ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 12 of 12  Not logged in ELOG logo
Entry  Mon Apr 7 13:28:49 2025, Xuesi Ma, Update, ,  20250403_151946.jpgELOG_Spike_adapter_filter_on.png20250404_143624.jpgELOG_Spike_adapter_isolate.png20250407_105846.jpg
Test 1: Adapter Board Connected to Filter Board

  Setup: AI Chassis is powered on. Signal is measured directly from
the adapter board. All other ports on the adapter board are connected to the filter board.
  Observation: Two distinct spikes
observed at the beginning of the measurement.


Test 2: Adapter Board Disconnected from Filter Board

  Setup:
Entry  Tue Apr 15 11:13:43 2025, Xuesi Ma, Update, ,  20250414_120428.jpg20250414_120423.jpg20250411_163105.jpg
Test 4: AI Chassis ground isolation

  Setup: AI Chassis isolated from the ground with readout directly connected to
adapter board
  Observation: No spike observed.


Test 5: Ribbon cable check

  Setup:
AI Chassis remains isolated from the ground. The signal is measured after the ribbon cable. (Attachment 3)
  Observation: No
Entry  Tue Apr 22 12:08:46 2025, Xuesi Ma, Update, ,  20250415_161755.jpg20250416_174640.jpg20250422_105614.jpg
Test 7: Reconnect ribbon cables

  Setup: Reconnect all the ribbon cables, and turned on the AI Chassis while isolated
rack
  Observation: No spike observed.


Test 8: Reconnect to rack

  Setup:
Reconnect the AI Chassis to the rack.
  Observation: No spike observed.


Test 9: Restore to original position.

ELOG V3.1.3-7933898