ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Entry  Thu Aug 10 14:36:00 2023, Aiden, Update, VAC, VAC System Heating Update 
    Reply  Thu Aug 10 15:10:12 2023, Jon, Update, VAC, VAC System Heating Update 
Message ID: 201     Entry time: Thu Aug 10 14:36:00 2023     Reply to this: 202
Author: Aiden 
Type: Update 
Category: VAC 
Subject: VAC System Heating Update 
Came in to install one of the Full range gauges. Checked the temperature first of the cross and it was reading 30 C. After installing the gauge above the RGA line the controller was reading 2E-1 torr. Installed the other full range gauge to confirm this and it also read that pressure. There may be a leak so I will let it sit for a bit and then perform a Helium leak test.
ELOG V3.1.3-7933898