ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 9 of 10  Not logged in ELOG logo
IDdown Date Author Type Category Subject Text Attachments
  69   Wed Apr 12 10:53:02 2023 AidenSummaryGeneralValve CleaningBagged and Tagged the parts from batch 10
and placed them inside the clean room. 

Then
cleaned the last gate valve in liquinox for
  
  68   Tue Apr 11 17:56:15 2023 PamellaUpdateGeneralLab cleaning Today Pamella and Julian finished cleaning
of the cleanroom, starting with the HEPA
vacuuming, mopping and clearing all floor
  
  67   Tue Apr 11 13:15:40 2023 CaoInfrastructureClean & BakeNitrogen gas tank replacedThe nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).

The new tank has been
  
  66   Fri Apr 7 09:48:09 2023 PamellaUpdateGeneralClean the system partsPamella and Julian wiped and tag system parts
for the vacuum machine. We used isopropyl
and vectra wipes in the most import pieces:
 7x 
  65   Thu Apr 6 10:20:43 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsMore optical components were added to the
optical set up for laser intensity / polarization
drift measurements. Both lenses and both
 Optical_Setup_4-6-23.jpg 
  64   Tue Apr 4 16:52:08 2023 JonUpdateCleanroomParticle counter docking stationDue to the problems we have encountered trying
to serially communicate directly with the
Met One DR-528 particle counter, I went ahead
 Met_One_Dock.png 
  63   Tue Apr 4 16:43:53 2023 JonUpdateVLC ElectronicsAdditional Thorlabs PDA10A2I ordered a second PDA10A2 and mounting post
+ spacer (which puts the aperture at the
VLC's standard 3" beam height). These arrived
 PDA10A2.png 
  62   Tue Apr 4 09:53:37 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsThe set up for the next round of beam characterization
measurements has begun. The beam is initially
passing through a half waveplate, is split
 initial_Intens_measure_set_up.jpg 
  61   Tue Apr 4 09:39:58 2023 PeterUpdateVLC Electronics532 M2 MeasurementsFinal M squared measurements were taken Wednesday,
3/29/23 by Peter and Ryan Hinosawa. 5 separate
sets of data were taken, and upon discussion,
 OmegaY_M2_Fit_8.pdfOmegaX_M2_Fit_8.pdfM2_Measurements_Set_Up.svgBeam_Data_8_3lens.txt 
  60   Mon Apr 3 17:04:05 2023 AidenSummaryGeneralIDP Scroll Pump AssemblyAiden installed the isolation valve and the
exhaust silencer kits on the IDP-3 Scroll
pump. The entire assembly still needs to
 IMG_4244.jpg 
  59   Fri Mar 31 14:23:13 2023 PamellaUpdateGeneralClean and bake batch 11Today I bagged and tagged batch 11. I wiped
the some tools: Centering ring alum( 2 pieces),
reversible ratcheting, gasket removal (CF).
 4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg 
  58   Wed Mar 29 16:00:36 2023 PamellaUpdateCamerasFLIR project
Today Pamella and Tyler started  work in
the updates for the FLIR project. 
We trie
for the first time cover the mirrors with
 15D13FE3-48A9-4ACF-9422-07032DD8D028.jpeg 
  57   Fri Mar 24 13:36:17 2023 PamellaUpdateGeneralClean and Bake batch 10Today I bagged and tagged batch 10.
 I wiped
the RGA vacuum component for around 25 minutes
after that I bagged and tagged this part
 260AEB73-02D0-4635-93B3-B2EB3269FB84.jpeg59FD199A-A444-439A-8D51-C242B65BBECD.jpeg9A48A0EE-5EFE-409D-ACC0-17011F6F7EBF.jpeg950F85B7-D304-4724-AB3D-B606E422F1E3.jpeg 
  56   Fri Mar 24 07:14:38 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe ws2 cart has been thoroughly wiped down
with IPA wipes and moved inside the cleanroom.
I have reconnected it to power and Ethernet
  
  55   Thu Mar 23 18:40:08 2023 JulianUpdateGeneralCleanroom UpdateToday Pamella and I came in to Hepa vacuum
and mop the floor of the cleanroom for general
maintenance. 
  
  54   Wed Mar 22 15:25:00 2023 ShaneUpdateGeneralClean room recertification particle counts Attached are the five zone particle measurements
for the clean room now that the fan speeds
have been set to MEDIUM. 2 min sample time,
 counts3.22.23.pdf 
  53   Wed Mar 22 12:16:20 2023 JonInfrastructureCleanroomExperimenting with HEPA fan speedsJon, Cao
In effort to try to reduce the noise
level inside the cleanroom, we have dialed
  
  52   Fri Mar 17 19:46:39 2023 AidenSummaryGeneralClean and Bake batch 9Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in
 IMG-4208.jpgIMG-4209.jpg 
  51   Tue Mar 14 18:21:41 2023 AidenSummaryGeneralClean and Bake batch 8Starting off Peter and I refilled the deionized
water barrel.

Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for
  
  50   Fri Mar 10 12:08:09 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 laser data today. The configuration
is the same as before except now the beam
camera is the only component moving. Pictures
 OmegaX_M2_Fit_4.pngOmegaY_M2_Fit_4.png 
  49   Thu Mar 9 13:51:42 2023 ShaneUpdateGeneralClean room counts 3/9/23Here's the clean room counts from this morning.
Also attached is rough diagram of where the
five zones are in the clean room. Counts
 particlecounts3.9.23.pdfclean_room_zones.JPG 
  48   Thu Mar 9 12:03:59 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 Data today. Picture of the optical
set up is shown below. lens1 f = 100mm, lens2
f = 50mm, lens3 f = 150mm. There was a nice
 OmegaY_M2_Fit_3.pngOmegaX_M2_Fit_3.pngoptical_setup.jpg 
  47   Wed Mar 8 19:29:00 2023 AidenSummaryGeneralClean and Bake batch 7Today gave another cleaning to the MDC gate
valve. It is still very dirty an will need
more cleaning. I also cleaned the other 3
 IMG_4180.jpgIMG_4182.jpg 
  46   Wed Mar 8 18:35:52 2023 PamellaUpdate Lab cleaning Today Pamella finished cleaning of the cleanroom,
starting with the HEPA vacuuming,  mopping
and clearing all floor with IPA wipes. 
Also
  
  45   Mon Mar 6 18:48:43 2023 PamellaUpdateGeneralCleanroom update Today Pamella and Julian finished cleaning
of the new lab cabinets. Also we wiped the
computer and  put inside the cleanroom so
 203863E0-106A-465E-8D9C-461B0358FB60.jpeg779F360D-CAD0-4C49-AE0B-973F97F6D099.jpeg276B9F0C-6661-441F-AD34-D79DA61E1FC3.jpeg 
  44   Mon Mar 6 15:32:58 2023 JonInfrastructureGeneralCabinet installation completedJon, Cao, Peter
This morning Facilities delivered
and installed two new cabinets with sliding
 IMG_0088.jpgIMG_0089.jpg 
  43   Sat Mar 4 00:34:46 2023 JulianUpdateGeneralCleanroom UpdateToday I was able to finish cleaning the frame
of the laser table, and for good measure
I wiped down the tabletop and exterior of
  
  42   Fri Mar 3 19:13:33 2023 AidenSummaryGeneralClean and Bake Batch 6Started to clean the dirtiest of the valves.
I could not finish but I definitely made
good progress on it. The MDC valve is very
 IMG_4173.jpgIMG_4174.jpg 
  41   Thu Mar 2 20:53:56 2023 JulianUpdateGeneralCleanroom UpdateToday Pamella and Julian began the final cleaning
of the cleanroom, starting with the HEPA
vacuuming and mopping then wiping down every
  
  40   Wed Mar 1 21:50:46 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe Linux workstation (ws2) that used to
sit on the blue workbench (now inside the
cleanroom) has been mounted on a mobile cart,
 ws2_cart-1.jpegws2_cart-2.jpeg 
  39   Wed Mar 1 21:27:20 2023 JonInfrastructureCleanroomOver-table shelf height raisedJon, Cao

Today we raised the height of the
shelf overhanging the cleanroom laser table
 cleanroom-shelf.jpg 
  38   Tue Feb 28 19:37:22 2023 AidenSummaryGeneralClean and Bake batch 5Bagged and Tagged batch 4 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4168.jpgIMG_4169.jpgIMG_4170.jpg 
  37   Tue Feb 28 19:33:51 2023 PeterUpdate 532 M2 MeasurementsY axis of plot in units of micrometers. X
axis in units of millimeters. 
  
  36   Tue Feb 28 19:31:05 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook M2 measurements today. Configuration:
Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm)
at 200mm, camera at 350mm. The laser beam
 X_width_and_Y_width.png 
  35   Tue Feb 28 13:53:17 2023 PamellaUpdateGeneralVacuum chamber cleaning Pamella, Dr. Richardson and Dr.Cao finished
checking and cleaning the interior of the
chamber, chamber lid, and exterior of the
 EE5E0296-D362-4EA6-B482-85A629D93B46.jpeg4C0AA805-667E-45AD-8704-03389BD63489.jpeg51CE3D1E-F48E-4F57-8450-8F58C27154BB.jpeg58ADE656-52AD-4F0E-88BA-B993F977A519.jpeg 
  34   Mon Feb 27 17:09:04 2023 Pamella UpdateGeneralVacuum Chamber CleaningPamella and Julian finished cleaning the interior
of the chamber, chamber lid, and the table.
We found some black residue on the side of
 Side_of_Table.jpegWipes_from_table.jpeg 
  33   Thu Feb 23 21:12:33 2023 JulianUpdateGeneralVacuum Chamber CleaningToday I was able to come in and wipe down
both sides of the vacuum chamber lid using
the regular alcohol wipes and also wipes
 ChamberLid_inside.jpgChamberLid_outside.jpgVacuumChamber_inside.jpg 
  32   Thu Feb 23 13:32:55 2023 ShaneUpdateGeneralClean room floor particle countsHere are the counts from the clean room floor
today. The counts should be dated- the ones
from today (2/23/23) are the last 8 in the
 2.23.2023.pdf 
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4148.jpgIMG_4147.jpg 
  30   Fri Feb 17 19:12:39 2023 AidenUpdateGeneralClean and Bake batch 3Bagged and Tagged batch 2 parts by placing
no more than two parts per ESD bag then taped
them with kapton tape and tagged them with
 IMG_4126.jpgIMG_4125.jpg 
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC,
  
  28   Sat Feb 11 17:09:29 2023 ShaneUpdateGeneralclean room particle counts 2/10/23Took a round of clean room counts after the
latest clean of vacuum chamber on Feb 10.
Used 60 second sample time, 5 samples for
 occupied2.10.23.pdfunoccupied2.10.23.pdfparticlecounts2.10.23.PDF 
  27   Sat Feb 11 00:17:27 2023 JulianUpdateGeneralVacuum Chamber CleaningToday I finished wiping down the rest of the
vacuum chamber, specifically focusing on
the connecting ports and outside surface
 20230210_181404.jpg20230210_181424.jpg20230210_181541.jpg20230210_181606.jpg 
  26   Fri Feb 10 16:34:45 2023 Huy Tuong CaoInfrastructureClean & BakeNitrogen gas tank ready to useCao,


Today I fixed the final bit related
to the nitrogen gas tank, which is to apply
sealing tape to M-NPT connector of the hose
 AirGunSealed.jpg 
  25   Fri Feb 10 15:15:30 2023 AidenUpdateGeneralBagging First BatchAiden Bagged and Tagged the first batch of
stainless steel parts shown on the google
spread sheet. 
1. Removed two parts from
  
  24   Tue Feb 7 17:44:17 2023 JonInfrastructureComputersWorkstation 1 (ws1) set upThe Linux workstation (ws1) that used to sit
on the old workbench has been mounted on
the new electronics bench and is now ready
 ws1.jpg 
  23   Tue Feb 7 17:27:30 2023 AidenPhysicsELOGClean and Bake Batch #1Cleaned SS parts with liquinox for 20 min.
Then put in oven for 5 steps;
1. Ramp, 100
degC, 15 min
2. Const, 100 degC, 30 min
3.
  
  22   Mon Feb 6 20:02:32 2023 JulianUpdateGeneralCleanroom UpdateI wiped down the main table (including frame,
legs, and transparent shelf) and workbench
using alcohol wipes. Once I cleaned all of
  
  21   Sat Feb 4 17:01:03 2023 PeterUpdateVLC ElectronicsLaser DataPeter and Ryan took laser beam data. Configuration:
100mm focal length lens is ~100mm from lens.
150mm focal length lens is ~200mm from first
 OmegaX_M2_Fit_3.pngOmegaY_M2_Fit_3.png 
  19   Fri Feb 3 13:04:04 2023 shaneSummaryGeneralclean room particle counts 1/25/23Clean room count graphs for each zone (as
of January 25, 2023) attached
 cleanroomcountsJan25.pdf 
ELOG V3.1.3-7933898