ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 2 of 10  Not logged in ELOG logo
ID Date Author Type Categorydown Subject Text Attachments
  152   Mon Jul 10 13:23:23 2023 AidenUpdateVACVAC System Heating Update
Checked on the system today. 


The
flange on the turbo pump has reached an equilibrium
temperature of 87 degC when set at 150 degC.
  
  153   Thu Jul 13 14:56:43 2023 AidenUpdateVACVAC System Heating Update
Checked on the vacuum system today to
change the PID controls back to their default
values in order to try and get the temperature
  
  156   Fri Jul 14 14:37:25 2023 AidenUpdateVACVAC System Heating Update
Checked on the vacuum system and it looks
like it will either need to be increased
in temperature or baked for a longer time.
  
  160   Mon Jul 17 13:50:41 2023 AidenUpdateVACVAC System Heating Update
Started to cool down the chamber today.
Final temperature readings of the chamber
were 146C and 91C for the body and cross
  
  161   Mon Jul 17 14:01:41 2023 AidenUpdateVACVAC System Heating Update
The insulation on the lid of the vacuum
chamber has some discoloration and it may
be wise to place a sensor closer to this
 IMG_4535.jpg 
  168   Thu Jul 20 18:03:19 2023 AidenUpdateVACVacuum Chamber Baking Update
Took another set of RGA data after the
second bake has cooled down to 27 degC.


Just
by visual comparison to the other graphs,
 bake2_230720.png 
  170   Mon Jul 24 14:55:53 2023 JonUpdateVACRemoved extension power cableI removed the extension cable that was powering
the leftmost heater controller, since there
is no bake currently happening. It is currently
  
  179   Fri Jul 28 13:46:17 2023 AidenUpdateVACVacuum Chamber Baking Update
Took some more data to look at the HC
count. Initial data was from leaving the
Argon leak closed and then left it open for
 bake2_230720_ArC.pngbake2_230720_ArO.pngbake2_230728_Closed_Open.pngbake2_230728_Open_Open.png 
  184   Tue Aug 1 12:10:03 2023 AidenUpdateVACVacuum Chamber Baking Update
Dr. Richardson and I took off the insulation
on the lid again to add more insulation in-between
the heater tape folds in addition to what
 bake2_230801_ArC.pngbake2_230801_ArO.pngbake2_230801_Closed_Open.png 
  188   Wed Aug 2 17:02:38 2023 AidenUpdateVACVAC System Heating Update
Moved the temperature sensor on the PID
controller to one of the switch backs on
the lid.


Also started the next
  
  189   Thu Aug 3 16:00:25 2023 AidenUpdateVACVAC System Heating UpdateCheck on the temperature of the bake today
to see the equilibrium temperatures. With
both of the PID controllers set to 150 C,
  
  190   Thu Aug 3 17:47:51 2023 AidenUpdateVACVAC Heating System Update
Did some further testing to determine
if it was within reason to increase the temperature
of the chamber. I used a thermometer and
  
  192   Fri Aug 4 15:21:33 2023 AidenUpdateVACVAC System Heating UpdateChecked on Bake 3 today and the temperature
sensors read 126 C and 91 C for the chamber
barrel and turbo pump flange respectively.
  
  195   Tue Aug 8 15:31:26 2023 AidenUpdateVACVAC Heating System Update
Vacuum Chamber equilibrium temperature
for bake 3 are 126 C and 88 C for the chamber
wall and turbo pump flange respectively.
 10x 
  201   Thu Aug 10 14:36:00 2023 AidenUpdateVACVAC System Heating UpdateCame in to install one of the Full range gauges.
Checked the temperature first of the cross
and it was reading 30 C. After installing
  
  202   Thu Aug 10 15:10:12 2023 JonUpdateVACVAC System Heating UpdateI shut down the turbo pump since this is evidently
a large leak. We CANNOT turn on the RGA for
leak checking with the pressure above 1E-5
  
  203   Thu Aug 10 18:32:39 2023 AidenUpdateVACVAC System Heating Update
[Dr. Richardson, Aiden]


DO NOT TOUCH ANY VALVES ON THE
CHAMBER. THERE IS A PRESSURE DIFFERENTIAL
 IMG_4588.jpg 
  205   Fri Aug 11 18:32:00 2023 AidenUpdateVACVAC System Heating Update
[Dr. Richardson, Aiden] Large Update


Removed
most of the insulation on the chamber in
order to pull back some of the heater tape
 11x 
  208   Tue Aug 15 16:04:23 2023 AidenUpdateVACVAC Heating System Update
Pulled off the rest of the heater tape
along with the aluminum tape left behind.
The aluminum tape adhesive left behind a
 6x 
  212   Thu Aug 17 15:02:44 2023 AidenUpdateVACVAC Heating System Update
Put the heating tape back on and made
sure to have 4 coils around the barrel of
the chamber. To make this happen I did not
 11x 
  213   Thu Aug 17 15:18:48 2023 AidenUpdateVACVAC Heating System UpdateRelocated the PID controllers so that the
heating tape could be plugged in. In the
picture the left one controls the top half
 IMG_4628.jpg 
  214   Mon Aug 21 17:13:25 2023 AidenUpdateVACVacuum Chamber Baking Update
Came in to take RGA data and found the
turbo pump drawing .38 Amps. This was much
higher than what it was on Friday. I investigated
 bake3_230821_ArC.pngbake3_230821_ArO.png 
  215   Mon Aug 28 14:43:50 2023 AidenUpdateVACVacuum Chamber Baking UpdateThe PID controllers were turned off on Friday
and the chamber was left to cool over the
weekend. Just took data and it looks like
 bake4_230828_ArC.pngbake4_230828_ArO.png 
  216   Tue Aug 29 19:09:21 2023 AidenUpdateVACVacuum Chamber Baking UpdateHere are some more plots with the RGA data
take August 29. It seems that more pumping
time has led to the HC levels being dramatically
 bake4_230829_ArO.pngbake4_230829_ArC.png 
  218   Thu Aug 31 12:56:29 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook some more RGA data to see if the HC levels
have further declined since bake 4 and it
seems that it has started to plateau with
 bake4_230831_ArC.pngbake4_230831_ArO.pngbake4_230829_ArO.png 
  219   Fri Sep 1 19:21:19 2023 AidenUpdateVACVAC System Heating UpdateStarted bake 5 today. This will hopefully
be a longer and hotter bake with it lasting
6-7 days at around 150 C. The pressure in
  
  222   Fri Sep 8 16:10:43 2023 AidenUpdateVACVAC System Heating UpdateTurned off the PID controllers to let the
chamber cool down. Final temperatures for
the RGA cross and Turbo pump cross were 113
  
  223   Mon Sep 11 16:02:42 2023 AidenUpdateVACVAC System Heating UpdateThe chamber has cooled down from bake 5 and
I took the first set of data. The pressure
measured during the RGA measurements reached
 bake5_230911_ArO.pngbake5_230911_ArC.png 
  226   Fri Sep 15 17:33:35 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook some more RGA data and see that the chamber
has gotten much cleaner since monday. Next
step would be another bake with some focus
 bake5_230915_ArC.pngbake5_230915_ArO.png 
  238   Wed Oct 11 20:47:11 2023 JonUpdateVACVacuum upgrade begins[Jon, Tyler, Aiden, Peter]
Upgrade of the UHV system to a larger
turbo pump began today. After obtaining a
 IMG_0619.pngIMG_0621.pngIMG_0618.png 
  239   Thu Oct 12 12:11:10 2023 AidenUpdateVACVacuum chamber Helium leak test[Aiden, Tyler, Peter, Jon]


Continued
tightening bolts on the turbo pump and 6"-8"
reducer to reduce the leak. The final leak
 IMG_4689.jpgIMG_4688.jpg 
  240   Thu Oct 19 11:41:04 2023 AidenUpdateVACVacuum Chamber Baking Update[Aiden, Tyler, Mohak]

Took some RGA
data when we came into the room. The pressure
of the chamber was 8.63e-8 Torr before turning
 6x 
  245   Thu Oct 26 13:00:45 2023 AidenUpdateVACVacuum Chamber Baking UpdateBake 6 was turned off on Monday. Tooke RGA
data today and have posted the data below.
The pressure of the chamber after taking
 bake6_231026_ArC.pngbake6_231026_ArO.png 
  246   Fri Oct 27 15:16:31 2023 AidenUpdateVACVacuum Leak TestLeak tested the worst flanges on the chamber
after moving it and after bake 6. The 6 inch
flange connected to the 8 inch reducing nipple
  
  248   Mon Oct 30 08:42:22 2023 JonUpdateVACVacuum Leak TestBy 5:30 pm Friday, the pressure had reached
8.6e-8 torr and was continuing to fall. So
it seems we are OK to proceed with permanentizing
 IMG_0659.pngIMG_0660.png 
  251   Tue Oct 31 19:46:35 2023 AidenUpdateVACVAC System Heating UpdateStarted bake 7 on Monday but found issues
with the heating as the cross in front of
the RGA got way too hot too quickly. This
 IMG_4745.jpgIMG_4744.jpg 
  253   Wed Nov 1 20:22:07 2023 AidenUpdateVACVAC System Heating UpdateRaised the PID controller temperature to 105C
today as at that temperature the lid and
the barrel temperature sensors were reading
  
  258   Thu Nov 9 13:48:47 2023 AidenUpdateVACVacuum Chamber Baking UpdateAfter bake 7 was stopped on Wednesday morning
(11,8,2023), I took RGA data of the chamber
to compare to a later scan that will be done
 bake7_231109_ArC.pngbake7_231109_ArO.png 
  261   Fri Nov 10 08:32:34 2023 JonUpdateVACRGA experimentsI ran a 3-minute
degas cycle of the RGA filament for the first
time yesterday (in this process, the filament
  
  264   Mon Nov 13 11:07:50 2023 TylerUpdateVACRTD Analysis
After initial analysis from last week
on a single RTD, I then extended to looking
at all 8 in series with R_ref (set to 1 kOhm).
 Screenshot_2023-11-13_at_11.05.45_AM.pngScreenshot_2023-11-13_at_11.06.04_AM.png 
  266   Tue Nov 14 17:21:40 2023 JonUpdateVACRGA best practicesAs a follow up ELOG 261,
I have received advice from one of the vacuum
experts at LIGO Hanford on best practices
  
  267   Wed Nov 15 21:52:33 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook RGA data before running the degas mode.
Made sure to close off the main volume before
running the degas. And left the filament
 bake7_231115_ArC.pngbake7_231115_ArO.png 
  269   Thu Nov 16 19:32:31 2023 AidenUpdateVACVAC HC Levels UpdateTook some more RGA data today and overlaid
it with data taken from October 19. I added
a red line that symbolizes where all amu
 bake7_231116_ArO.pngNovember_15_Ar_Open_Analyzed.png 
  272   Mon Nov 20 20:37:45 2023 AidenUpdateVACClean and Bake Batch 20[Aiden, Luis]
Started to clean and bake the
macor parts for the FROSTI reflector. Per
LIGO documentation cleaned the macor in liquinox
  
  273   Mon Nov 20 20:45:16 2023 AidenUpdateVACLeak Test
[Aiden, Luis]

Tested every weld
and flange to find leaks. Only found that
the flange on the turbo pump and reducing
  
  280   Wed Nov 29 21:13:32 2023 AidenUpdateVACVAC System Heating UpdateStarted Bake 8 today. Set the PID controllers
to 120 C and will check in the morning for
equilibrium temperatures for the lid and
  
  282   Thu Nov 30 13:58:18 2023 AidenUpdateVACVAC System Heating Update[Aiden]

Came into the lab in the morning
to check on the chamber heating. I decided
to set the PID controllers to 110C rather
  
  283   Sat Dec 2 18:10:23 2023 AidenUpdateVACVAC System Heating Update[Aiden]

Turned off the heating tape
today in anticipation to take more RGA data
on Sunday or Monday morning before the meeting.
  
  284   Mon Dec 4 11:19:50 2023 AidenUpdateVACVacuum Chamber Baking Update[Aiden]

Took some RGA data of the chamber
after it has been cooling down. I do not
believe that this data accurately shows the
 bake8_231204_SSFasteners_ArO.pngbake8_231204_SSFasteners_ArC.pngDecember_04_Ar_Open_Stainless_Steel_Fasteners_Analyzed.pngbake8_231204_SSFasteners_ArO.png 
  286   Thu Dec 7 12:42:42 2023 AidenUpdateVACVacuum Chamber Baking UpdateAfter leaving the RGA on for a few days the
chamber has settled at 2.01 e-8 torr. I also
have good news that the chamber looks to
 December_06_Ar_Open_Stainless_Steel_Fasteners_Analyzed.pngbake8_231206_SSFasteners_ArO.png 
ELOG V3.1.3-7933898