ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 13 of 13  Not logged in ELOG logo
Entry  Thu Jan 26 18:58:25 2023, Aiden, Update, General, Oven Heating 
Aiden cleaned the oven with methanol again and set the oven to 260 degC for 12 hours.
Entry  Mon Jan 23 17:26:15 2023, Peter Carney, Update, General, Oven cleaning 
Aiden and Cao 
Turned on the oven to 120 deg C for 12 hours. After 12 hours, put it at 200 deg C for 48 hours. 
Entry  Wed Jan 18 22:06:05 2023, Julian, Update, ELOG, Cleanroom Update 
I wiped down all the inner walls of the cleanroom using alcohol wipes, as per Cao's instruction.
Entry  Wed Dec 14 18:34:33 2022, Jon, Configuration, Electronics, Adapter for 532 nm laser power supply laser_power.png
I installed an EU-to-US plug adapter for the 532nm laser's 9V power supply. I then re-measured the laser's power with the correct supply voltage (previously
we had been using a 6V supply). At 9V, the max power is 0.83 W, so the laser is confirmed to be Class 2 as labeled.
Entry  Wed Dec 14 17:35:41 2022, Jon, Infrastructure, Computers, Windows Laptop laptop.png
I set up the new Windows 10 laptop (pictured below), which arrived yesterday. This laptop is intended to be used for running lightweight Windows-only
programs, such as the Thorlabs beam profiler software or the SRS RGA client. However, none of that software is installed yet.
Configuration details
As usual, the computer is configured with one shared account (username: controls) and the standard password. Note
Entry  Mon Nov 28 18:10:23 2022, shane, Update, ELOG, Particle counts in the clean room clean_room_particle_counts_11_28_-_Sheet1.pdf
Particle count stats for the clean room Nov 28, 2022: 
Took 10 sample runs in each of 5 regions in the clean room (5 runs per region with a person inside
the clean room for the measurement, and 5 runs per region without anyone in the clean room for the measurement), for a total of 50 samples taken. Sample
time was 60 seconds. Overall clean room average particle count for the size ranges are as follows:
0.3 micrometers- 3405.76 (room occupied), 974.92 (room
Entry  Mon Oct 3 17:21:39 2022, Cao, Update, TCS, Inspection of macor parts 7x
The macor parts arrived and inspected today. These include:


 Macor spacer (drawing:  LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf 
attached below), quantities: 40

 No defects, damages observed 
 Parts are free from grease/ machining fluid 
 Wall thickness
of 1 mm appear to provide sufficient stiffness to part 
 Images of parts:  Macor_spacer_0.jpg, Macor_spacer_1.jpg  


Entry  Wed Aug 17 16:04:30 2022, Phoebe Zyla, Summary, Lore, Testing the Cartridge Heater and Collecting FLIR Data Screenshot_(74).pngScreenshot_(75).pngScreenshot_from_2022-08-15_11-24-40.pngAcquisitionImage(Aug-15-2022_14_16).jpg
We have tested the heater to find emissivity, mounted the heater system to the optical table, and have taken irradiance maps of the heater projected
onto the screen. 

The heater's emissivity was determined by using a thermocouple in conjunction with the FLIR's temperature calibration. To attach
the thermocouple to the heater initially, I used Kapton tape and ran both the wires of the heater and the thermocouple through the heater bridge. This
Entry  Tue Jul 26 14:10:35 2022, Cassidy, Update, Cameras, Optical Post Replacement and Realignment YAxisAlignment.pngXRotZAlignment.pngNewOpticalPost.png
Today I replaced the 3" optical post that the camera rests on with a 2" optical post in order for the screen to correctly fill out the camera's FOV. The
3" post is now in the glass optics cabinet next to the FLIR camera configuration box, wrapped in the protective materials from the 2" post for safekeeping.


There were no issues with the physical replacement of the post, except that the fork clamp on the post needs to be on one of the perpendicular,
Entry  Fri Jul 22 13:20:28 2022, Phoebe, Update, , Comsol 
I will be using comsol until 1:30 pm today. I will be updating the model for the heater mount to be thicker in certain areas, so that it can feasibly be
3D printed. Specifically, the radius of the center cartridge mount has been increased to add thickness to the pipe and the arms of the bridge. This will
allow us to print with a much smaller chance for error, as the printer can print objects with a minimum length of 1 mm. 
Entry  Mon Jul 11 14:29:45 2022, Jon, Omnistructure, General, HEPA filter installed IMG_1530.png
Today I unpacked and installed the new HEPA filter for the lab. It is an Omni CleanAir OCA1210 capable of 1200 CFM. This flow rate is sufficient to turn
over the air in the room once every 4 minutes, or 14 times per hour. Hopefully this will cut down on our particulate accumulation issues.
Entry  Tue Jun 21 18:31:49 2022, Cassidy and Phoebe, Update, Cameras, IR Absorbing Screen and FLIR Camera Setup IMG_6751.pngIMG_1146.pngIMG_6756.png
Today we set up the IR absorbing screen and the camera on the optical table, as well as tested that the camera was functioning as expected (picking up heat
sources beyond the screen).

Screen Setup
The screen was set up by clamping it between two rectangular posts on each side. First, two posts
were set up with 22 in. between them (thus allowing the screen to span a total distance of up to 24 in. when clamped down). To best stabilize the screen
Entry  Thu Jun 2 21:55:02 2022, Jon, Update, Cameras, FLIR Camera Setup IMG_1473.pngIMG_1474.png
The new FLIR A70 infrared camera has arrived. Tyler and I unpacked it in the lab yesterday. In less than an hour, we succeeded in powering it on and
connecting it to the lab network. We have assigned it the static IP address 192.168.1.6.

Online Configuration Portal
The FLIR camera can be configured, as well as stream live data, through a web browser interface. It can
    Reply  Fri Jun 3 13:03:33 2022, Jon, Update, Cameras, FLIR Camera Setup 
Summary
I have installed the requisite software on chimay for interfacing the FLIR A70 camera in Python. There are two packages required from
FLIR:

Spinnaker SDK, which provides the low-level camera drivers and a C/C++ API.
       Reply  Mon Jun 6 17:11:48 2022, Jon, Update, Cameras, FLIR Camera Setup IMG_1480.pngIMG_1481.png
Today I tested the Spinnaker/PySpin software installations (detailed in ELOG #4) with the FLIR
camera connected to chimay. It works!
Example codes
I was able to run several of the PySpin example codes. In particular, there is one which connects to the camera and streams
Entry  Thu Jun 2 16:14:58 2022, Jon, HowTo, General, Custom conda environment on JupyterHub 
Cross-linking instructions: How to run a Jupyter notebook in your custom Conda environment
Entry  Sun Apr 10 15:39:49 2022, Rutuja Gurav, HowTo, Computer Scripts/Programs, HowTo: Renew the Let's Encrypt SSL certificate using certbot 
Port 80 is kept closed by default. This might be causing the certbot auto-renewal cronjob to fail. Therefore we must renew the certificate manually.
Step 1: Open port 80. (This is needed as the certificate renewal process runs some tests which requires client communication over
ELOG V3.1.3-7933898