547
|
Mon Apr 7 13:28:49 2025 |
Xuesi Ma | Update | | | Test 1: Adapter Board Connected to Filter
Board
Setup:
AI Chassis is powered on. Signal is measured |
    |
|
553
|
Tue Apr 15 11:13:43 2025 |
Xuesi Ma | Update | | | Test 4: AI Chassis ground isolation
Setup: AI Chassis isolated
from the ground with readout directly connected |
  |
|
559
|
Tue Apr 22 12:08:46 2025 |
Xuesi Ma | Update | | | Test 7: Reconnect ribbon cables
Setup: Reconnect all
the ribbon cables, and turned on the AI Chassis |
  |
|
572
|
Tue May 6 13:19:31 2025 |
Xuesi Ma | Update | | | |
 |
|
576
|
Tue May 13 12:35:01 2025 |
Xuesi Ma | Update | | | |
  |
|
579
|
Mon May 19 10:59:14 2025 |
Xuesi Ma | Infrastructure | | |
Status Update
Previous Status: |
|
|
583
|
Tue May 27 12:52:22 2025 |
Xuesi Ma | Update | | | Using the configuration in section 2.11.1
in the Sorensen installation and operation
manual (attached below), I'm able to remote |
6x |
|
586
|
Tue Jun 3 11:54:06 2025 |
Cece Ochoa | Update | | CE Cavity Design Update | Update on the design for the CE Cavity Mirrors |
|
|
588
|
Tue Jun 3 13:08:47 2025 |
Xuesi Ma | Update | | | We currently have the parts for a DB9 connector
but need parts for a DB25 connector, where
did we get the parts for the DB9 connector? |
 |
|
589
|
Tue Jun 3 13:16:53 2025 |
Xuesi Ma | Infrastructure | | |
Date and Time:
Around 3:50 PM on June 2, 2025
Location and Temperature: |
    |
|
591
|
Tue Jun 10 12:13:00 2025 |
Xuesi Ma | Update | | |
By measuring the resistance of the
ladder, I obtained a graph of resistance
as a function of voltage. |
  |
|
594
|
Tue Jun 17 12:22:43 2025 |
Xuesi Ma | Update | | |
|
12x |
|
596
|
Tue Jun 24 11:50:15 2025 |
Xuesi Ma | Update | | |
|
   |
|
603
|
Tue Jul 1 13:41:36 2025 |
Xuesi Ma | Update | | | [Ma, Liu]
Slides |
|
|
610
|
Mon Jul 14 23:50:22 2025 |
Tyler | Update | | Cymac ADC update | I've been looking into the performances
of individual channels on the Cymac by computing
their individual PSDs and corresponding CSDs |
 |
|
613
|
Tue Jul 15 11:47:53 2025 |
Xuesi Ma | Infrastructure | | |
Date and Time:
Around 4:50 PM on July 1, 2025
Location and Temperature: |
   |
|
620
|
Thu Jul 31 14:26:58 2025 |
Xuesi Ma | Update | | | [Tyler, Ma, Christina, Maple, Cece, Mary,
Pooyan, Audrey]
We started by cleaning outside of |
|
|
621
|
Tue Aug 5 11:25:17 2025 |
Mary | Update | | point absorber and coated aperture in A# | Simulating how point absorber defects on
Advanced LIGO mirrors affect cavity performance
by modeling a 4km LIGO-like arm cavity with |
|
|
623
|
Wed Aug 6 16:31:37 2025 |
Xuesi Ma | Update | | |
Date and Time:
Around 4:20 PM on Auguest 6, 2025
Location and Temperature: |
    |
|
626
|
Tue Aug 12 12:35:19 2025 |
Tyler | Update | | CyMAC ADC Update | [Christina, Ma, Tyler]
Updated CyMAC
measurement, comparing 260 hrs of measurement
time vs. 405 hrs. |
 |
|
629
|
Tue Aug 12 13:46:56 2025 |
Christina | Update | | | |
 |
|
630
|
Tue Aug 12 13:49:24 2025 |
Mary | Update | | point absorber and coated aperture in A# | |
|
|
638
|
Tue Sep 2 12:34:02 2025 |
Xuesi Ma | Update | | Updata for self heating effect on HOM | https://docs.google.com/presentation/d/19I1fx5BLEzYb4Qnc9P4rJnYAvWI8NqE2dsj9gSPyYzg/edit?usp=sharing |
|
|
641
|
Tue Sep 9 12:01:38 2025 |
Tyler, Ma | Update | | | Slides |
|
|
644
|
Tue Sep 9 13:08:44 2025 |
Xuesi Ma | Update | | | Slides |
|
|
671
|
Thu Jan 22 13:12:29 2026 |
Mary | Update | | | |
    |
|
675
|
Thu Jan 29 12:46:22 2026 |
Cece Ochoa | Update | | CE Cavity Design Update (4) | Update for CE Cavity Arms + Modes
https://docs.google.com/presentation/d/1-dXYylkAbNpHR4WVCx9Q8ryL_xGlH-JSSLXEUQg6b7Q/edit?usp=sharing
|
|
|
684
|
Thu Feb 12 12:59:29 2026 |
Mary | Update | | | |
|