ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 14 of 14  Not logged in ELOG logo
Entry  Mon Apr 7 13:28:49 2025, Xuesi Ma, Update, ,  20250403_151946.jpgELOG_Spike_adapter_filter_on.png20250404_143624.jpgELOG_Spike_adapter_isolate.png20250407_105846.jpg
Test 1: Adapter Board Connected to Filter Board

  Setup: AI Chassis is powered on. Signal is measured directly from
the adapter board. All other ports on the adapter board are connected to the filter board.
  Observation: Two distinct spikes
observed at the beginning of the measurement.


Test 2: Adapter Board Disconnected from Filter Board

  Setup:
Entry  Tue Apr 15 11:13:43 2025, Xuesi Ma, Update, ,  20250414_120428.jpg20250414_120423.jpg20250411_163105.jpg
Test 4: AI Chassis ground isolation

  Setup: AI Chassis isolated from the ground with readout directly connected to
adapter board
  Observation: No spike observed.


Test 5: Ribbon cable check

  Setup:
AI Chassis remains isolated from the ground. The signal is measured after the ribbon cable. (Attachment 3)
  Observation: No
Entry  Tue Apr 22 12:08:46 2025, Xuesi Ma, Update, ,  20250415_161755.jpg20250416_174640.jpg20250422_105614.jpg
Test 7: Reconnect ribbon cables

  Setup: Reconnect all the ribbon cables, and turned on the AI Chassis while isolated
rack
  Observation: No spike observed.


Test 8: Reconnect to rack

  Setup:
Reconnect the AI Chassis to the rack.
  Observation: No spike observed.


Test 9: Restore to original position.

Entry  Tue May 6 13:19:31 2025, Xuesi Ma, Update, ,  resistance_vs_time_RV_rise_time_24.pdfresistance_vs_time_all_channels_all_time_RV.pdf
 
Entry  Tue May 13 12:35:01 2025, Xuesi Ma, Update, ,  resistance_vs_voltage_all.pdfresistance_vs_voltage_overlay.pdfresistance_vs_time_all_channels_all_time_RV.pdf
 
Entry  Mon May 19 10:59:14 2025, Xuesi Ma, Infrastructure, ,  


  Status Update

  Previous Status:
  All Sorensen power supplies were turned off. The Cymac system was down (all chassis were offline).
  
    If you need more information or assistance in turning them back on, please contact Xuesi Ma.
  
Entry  Tue May 27 12:52:22 2025, Xuesi Ma, Update, ,  6x
Using the configuration in section 2.11.1 in the Sorensen installation and operation manual (attached below), I'm able to remote control the Sorensen
power supply. 
I use DAC VEXC8 as the external voltage source and a breakout board to match the configuration of connector J3.
Entry  Tue Jun 3 11:54:06 2025, Cece Ochoa, Update, , CE Cavity Design Update CE_Arm_Cavity_.pdf
Update on the design for the CE Cavity Mirrors
Entry  Tue Jun 3 13:08:47 2025, Xuesi Ma, Update, ,  934.jpg933.jpg
We currently have the parts for a DB9 connector but need parts for a DB25 connector, where did we get the parts for the DB9 connector? We may be able
to use the same company for the DB25 connector.
Also need a cable for the connectors. Find a DB9 to DB9 cable in 1129, not sure if I can disassemble it and use just the cable.
Entry  Tue Jun 3 13:16:53 2025, Xuesi Ma, Infrastructure, ,  928.jpg929.jpg931.jpg930.jpg932.jpg

    Date and Time: Around 3:50 PM on June 2, 2025
    Location and Temperature:
    
        Back of the room 1119, around the working station: 86 °F
        Front of the room 1119, around the doorway: 84.1
Entry  Tue Jun 10 12:13:00 2025, Xuesi Ma, Update, ,  resistance_vs_voltage.pdfresistance_vs_voltage_element_5.pdfresistance_vs_time_all_channels_all_time_RV.pdf

  By measuring the resistance of the ladder, I obtained a graph of resistance as a function of voltage.
  All the heater elements behave consistently, showing only a small standard deviation.
  However, heater element 5 shows a significantly larger standard deviation.
Entry  Tue Jun 17 12:22:43 2025, Xuesi Ma, Update, ,  12x



    
    
    CYMAC
Remote Control Cable Documentation
    
        .connector {
            background-color: #f8f9fa;
            border-left: 4px solid
#3498db;
            padding: 10px 15px;
            margin: 15px 0;
        }
        .pin-table {
            width: 100%;
            border-collapse:
Entry  Tue Jun 24 11:50:15 2025, Xuesi Ma, Update, ,  resistance_vs_time_all_channels_channel_switch.jpgresistance_vs_time_all_channels_channel_switch_one_cycle_before.jpgresistance_vs_time_all_channels_channel_switch_one_cycle_after.jpgresistance_vs_voltage.jpg



    
    
    Heater
Element Resistance Test Results
    
        .heater-test-container {
            font-family: Arial, sans-serif;
            line-height:
1.6;
            max-width: 800px;
            margin: 20px auto;
            padding: 20px;
            color: #333;
        }
        .heater-test-container
Entry  Tue Jul 1 13:41:36 2025, Xuesi Ma, Update, ,  
[Ma, Liu]
 Slides
Entry  Mon Jul 14 23:50:22 2025, Tyler, Update, , Cymac ADC update cymac_ADC_PSDs.pdfch35_ADC_comps.pdf
 I've been looking into the performances of individual channels on the Cymac by computing their individual PSDs and corresponding CSDs that show their
noise relation to each other. It appears some channels do have lower noise floors than others, and some combinations of these actually  do  perform
similar to the Red Pitaya (showing below the CSD between CHs 3 and 5), although it doesn't look like it's much of an improvement. The best method as of
Entry  Tue Jul 15 11:47:53 2025, Xuesi Ma, Infrastructure, ,  20250701_165118.jpg20250701_165200.jpg20250701_165329.jpg20250701_165246.jpg

    Date and Time: Around 4:50 PM on July 1, 2025
    Location and Temperature:
    
        Back of the room 1119, around the working station: 85.7 °F
        Front of the room 1119, around the doorway:
Entry  Thu Jul 31 14:26:58 2025, Xuesi Ma, Update, ,  2025-08-07_cleanroom_chart.png
[Tyler, Ma, Christina, Maple, Cece, Mary, Pooyan, Audrey]
We started by cleaning outside of the cleanroom wiping down the cable channel and working our way down while taking the pre-cleaning measurement.
We then stated wiping down the inside of clean room and vacuumed, mopped the outside of the cleanroom. Finally, we vacuumed, mopped, and wiped down the
Entry  Tue Aug 5 11:25:17 2025, Mary, Update, , point absorber and coated aperture in A# point_absorber_A#.pdf
Simulating how point absorber defects on Advanced LIGO mirrors affect cavity performance by modeling a 4km LIGO-like arm cavity with a point absorber
fixed at 5cm off-center on the ITM. In this simulation, displaced the laser beam across a 21×21 grid while calculating the deformation, then measuring
the resulting power loss in the cavity (~283W circulating power).
Entry  Wed Aug 6 16:31:37 2025, Xuesi Ma, Update, ,  941.jpg942.jpg943.jpg945.jpg946.jpg

    Date and Time: Around 4:20 PM on Auguest 6, 2025
    Location and Temperature:
    
        Back of the room 1119, around the working station: 90.2 °F
        Front of the room 1119, around the doorway:
Entry  Tue Aug 12 12:35:19 2025, Tyler, Update, , CyMAC ADC Update CSD_magnitude.pngchi_sq.png
[Christina, Ma, Tyler]

 Updated CyMAC measurement, comparing 260 hrs of measurement time vs. 405 hrs.
Entry  Tue Aug 12 13:46:56 2025, Christina, Update, ,  3.png3-1.png
 
Entry  Tue Aug 12 13:49:24 2025, Mary, Update, , point absorber and coated aperture in A# Aug12.pdf
 
Entry  Tue Sep 2 12:34:02 2025, Xuesi Ma, Update, , Updata for self heating effect on HOM 
https://docs.google.com/presentation/d/19I1fx5BLEzYb4Qnc9P4rJnYAvWI8NqE2dsj9gSPyYzg/edit?usp=sharing
Entry  Tue Sep 9 12:01:38 2025, Tyler, Ma, Update, ,  
Slides
Entry  Tue Sep 9 13:08:44 2025, Xuesi Ma, Update, ,  
Slides
Entry  Thu Jan 22 13:12:29 2026, Mary, Update, ,  PA_matem2.pdfPA_maxtem6.pdfmaxtem600.jpgmaxtem2dis.jpgdismaxtem6.jpg
 
Entry  Thu Jan 29 12:46:22 2026, Cece Ochoa, Update, , CE Cavity Design Update (4) 
Update for CE Cavity Arms + Modes 


https://docs.google.com/presentation/d/1-dXYylkAbNpHR4WVCx9Q8ryL_xGlH-JSSLXEUQg6b7Q/edit?usp=sharing  
Entry  Thu Feb 12 12:59:29 2026, Mary, Update, ,  SB_scattering.pdf
 
ELOG V3.1.3-7933898