Agilent Turbo Pump)
| +
Tue Jul 30 07:42:47 2024, Jon, Infrastructure, General, Cable tray installed in 1119
| +
Mon Jul 29 13:39:16 2024, Tyler, Update, DAQ, RTD Parameter Calibration
|
Mon Jul 29 12:23:10 2024, Liu, Update, Interferometer Simulations, Update on mechanical resonances of CE BS with stiffener ring
|
Mon Jul 29 12:20:56 2024, Liu, Update, Interferometer Simulations, Update on wavefront actuation with astigmatically driven RH for CE
|
Mon Jul 29 12:18:52 2024, Liu, Update, Interferometer Simulations, Update on FROSTI O5 ETM profile optimization
|
Fri Jul 26 17:25:42 2024, Jon, Infrastructure, Computers, New workstation ws4 installed in 1129
|
Mon Jul 22 18:19:34 2024, Luke, Update, VAC, Zero length reducer stuck bolts
| +
Tue Jul 16 18:43:07 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation
|
Mon Jul 15 15:52:40 2024, Michael, Update, Interferometer Simulations, aLIGO locking with varying SRC mirrors and measuring mode mismatch
|
Mon Jul 15 15:44:52 2024, Cynthia , Update, Interferometer Simulations, performed cavity scans with thermal effects and ring heater
|
Mon Jul 15 14:49:06 2024, Pooyan, Update, Computers, Synology NAS server setup
|
Mon Jul 15 14:28:32 2024, Pooyan, Update, Interferometer Simulations, aLIGO test mass surface profiles
|
Mon Jul 15 13:30:49 2024, Luke , Update, VAC, Problem with 2.75" to 1.33" zero length reducer
|
Mon Jul 15 09:36:44 2024, Liu, Update, Interferometer Simulations, ETM Profile Optimization for FROSTI
|
Sat Jul 13 15:09:04 2024, Luke, Update, General, Ring heater COMSL model update
|
Thu Jul 11 15:53:39 2024, Luke, Update, VAC, RGA line upgrade
|
Wed Jul 10 17:31:07 2024, Luke, Update, VAC, RGA line disassembly and upgrade
|
Mon Jul 8 17:01:45 2024, Shane, Update, CDS, New CyMAC internal layout
|
Mon Jul 8 12:26:10 2024, Michael, Update, Interferometer Simulations, Minimizing Astigmatic Effects in the SRC of LIGO
|
Mon Jul 8 10:39:14 2024, Xuejun, Update, FLIR, Average Temperature Profile
|
Fri Jul 5 14:23:13 2024, Liu, Update, Interferometer Simulations, Engineering drawings for straight edge heater element designs for FROSTI
|
Fri Jul 5 14:12:32 2024, Liu, Update, Interferometer Simulations, CE BS Mechanical Resonances
|
Fri Jul 5 13:17:44 2024, Liu, Update, Interferometer Simulations, Four-quadrant FROSTI-like RH for astigmatic thermal actuation for CE optics 7x
|
Mon Jul 1 15:19:42 2024, Cynthia , Update, Interferometer Simulations, O4 and O5 mirror cavity scans with thermal effect
|
Mon Jul 1 11:45:45 2024, Sid, Update, Interferometer Simulations,
|
Fri Jun 28 18:15:16 2024, Luke, Update, VAC, Vacuum chamber
|
Fri Jun 28 10:43:13 2024, Xuejun, Update, Cleanroom, Frosti
|
Thu Jun 27 13:42:02 2024, Shane, Update, Cleanroom, cleanroom 5 zone particle count measurement
|
Thu Jun 27 11:09:14 2024, Liu, Update, Scripts/Programs, Straight edge STEP files and ray loss analysis
|
Wed Jun 26 16:39:34 2024, Luke, Update, VAC, Vacuum chamber leak checking
| +
Wed Jun 26 15:33:41 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129
|
Tue Jun 25 17:19:42 2024, Luke, Update, VAC, Vacuum chamber leak checking
|
Tue Jun 25 12:34:18 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count
|
Mon Jun 24 21:38:25 2024, Pooyan, Infrastructure, Computers, Computer server changes in 1119 and 1129
|
Mon Jun 24 14:28:51 2024, Cynthia , Update, Interferometer Simulations, SIS cavity with thermal effect
|
Fri Jun 21 11:47:30 2024, Liu, Update, Scripts/Programs, COMSOL simulation on alternative straightened heater elements design 6x
|
Wed Jun 19 18:45:14 2024, Luke, Update, , Vacuum chamber reassembly
|
Mon Jun 17 11:47:46 2024, Liu, Infrastructure, General, Temporary cooling units for the labs
|
Fri Jun 14 13:32:13 2024, Liu, Update, Scripts/Programs, COMSOL simulation on rectangular heater elements design 6x
| +
Mon Jun 10 14:52:38 2024, Tyler, Update, FLIR, CIT FROSTI Analysis Update
|
Mon Jun 3 14:59:44 2024, Cynthia, Update, Interferometer Simulations, Created cavity scan with LG modes
|
Mon Jun 3 09:24:48 2024, Aiden, Update, VAC, Vacuum Chamber Rendering
|
Fri May 31 19:37:47 2024, Luke, Update, , Vacuum chamber Disassembly
|
Thu May 16 15:23:14 2024, Shane, Update, Cleanroom, Cleanroom cleaning and particle count
|
Mon May 13 14:53:29 2024, Peter, Update, VLC Update, VLC
|
Mon May 13 14:48:27 2024, Aiden, Update, VAC, New Vacuum Chamber Design
|
Mon May 13 13:03:41 2024, Tyler, Update, FLIR, Readout Code Updates
|
Tue May 7 20:34:31 2024, shane, Update, CDS, frosti MEDM screen update
|
Thu May 2 22:43:36 2024, Tyler, Update, Electronics, RTD Readout Chassis Redesign
|
Mon Apr 22 15:06:33 2024, Cynthia , Update, Interferometer Simulations, cavity scan update
|
Wed Apr 17 15:07:04 2024, Shane, Update, Cleanroom, Cleanroom cleaning and particle count
|
Mon Apr 15 15:25:10 2024, Cynthia, Update, Interferometer Simulations, progress on simulation so far
|
Mon Apr 15 11:51:03 2024, Peter, Update, VLC Update, VLC
|
Mon Apr 8 14:57:41 2024, Cynthia, Pooyan, Update, Interferometer Simulations, performed cavity scans for O4 O5, and coupled cavity
|
Mon Apr 8 14:43:29 2024, Pooyan, Update, Interferometer Simulations, SIS update single and coupled cavities
|
Sun Apr 7 13:42:51 2024, Michael, Update, Interferometer Simulations, Update on status of gtrace project
|
Wed Mar 27 00:03:57 2024, Pooyan, Update, Computers, Chimay relocation to Physics 1129
|
Sun Mar 24 11:50:37 2024, Aiden, Update, Clean & Bake, Cal Tech FROSTI Parts
|
Sun Mar 24 11:49:27 2024, Aiden, Update, General, FROSTI RGA Scan
|
Tue Mar 19 15:22:27 2024, Aiden, Update, Clean & Bake, FROSTI Legs Clean and Bake
|
Tue Mar 19 10:55:30 2024, Tyler, Update, FLIR, In-Air Optical Test
|
Fri Mar 15 16:58:55 2024, Aiden, Update, VAC, Vacuum Chamber Frosti Testing
|
Wed Mar 6 09:57:52 2024, Tyler, Update, TCS, FROSTI Wiring
|
Thu Feb 29 17:16:48 2024, Shane, Update, CDS, MEDM screen for FROSTI T/P readouts
| +
Wed Feb 28 17:49:18 2024, Tyler, Update, TCS, FROSTI Assembly - Days 2-3
| +
Wed Feb 28 12:02:08 2024, Tyler, Update, General, Resistors for Heater Elements Update
|
Tue Feb 27 09:06:29 2024, Cynthia , Update, Interferometer Simulations, cavity scan with higher order input laser
|
Tue Feb 27 03:26:28 2024, Michael, Update, Interferometer Simulations, Reverse aLIGO Layout Created in Gtrace
|
Mon Feb 26 15:15:39 2024, Aiden, Update, General, Vacuum Chamber Baking Update
|
Sat Feb 24 08:53:38 2024, Jon, Infrastructure, Computers, Matlab upgraded to 2023b on Chimay
|
Fri Feb 23 18:03:27 2024, Tyler, Update, FLIR, Optical Test Setup in Cleanroom
|
Fri Feb 23 15:01:48 2024, Shane, Update, CDS, Latest draft of MEDM screen for FROSTI readouts
|
Thu Feb 22 21:48:16 2024, Jon, Update, VAC, Vacuum vent for RGA testing of reflector
|
Wed Feb 21 23:15:07 2024, Michael, Update, Interferometer Simulations, Long Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in Beamsplitter
|
Wed Feb 21 11:58:30 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count
|
Tue Feb 20 18:08:24 2024, Aiden, Update, General, Degassing the RGA
|
Tue Feb 20 11:31:49 2024, Tyler, Update, Cleanroom, Garment Cabinet Door Replacement
| +
Tue Feb 20 08:01:30 2024, Jon, Infrastructure, General, Power and network equipment installed in 1129 rack
|
Mon Feb 19 14:40:21 2024, Shane, Update, CDS, MEDM screen for FROSTI temp readouts
|
Mon Feb 19 14:17:50 2024, Aiden, Update, VAC, Heater Element RGA Scan
|
Fri Feb 16 18:37:28 2024, Jon, Update, VAC, Bake ended 6:23 pm
|
Tue Feb 13 13:02:41 2024, Pooyan, Update, Interferometer Simulations, Cacity sacn of Fabry-Perot
|
Tue Feb 13 12:34:04 2024, Aiden, Update, VAC, VAC Heating System Update
|
Tue Feb 13 12:26:23 2024, Tyler, Update, Interferometer Simulations, BS Code Update
|
Tue Feb 13 11:54:45 2024, Tyler, Configuration, FLIR, In-Air Optical Test Configuration
|
Tue Feb 13 04:05:32 2024, Michael, Update, Interferometer Simulations, Shoelaces 1 Layout Simulated in GTrace
|
Tue Feb 13 01:26:30 2024, Peter, Update, Interferometer Simulations, CARM Power Simulations
|
Mon Feb 12 17:35:47 2024, Aiden, Update, VAC, Heater Element RGA Scan
|
Thu Feb 8 17:37:48 2024, Aiden, Update, VAC, Heater Element RGA Scan
|
Wed Feb 7 12:43:22 2024, shane, Update, Cleanroom, cleanroom particle counts (full 5 zone measurement)
|
Tue Feb 6 22:40:25 2024, Michael, Update, Scripts/Programs, Long Crab 1 Design Created In Gtrace
|
Mon Feb 5 14:17:52 2024, Aiden, Update, VAC, Heater Element RGA Scan
|
Fri Feb 2 19:18:24 2024, shane, Update, Cleanroom, cleanroom cleaning and particle count
|
Fri Feb 2 19:08:20 2024, Aiden, Update, VAC, 1st Hot Element RGA Scan
|
Fri Feb 2 16:56:56 2024, Jon, Update, CDS, RTS model implemented for FROSTI RTD readouts
|
Wed Jan 31 14:37:26 2024, Shane, Summary, CDS, path directions for CyMAC model and parts library
| +
Tue Jan 30 11:36:19 2024, Tyler, Update, Electronics, RTD Chassis
|
Thu Jan 18 18:06:49 2024, shane, Update, Cleanroom, cleanroom 5 zone particle count measurement
|
Thu Jan 18 15:13:37 2024, Aiden, Update, VAC, VAC Heating System Update
|
Tue Jan 16 16:11:41 2024, Aiden, Update, VAC,
| +
Tue Jan 16 12:20:21 2024, Tyler, Configuration, Electronics, RTD Readout Chassis Update 2
|
Tue Jan 16 10:01:21 2024, Peter, Update, VLC Update, VLC Faraday Isolator and Mode Matching
|
Wed Jan 10 15:27:18 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count
|
Tue Jan 9 16:35:09 2024, Aiden, Update, VAC, VAC System Leak and Heating
|
Mon Jan 8 20:24:53 2024, Aiden, Update, General,
| +
Wed Dec 20 10:33:34 2023, Jon, Infrastructure, Clean & Bake, Clean and bake lab migrated to 1129
|
Tue Dec 19 15:45:05 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Mon Dec 18 15:51:49 2023, Aiden, Update, VAC, VAC System Heating Update
|
Sun Dec 17 19:43:18 2023, Aiden, Update, VAC, Vac Heating Update
|
Fri Dec 15 14:03:02 2023, Aiden, HowTo, VAC, Vacuum Chamber Opening
|
Mon Dec 11 16:20:17 2023, Jon, Summary, TCS, FROSTI Assembly Procedure
|
Mon Dec 11 12:58:57 2023, Shane, Luis, Update, CDS, DAC-ADC loopback test debugging
| +
Sat Dec 9 12:34:12 2023, Jon, Update, General, Electronics workshop migrated to 1129
|
Fri Dec 8 11:15:21 2023, Peter, Update, VLC Update, VLC Assembly
|
Thu Dec 7 14:13:15 2023, Shane, Update, Cleanroom, cleanroom cleaning and particle count
|
Thu Dec 7 12:42:42 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Mon Dec 4 21:27:53 2023, Shane, Update, CDS, ADC-DAC loopback test results
|
Mon Dec 4 11:19:50 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Sat Dec 2 18:10:23 2023, Aiden, Update, VAC, VAC System Heating Update
|
Thu Nov 30 13:58:18 2023, Aiden, Update, VAC, VAC System Heating Update
|
Wed Nov 29 21:13:32 2023, Aiden, Update, VAC, VAC System Heating Update
|
Mon Nov 27 19:34:50 2023, Aiden, Update, Clean & Bake, Clean and Bake Batch 20 Bagging
|
Mon Nov 27 14:22:30 2023, Tyler, Update, Lore, 1129 Assembly Update
| +
Thu Nov 23 12:34:44 2023, Jon, Update, CDS, DB25 signal connections for FROSTI heaters
|
Tue Nov 21 22:09:44 2023, Aiden, Update, General, Testing Parts 8x
|
Tue Nov 21 14:47:24 2023, Tyler, Update, Lore, 1129 Workbench Assembly Update 1
|
Mon Nov 20 20:45:16 2023, Aiden, Update, VAC, Leak Test
|
Mon Nov 20 20:37:45 2023, Aiden, Update, VAC, Clean and Bake Batch 20
|
Fri Nov 17 14:06:01 2023, Shane, Update, Cleanroom, 5 zone particle count
|
Thu Nov 16 19:32:31 2023, Aiden, Update, VAC, VAC HC Levels Update
|
Thu Nov 16 17:12:42 2023, Luis, Shane, Mohak, Update, Cleanroom, Cleanroom cleaning and particle count
|
Wed Nov 15 21:52:33 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
| +
Tue Nov 14 17:21:40 2023, Jon, Update, VAC, RGA best practices
| +
Mon Nov 13 11:23:54 2023, Jon , Update, CDS, CyMAC testing
|
Mon Nov 13 11:07:50 2023, Tyler, Update, VAC, RTD Analysis
|
Mon Nov 13 06:15:45 2023, Peter, Update, VLC Update, VLC Mode Matching
|
Fri Nov 10 14:16:04 2023, shane, Update, Cleanroom, new cleanroom zone diagram
|
Thu Nov 9 19:06:46 2023, shane, Update, Cleanroom, 5 zone cleanroom measurement
|
Thu Nov 9 13:57:58 2023, Shane, Luis, Aiden, Tyler, Update, Cleanroom, cleanroom cleaning and particle count
|
Wed Nov 8 17:55:49 2023, Jon, Update, General, Lab Clean-Up Day 1
|
Mon Nov 6 11:31:25 2023, Peter, Update, VLC Update, VLC Mode Matching
|
Mon Nov 6 11:29:24 2023, Tyler, Update, Electronics, Preliminary RTD Calculations, RP Software Update
|
Wed Nov 1 20:22:07 2023, Aiden, Update, VAC, VAC System Heating Update
|
Wed Nov 1 18:24:01 2023, Shane, Update, CDS, CyMAC Power connections made
|
Tue Oct 31 19:46:35 2023, Aiden, Update, VAC, VAC System Heating Update
|
Mon Oct 30 18:15:13 2023, Shane, Update, CDS, CyMAC chassis mounted and progress on power connections
|
Mon Oct 30 11:03:56 2023, Tyler, Update, Scripts/Programs,
| +
Mon Oct 30 08:42:22 2023, Jon, Update, VAC, Vacuum Leak Test
|
Fri Oct 27 15:28:30 2023, Shane, Update, CDS, AA and AI chassis for CyMAC powered on and functional
|
Thu Oct 26 13:00:45 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Mon Oct 23 18:02:23 2023, Shane, Jon, Update, CDS, Timing chassis assembly complete
|
Mon Oct 23 11:28:05 2023, Tyler, Update, Cameras, FLIR Camera Code Updates
|
Mon Oct 23 07:28:57 2023, Peter, Update, VLC Update, VLC Mode Matching
|
Fri Oct 20 16:38:02 2023, Shane, Aiden, Update, Cleanroom, Cleanrooom cleaning and particle count
|
Thu Oct 19 11:41:04 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update 6x
|
Thu Oct 12 12:11:10 2023, Aiden, Update, VAC, Vacuum chamber Helium leak test
|
Wed Oct 11 20:47:11 2023, Jon, Update, VAC, Vacuum upgrade begins
|
Mon Oct 9 21:41:24 2023, Aiden, Update, Clean & Bake, Clean and Bake Batch 19
|
Mon Oct 9 16:59:21 2023, Shane, Jon, Update, CDS, timing chassis power cable and AI chassis testing for CyMAC
|
Mon Oct 9 11:29:37 2023, Tyler, Update, Electronics, PSD/CSD Plot Updates
|
Mon Oct 9 11:06:17 2023, Peter, Update, VLC Update, VLC Launch Chain
|
Sat Oct 7 17:10:27 2023, Aiden, Update, Clean & Bake, Clean and Bake Batch 18
|
Tue Oct 3 15:07:48 2023, Aiden, Update, Clean & Bake, Clean and Bake Batch 17
|
Fri Sep 29 17:27:30 2023, Shane, Jon, Update, CDS, Timing chassis assembly progress (CyMAC)
|
Fri Sep 29 11:53:54 2023, Shane, Update, Cleanroom, 5 zone particle count measurement in cleanroom
|
Fri Sep 29 11:22:33 2023, Shane, Aiden, Update, Cleanroom, cleaning and particle count
|
Thu Sep 28 15:17:13 2023, Aiden, Update, Clean & Bake, Clean and Bake Batch 16
|
Fri Sep 15 17:33:35 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Thu Sep 14 17:05:38 2023, Shane, Jon, Update, CDS, Timing chassis setup and testing
|
Tue Sep 12 15:31:31 2023, Aiden, Update, Clean & Bake, Clean and Bake Batch 15
|
Mon Sep 11 16:02:42 2023, Aiden, Update, VAC, VAC System Heating Update
|
Fri Sep 8 16:10:43 2023, Aiden, Update, VAC, VAC System Heating Update
|
Thu Sep 7 19:24:25 2023, Peter, Update, VLC Update, VLC Launch Chain
|
Tue Sep 5 16:43:19 2023, Aiden, Update, General, VAC System Heating Update
|
Fri Sep 1 19:21:19 2023, Aiden, Update, VAC, VAC System Heating Update
|
Thu Aug 31 12:56:29 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Tue Aug 29 22:07:38 2023, Aiden, Update, General, Electronic Bench
|
Tue Aug 29 19:09:21 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Mon Aug 28 14:43:50 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Mon Aug 21 17:13:25 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Thu Aug 17 15:18:48 2023, Aiden, Update, VAC, VAC Heating System Update
|
Thu Aug 17 15:02:44 2023, Aiden, Update, VAC, VAC Heating System Update 11x
|
Wed Aug 16 17:17:02 2023, Shane, Jon, Update, CDS, Binary input chassis powering correctly
|
Wed Aug 16 16:55:40 2023, Shane, Jon, Update, CDS, external power supply cables finished
|
Tue Aug 15 16:10:06 2023, Celeste, Update, TCS, 8/15/2023 Simulation Progress
|
Tue Aug 15 16:04:23 2023, Aiden, Update, VAC, VAC Heating System Update 6x
|
Tue Aug 15 13:32:37 2023, Sophia, Update, Scripts/Programs, Update on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD Plots
|
Tue Aug 15 10:35:00 2023, Sophia, Update, Scripts/Programs, Update on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD Plots
|
Fri Aug 11 18:32:00 2023, Aiden, Update, VAC, VAC System Heating Update 11x
|
Fri Aug 11 10:57:20 2023, Celeste, Update, TCS, 8/11/23 Simulation Progress
|
Thu Aug 10 18:32:39 2023, Aiden, Update, VAC, VAC System Heating Update
| +
Thu Aug 10 15:10:12 2023, Jon, Update, VAC, VAC System Heating Update
|
Thu Aug 10 14:13:38 2023, Celeste, Update, TCS, 8/10/23, Simulation Graphical Progress
|
Wed Aug 9 17:35:26 2023, Shane, Update, CDS, Binary output chassis finished
|
Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables
|
Tue Aug 8 17:03:22 2023, Shane, Jon, Update, CDS, Binary input chassis finished
|
Tue Aug 8 16:47:11 2023, Sophia, Update, Scripts/Programs, Update on Dynamic CSD and PSD Plots
|
Tue Aug 8 15:31:26 2023, Aiden, Update, VAC, VAC Heating System Update 10x
|
Mon Aug 7 15:36:18 2023, Sophia, Update, Scripts/Programs, Update on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD Plots 7x
|
Mon Aug 7 13:58:46 2023, shane, Update, CDS, internal power supply cables done for AI chassis
|
Fri Aug 4 15:21:33 2023, Aiden, Update, VAC, VAC System Heating Update
|
Thu Aug 3 18:03:42 2023, Shane, Jon, Update, CDS, Anti-Aliasing chassis complete
|
Thu Aug 3 17:47:51 2023, Aiden, Update, VAC, VAC Heating System Update
|
Thu Aug 3 16:00:25 2023, Aiden, Update, VAC, VAC System Heating Update
|
Wed Aug 2 17:02:38 2023, Aiden, Update, VAC, VAC System Heating Update
|
Tue Aug 1 16:22:35 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Tuesday 8/1
|
Tue Aug 1 15:44:31 2023, Sophia, Update, Scripts/Programs, Update on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD Plots 6x
|
Tue Aug 1 12:48:41 2023, Aiden, Update, Cleanroom, Pre Filter Change
|
Tue Aug 1 12:10:03 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Mon Jul 31 19:27:30 2023, Sophia, Update, Scripts/Programs, Update on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD Plots
|
Mon Jul 31 12:39:01 2023, Shane, Update, Electronics, LED cable assemblies installed
|
Fri Jul 28 18:03:07 2023, Pamella, Update, FLIR, Final plot - FLIR
|
Fri Jul 28 17:45:45 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Friday 7/28
|
Fri Jul 28 13:46:17 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Fri Jul 28 13:39:39 2023, shane, Update, Cleanroom, full 5 zone cleanroom particle count
|
Fri Jul 28 13:07:39 2023, Shane, Aiden , Update, Cleanroom, cleanroom cleaning and particle count 6x
|
Thu Jul 27 14:46:55 2023, Shane, Jon, Update, Electronics, AA chassis DC on/off switch assembled
|
Thu Jul 27 14:11:42 2023, Sophia, Update, Scripts/Programs, Update on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD Plots
|
Thu Jul 27 11:28:36 2023, Sophia , Update, Scripts/Programs, Update on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD Plots
|
Thu Jul 27 10:18:43 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification
|
Tue Jul 25 15:35:14 2023, Shane, Update, Electronics, More chassis moved
|
Mon Jul 24 16:19:29 2023, Shane, Jon, Update, Electronics, Chassis semi-assembled and moved
|
Mon Jul 24 14:55:53 2023, Jon, Update, VAC, Removed extension power cable
|
Thu Jul 20 21:00:23 2023, Pamella, Update, FLIR, Data plot FLIR and updates about the black body
|
Thu Jul 20 18:03:19 2023, Aiden, Update, VAC, Vacuum Chamber Baking Update
|
Wed Jul 19 19:10:31 2023, Pamella, Update, FLIR, Data plot FLIR and updates. 8x
|
Wed Jul 19 14:39:19 2023, Pamella, Shane, Aiden, Update, Cleanroom, cleaning and particle count
| +
Tue Jul 18 16:35:06 2023, Pamella, Update, FLIR, Plot-Data with the new configuration without the mask and reflector.
| +
Tue Jul 18 16:12:27 2023, Pamella, Update, FLIR, Thermocouple plot.
|
Tue Jul 18 16:04:26 2023, Pamella, Update, FLIR, Setup FLIR with black wall (black body)
|
Tue Jul 18 14:13:46 2023, Sophia , Update, Scripts/Programs, Update on Laser Noise Data Collection and Analysis 6x
|
Mon Jul 17 14:01:41 2023, Aiden, Update, VAC, VAC System Heating Update
|
Mon Jul 17 13:50:41 2023, Aiden, Update, VAC, VAC System Heating Update
|
Sun Jul 16 15:21:56 2023, Pamella, Update, General, General update about some problems in the lab.
|
Fri Jul 14 16:49:42 2023, Pamella, Update, FLIR, New bridge and calibration data
|
Fri Jul 14 14:37:25 2023, Aiden, Update, VAC, VAC System Heating Update
| +
Thu Jul 13 16:59:03 2023, Jon, Update, General, Ant traps placed around lab
|
Thu Jul 13 14:56:43 2023, Aiden, Update, VAC, VAC System Heating Update
|
Mon Jul 10 13:23:23 2023, Aiden, Update, VAC, VAC System Heating Update
|
Fri Jul 7 15:11:39 2023, Aiden, Update, VAC, VAC System Heating Update
|
Thu Jul 6 18:03:19 2023, Pamella, Update, FLIR, FLIR project - New configuration
|
Thu Jul 6 16:16:03 2023, Aiden, Summary, VAC, Vacuum Chamber Baking Update
|
Thu Jul 6 13:34:48 2023, Pamella, Shane, Julian, Aiden, Update, Cleanroom, cleaning and particle count
|
Wed Jul 5 16:02:12 2023, Aiden, Update, Clean & Bake, Clean and Bake batch 14 Bagging
|
Wed Jul 5 15:46:47 2023, Aiden, Cao, Infrastructure, VAC, Vacuum Chamber Baking Update
|
Tue Jul 4 15:35:38 2023, Pamella, Update, FLIR, FLIR - reflexion problem
|
Mon Jul 3 18:38:13 2023, Pamella, Update, FLIR, FLIR project
|
Mon Jul 3 16:26:21 2023, Cao, Infrastructure, DAQ, Access and control Red Pitaya remotely and run it on local machine
|
Mon Jul 3 14:32:24 2023, Cao, Infrastructure, VAC, Cooling down vacuum chamber
|
Fri Jun 30 16:43:14 2023, Pamella, Update, FLIR, Updates: Small moving the FLIR camera
|
Fri Jun 30 15:57:28 2023, Pamella, Update, FLIR, Data and python code update
|
Thu Jun 29 18:27:26 2023, Jon, Cao, Infrastructure, VAC, Vacuum bake attempt 3: success!
|
Wed Jun 28 15:58:56 2023, Shane, Cao, Infrastructure, VAC, Power trip problem remains, source of smoke is insulation
| +
Tue Jun 27 21:47:56 2023, Jon, Infrastructure, VAC, Vacuum chamber bake attempt 1
|
Tue Jun 27 15:18:26 2023, Pamella, Update, FLIR, New data collection
|
Tue Jun 27 14:04:42 2023, Sophia A. , Update, Measuring Noise in Interferometer, Interferometer set up and connection to red pitaya
|
Tue Jun 27 12:09:37 2023, Shane, Update, Cleanroom, cleanroom 5 zone particle count measurement
|
Fri Jun 23 15:47:06 2023, Pamella, Update, FLIR, Collecting data - Moving horizontal and vertical on screen. 6x
|
Thu Jun 22 13:58:00 2023, Pamella, Julian and Shane, Update, Cleanroom, Cleaning and Particle Count
|
Tue Jun 20 22:14:24 2023, Pamella, Cao, Infrastructure, VAC, Short term testing of vacuum heater controller units
|
Tue Jun 20 17:28:23 2023, Pamella, Update, Electronics, Heater system parts - Wiped
|
Mon Jun 19 11:20:57 2023, Pamella, Update, FLIR, FLIR - Fixed some problems
|
Fri Jun 16 17:40:28 2023, Aiden, Update, Clean & Bake, Clean and Bake Batch 14
|
Fri Jun 16 16:17:13 2023, Pamella, Update, FLIR, FLIR - Change the position
|
Wed Jun 14 15:35:36 2023, Pamella, Update, VAC, Heating system installation
|
Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI
|
Tue Jun 13 21:08:46 2023, Pamella, Infrastructure, VAC, Heater system - Installation
|
Tue Jun 13 13:25:05 2023, Aiden, Summary, Clean & Bake, Clean and Bake Batch 13
|
Tue Jun 13 10:28:50 2023, Pamella, Update, General, Wiped and bagged the heating and cords.
|
Mon Jun 12 18:52:00 2023, Pamella, Update, General, Heater system parts - Wiped and bagged
|
Mon Jun 12 12:15:10 2023, Pamella, Update, FLIR, FLIR- Take data in the closest point.
|
Thu Jun 8 14:51:58 2023, Pamella, Update, FLIR, FLIR- Distance
|
Tue Jun 6 16:15:09 2023, Peter, Update, VLC Update, Launch Optics for Visible Light Cavity
|
Tue Jun 6 16:04:46 2023, Aiden, Update, General, Water
|
Fri Jun 2 14:28:40 2023, Pamella, Update, FLIR, FLIR project - Test without the black wall.
|
Thu Jun 1 14:41:36 2023, Pamella, Update, FLIR, FLIR project - Test without the black wall.
|
Wed May 31 16:55:55 2023, Pamella, Update, FLIR, FLIR- Focus distance
|
Wed May 31 16:18:41 2023, Aiden, Summary, General, Mock FROSTI
|
Wed May 31 12:16:28 2023, Shane, Update, Cleanroom, cleanroom particle counts (full 5 zone measurement)
|
Wed May 31 11:42:16 2023, Pamella, Julian and Shane, Update, General, Cleaning room and particle count
|
Tue May 30 14:51:27 2023, Pamella, Update, FLIR, New 3D mask - Bigger triangles shapes.
|
Wed May 24 14:28:26 2023, Peter, Update, VLC Electronics, Laser intensity/polarization drift measurements
|
Wed May 24 14:06:27 2023, Pamella, Update, FLIR, FLIR project - Tests
|
Tue May 23 16:52:56 2023, Pamella, Update, FLIR, FLIR project - Reinstalling the mask and Reconfiguration FLIR position.
|
Mon May 22 17:08:50 2023, Pamella, Update, FLIR, FLIR project - Installing the mask.
|
Mon May 22 16:43:28 2023, Peter, Update, VLC Electronics, Laser intensity/polarization drift measurements
|
Thu May 18 14:07:08 2023, Peter, Update, VLC Update, 532nm Intensity Measurement
|
Wed May 17 12:18:08 2023, Pamella, Julian and Shane , Update, General, Cleaning room and particle count
|
Tue May 16 11:56:33 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement
|
Sun May 14 15:50:48 2023, Cao, Infrastructure, Computers, High resolution display of logrus machine
|
Fri May 12 20:28:34 2023, Aiden, Cao, Physics, VAC, Vacuum chamber Helium leak test
|
Wed May 10 10:49:34 2023, Aiden, Update, General, RGA Software
|
Tue May 9 20:55:12 2023, Jon, Infrastructure, VAC, Calibrated Ar leak rate
| +
Tue May 9 15:49:20 2023, Jon, Infrastructure, VAC, Permanent cable routing
|
Mon May 8 12:00:03 2023, Pamella, Shane, Julian, Update, General, Cleanroom particle counts and cleaning the cleanroom.
|
Thu May 4 14:01:10 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement
|
Tue May 2 17:03:14 2023, Jon, Cao, Physics, VAC, First pump-down test of vacuum chamber
|
Tue May 2 15:55:33 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement
|
Mon May 1 18:56:57 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement
|
Mon May 1 17:10:25 2023, Julian, Cao, Physics, VAC, Installing Pirani gauge and RGA probe onto to vacuum chamber
| +
Fri Apr 28 19:39:19 2023, Cao, Summary, General, Clean and Bake Leybold TTR 91 Pirani Gauge
|
Fri Apr 28 19:00:13 2023, Cao, Physics, VAC, Tighten CF ports on vacuum chamber
| +
Fri Apr 28 18:16:57 2023, Cao, Physics, VAC, Grounding vacuum system
|
Fri Apr 28 11:21:01 2023, Peter, Update, VLC Update, Laser intensity/polarization drift measurements
|
Wed Apr 26 18:05:41 2023, Pamella, Julian, Shane, Update, Cleanroom, cleanroom particle counts and cleaning log
|
Tue Apr 25 11:56:37 2023, Jon, Update, VLC Electronics, Red Pataya has arrived
|
Mon Apr 24 17:38:45 2023, Aiden, Summary, General, Clean and Bake Batch 12
|
Fri Apr 21 16:51:26 2023, Pamella, Update, General, Cleaning cables.
|
Fri Apr 21 15:21:18 2023, Pamella, Update, FLIR,
| +
Fri Apr 21 00:06:43 2023, Jon, Update, VAC, Vacuum prep and installation - parts have arrived
|
Wed Apr 19 17:39:50 2023, Pamella, Update, FLIR, FLIR project
|
Mon Apr 17 17:06:49 2023, Aiden, Summary, General, Clean and Bake batch 11
|
Wed Apr 12 16:17:50 2023, shane, Update, General, Particle Counter moved
|
Wed Apr 12 10:53:02 2023, Aiden, Summary, General, Valve Cleaning
|
Tue Apr 11 17:56:15 2023, Pamella, Update, General, Lab cleaning
|
Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced
|
Fri Apr 7 09:48:09 2023, Pamella, Update, General, Clean the system parts 7x
|
Thu Apr 6 10:20:43 2023, Peter, Update, VLC Update, Laser intensity/polarization drift measurements
|
Tue Apr 4 16:52:08 2023, Jon, Update, Cleanroom, Particle counter docking station
|
Tue Apr 4 16:43:53 2023, Jon, Update, VLC Electronics, Additional Thorlabs PDA10A2
|
Tue Apr 4 09:53:37 2023, Peter, Update, VLC Update, Laser intensity/polarization drift measurements
|
Tue Apr 4 09:39:58 2023, Peter, Update, VLC Electronics, 532 M2 Measurements
|
Mon Apr 3 17:04:05 2023, Aiden, Summary, General, IDP Scroll Pump Assembly
|
Fri Mar 31 14:23:13 2023, Pamella, Update, General, Clean and bake batch 11
|
Wed Mar 29 16:00:36 2023, Pamella, Update, Cameras, FLIR project
|
Fri Mar 24 13:36:17 2023, Pamella, Update, General, Clean and Bake batch 10
| +
Fri Mar 24 07:14:38 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart
|
Thu Mar 23 18:40:08 2023, Julian, Update, General, Cleanroom Update
|
Wed Mar 22 15:25:00 2023, Shane, Update, General, Clean room recertification particle counts
|
Wed Mar 22 12:16:20 2023, Jon, Infrastructure, Cleanroom, Experimenting with HEPA fan speeds
|
Fri Mar 17 19:46:39 2023, Aiden, Summary, General, Clean and Bake batch 9
|
Tue Mar 14 18:21:41 2023, Aiden, Summary, General, Clean and Bake batch 8
|
Fri Mar 10 12:08:09 2023, Peter, Update, VLC Electronics, 532 M2 Measurements
|
Thu Mar 9 13:51:42 2023, Shane, Update, General, Clean room counts 3/9/23
|
Thu Mar 9 12:03:59 2023, Peter, Update, VLC Electronics, 532 M2 Measurements
|
Wed Mar 8 19:29:00 2023, Aiden, Summary, General, Clean and Bake batch 7
|
Wed Mar 8 18:35:52 2023, Pamella, Update, , Lab cleaning
|
Mon Mar 6 18:48:43 2023, Pamella, Update, General, Cleanroom update
|
Mon Mar 6 15:32:58 2023, Jon, Infrastructure, General, Cabinet installation completed
|
Sat Mar 4 00:34:46 2023, Julian, Update, General, Cleanroom Update
|
Fri Mar 3 19:13:33 2023, Aiden, Summary, General, Clean and Bake Batch 6
|
Thu Mar 2 20:53:56 2023, Julian, Update, General, Cleanroom Update
|
Wed Mar 1 21:27:20 2023, Jon, Infrastructure, Cleanroom, Over-table shelf height raised
|
Tue Feb 28 19:37:22 2023, Aiden, Summary, General, Clean and Bake batch 5
|
Tue Feb 28 19:33:51 2023, Peter, Update, , 532 M2 Measurements
|
Tue Feb 28 19:31:05 2023, Peter, Update, VLC Electronics, 532 M2 Measurements
|
Tue Feb 28 13:53:17 2023, Pamella, Update, General, Vacuum chamber cleaning
|
Mon Feb 27 17:09:04 2023, Pamella , Update, General, Vacuum Chamber Cleaning
|
Thu Feb 23 21:12:33 2023, Julian, Update, General, Vacuum Chamber Cleaning
|
Thu Feb 23 13:32:55 2023, Shane, Update, General, Clean room floor particle counts
|
Tue Feb 21 17:51:04 2023, Aiden, Summary, General, Clean and Bake batch 4
|
Fri Feb 17 19:12:39 2023, Aiden, Update, General, Clean and Bake batch 3
|
Mon Feb 13 18:57:53 2023, Aiden, Summary, General, Clean and Bake batch 2
|
Sat Feb 11 17:09:29 2023, Shane, Update, General, clean room particle counts 2/10/23
|
Sat Feb 11 00:17:27 2023, Julian, Update, General, Vacuum Chamber Cleaning
|
Fri Feb 10 16:34:45 2023, Huy Tuong Cao, Infrastructure, Clean & Bake, Nitrogen gas tank ready to use
|
Fri Feb 10 15:15:30 2023, Aiden, Update, General, Bagging First Batch
|
Tue Feb 7 17:44:17 2023, Jon, Infrastructure, Computers, Workstation 1 (ws1) set up
|
Tue Feb 7 17:27:30 2023, Aiden, Physics, ELOG, Clean and Bake Batch #1
|
Mon Feb 6 20:02:32 2023, Julian, Update, General, Cleanroom Update
|
Sat Feb 4 17:01:03 2023, Peter, Update, VLC Electronics, Laser Data
|
Fri Feb 3 13:04:04 2023, shane, Summary, General, clean room particle counts 1/25/23
|
Fri Jan 27 18:44:31 2023, Julian , Update, General, Vacuum Chanmber Cleaning
|
Thu Jan 26 18:58:25 2023, Aiden, Update, General, Oven Heating
|
Mon Jan 23 17:26:15 2023, Peter Carney, Update, General, Oven cleaning
|
Wed Jan 18 22:06:05 2023, Julian, Update, ELOG, Cleanroom Update
|
Wed Dec 14 18:34:33 2022, Jon, Configuration, Electronics, Adapter for 532 nm laser power supply
|
Wed Dec 14 17:35:41 2022, Jon, Infrastructure, Computers, Windows Laptop
|
Mon Nov 28 18:10:23 2022, shane, Update, ELOG, Particle counts in the clean room
|
Mon Oct 3 17:21:39 2022, Cao, Update, TCS, Inspection of macor parts 7x
|
Wed Aug 17 16:04:30 2022, Phoebe Zyla, Summary, Lore, Testing the Cartridge Heater and Collecting FLIR Data
|
Tue Jul 26 14:10:35 2022, Cassidy, Update, Cameras, Optical Post Replacement and Realignment
|
Fri Jul 22 13:20:28 2022, Phoebe, Update, , Comsol
|
Mon Jul 11 14:29:45 2022, Jon, Omnistructure, General, HEPA filter installed
|
Tue Jun 21 18:31:49 2022, Cassidy and Phoebe, Update, Cameras, IR Absorbing Screen and FLIR Camera Setup
| +
Mon Jun 6 17:11:48 2022, Jon, Update, Cameras, FLIR Camera Setup
|
Thu Jun 2 16:14:58 2022, Jon, HowTo, General, Custom conda environment on JupyterHub
|
Sun Apr 10 15:39:49 2022, Rutuja Gurav, HowTo, Computer Scripts/Programs, HowTo: Renew the Let's Encrypt SSL certificate using certbot
|
|