  254   Thu Nov 2 17:14:36 2023 Shane, Jon UpdateCDSCyMAC set up permanentized



CyMAC connections
have been finalized and made permanent. Also
tested voltages, which are all looking good.
 cymac_chassis_back.jpegcymac_chassis_back2.jpegcymac_chassis_front.jpegfinal_connections_back_of_power_supply.jpegpower_supply_back.jpeg 
  265   Mon Nov 13 11:23:54 2023 Jon UpdateCDSCyMAC testing[Jon, Shane, Luis]
My repair of the internal ribbon
connecting the ADC to the adapter board resolved
 Cymac_GDS_Diagnostics.png 
  276   Wed Nov 22 15:46:50 2023 ShaneUpdateCDSDB25 signal connections for FROSTI heaters


[Shane,
Jon]

Installed new DC smart switch in electronics
 DB25input_signals.pdfIMG_3137.jpegdc_smart_switch_signal_connections.jpeg 
  277   Thu Nov 23 12:34:44 2023 JonUpdateCDSDB25 signal connections for FROSTI heatersUpdate: I was able to put the
FROSTI power controller on the lab network.
It is connected to the switch in the top
  
  285   Mon Dec 4 21:27:53 2023 ShaneUpdateCDSADC-DAC loopback test resultsHere are the test results from today's ADC-DAC
loopback tests. Channels 14 and 15 were the
only ones behaving abnormally. Not sure what
 adc-dac_loopback_testing_results.pdf 
  290   Mon Dec 11 12:58:57 2023 Shane, LuisUpdateCDSDAC-ADC loopback test debugging[Luis, Shane]

Working on debugging last
week's weird results for the ADC-DAC loopback
test for channels 14 and 15. With DAC output
  
  312   Wed Jan 31 14:37:26 2024 ShaneSummaryCDSpath directions for CyMAC model and parts libraryPath to cds parts library in Matlab simulink:
/usr/share/advligorts/src/src/epics/simLink.
File name CDS_PARTS.mdl
Path to user models:
  
  313   Fri Feb 2 16:56:56 2024 JonUpdateCDSRTS model implemented for FROSTI RTD readoutsSummary
Today I finished implementing
an RTS model to read out the integrated FROSTI
RTDs (temperature sensors) via the CyMAC.
 sitemap_screen.png 
  329   Mon Feb 19 14:40:21 2024 ShaneUpdateCDSMEDM screen for FROSTI temp readoutsHere's the latest draft of the MEDM screen
for the FROSTI heating elements' temperature
readouts. Note that the MEDM screen isn't
 IMG_6094.jpegIMG_6092.jpeg 
  337   Fri Feb 23 15:01:48 2024 ShaneUpdateCDSLatest draft of MEDM screen for FROSTI readoutsHere's the latest draft of the MEDM screen
for the FrOSTI temp and power readouts. Also,
debugged the text readout boxes so they're
 IMG_6128.jpg23.jpg 
  346   Thu Feb 29 17:16:48 2024 ShaneUpdateCDSMEDM screen for FROSTI T/P readoutsHere's the latest draft of the MEDM screen
for the FROSTI temp and power readouts, now
with a button linking to the c1msc file display.
 IMG_6259.jpeg 
  365   Tue May 7 20:34:31 2024 shaneUpdateCDSfrosti MEDM screen update[Luis, Shane]
Here is the updated MEDM screen,
with new orientation and updated labeling
to reflect the actual positions of the heater
 FROSTIMEDMMay7.2024.png 
  398   Mon Jul 8 17:01:45 2024 ShaneUpdateCDSNew CyMAC internal layout[Jon, Shane]

Internal layout of CyMAC has
been updated (labeled image attached) to
accommodate the replacement of the two ribbon
 updated_cymac.jpeg 
  399   Tue Jul 9 18:19:50 2024 ShaneUpdateCDSADC-DAC loopback testing and IOLAN installation[Shane, Jon]

Finished ADC-DAC loopback
testing today (see attached xlsx file or
access directly here).
 iolanServerTerminal.jpegADC-DAC_Loopback_Testing.xlsxupdatedc1msc.jpeg 
  410   Tue Jul 16 18:43:07 2024 ShaneUpdateCDSADC-DAC loopback testing and IOLAN installation
UPDATE: 
Follow up ADC-DAC loopback testing
now complete, matching all the ADC channels
to a single DAC channel, and then matching
 Follow-up_ADC-DAC_Loopback_Testing.xlsx 
  419   Fri Aug 2 13:50:22 2024 ShaneUpdateCDSSerial Comm. Test (Agilent Turbo Pump)Did a brief communication test with the agilent
turbo pump today, to see if we could get
serial communications up and running for
 pinouts.jpeg 
  434   Tue Sep 3 18:24:17 2024 TylerUpdateCDSCymac Timing Chassis Issue[Tyler, Jon]


The timing chassis used
for the cymac has been shut off due to an
unknown issue causing its supplied current
  
  Draft   Tue Oct 1 19:41:23 2024 ShaneUpdateCDSCyMAC Timing Chassis Issue[Shane, Luis]


Summary of the issue we've
been having with the timing chassis: when
we connect only the Valon 5015 to power,
 IMG_5917.jpegIMG_5803.jpegIMG_5804.jpeg 
  461   Thu Oct 17 13:24:23 2024 ShaneUpdateCDSTiming Chassis issue identified



[Ma,
Luis, Shane]

Working theory for the
timing chassis issues had been that the 1A
 IMG_6462.jpegIMG_6464.jpeg 
  465   Fri Oct 25 10:56:30 2024 ShaneUpdateCDSTiming Chassis fixed and reinstalled


[Ma, Shane]

We
replaced the 1A breaker in the timing chassis
today with a 4A one, and tested that all
 successful_timing.jpeg 
  473   Thu Nov 14 11:58:05 2024 ShaneUpdateCDSTurbo pump connection troubleshootingAttempted connection to the TV551 turbo pump
through Varian/Agilent's software on spica.
Successful connection established, and we
  
  484   Wed Dec 4 16:01:23 2024 ShaneUpdateCDSVac serial interfacing troubleshooting updateUpdate on the issue with serial interfacing
for the TV 551 turbo pump: Tried a new test
today, to see if the commands being sent
  
  505   Tue Jan 28 13:30:46 2025 shaneUpdateCDSSerial comms testing updateAttempted to communicate with the smaller
vac pump (TwissTor 74) via Agilent software
today. Was able to communicate with the pump
  
  518   Wed Feb 19 13:44:48 2025 ShaneUpdateCDSVac serial interfacing update


[Jon, Shane]



Debugging update for vac system serial
communications: we were able to successfully
  
  527   Thu Feb 27 18:22:21 2025 ShaneUpdateCDSOngoing work in server rack and desk area (1119)As part of the vacuum communications debugging
process, there is ongoing work in the server
rack and desk area in 1119. Please be careful
  
  532   Tue Mar 4 10:47:03 2025 ShaneUpdateCDSVac system pinoutsAttached here are the pinouts, as we currently
know them, for the vacuum system. The three
items focused on here are the Agilent TwissTorr
 vac_pinouts_1.jpegvac_pinouts_2.jpeg 
  533   Wed Mar 5 12:16:28 2025 ShaneUpdateCDSVac system communications update

[Shane, Jon]

Update on the serial interfacing
with the vacuum system: both turbo pumps
  
  534   Wed Mar 5 18:13:20 2025 ShaneUpdateCDSvac system comms

[Shane, Jon] 

Update on the serial interfacing with
the Inficon VGC503 pressure gauge: We began
  
  535   Mon Mar 10 17:03:52 2025 ShaneUpdateCDSPressure Gauge successful connectVac system serial interfacing update: the
pressure gauge is now able to communicate
successfully through the code. It's been
  
  546   Thu Apr 3 13:23:37 2025 shaneUpdateCDSUPS interfacingUpdate on UPS serial interfacing: the driver
for the UPS webcard has been installed on
spica (for UPS1 in room 1119) and logrus
  
  565   Wed Apr 30 13:42:45 2025 ShaneUpdateCDSUPS comms successfulUpdate on UPS1 serial interfacing: communication
is now successful. On 4/15/25 we connected
to UPS1 via ethernet rather than USB, and
  
  570   Tue May 6 12:25:03 2025 TylerConfigurationCDSCymac ADC CSD measurementAn initial measurement of the cymbal ADC CSD
is attached below. As of now, it seems that
the sensitivity limit is roughly the same
 cymac_adc_rin_v1.pdf 
  585   Tue Jun 3 11:50:08 2025 PooyanUpdateCDSCDS updateThere are three major issues with the lab's
CDS system that should be addressed. They
are ordered from the highest priority to
  
  590   Tue Jun 10 12:11:14 2025 PooyanUpdateCDSCDS update
The MEDM models issue was fixed.
The issue was that building the c1msc model
alone was not enough and we had to re-build
  
  592   Wed Jun 11 16:19:37 2025 PooyanUpdateCDSCDS update
Fast channels recorded to .gwf frame
files

Had to add a DAQ Channels
block to the c1msc model for those channel
 Screenshot_20250611_154834.pngf3k.pdf 
  635   Tue Aug 26 12:45:41 2025 Christina, Ma, TylerUpdateCDSRIN UpdateSlides   
  8   Fri Jul 22 13:20:28 2022 PhoebeUpdate ComsolI will be using comsol until 1:30 pm today.
I will be updating the model for the heater
mount to be thicker in certain areas, so
  
  37   Tue Feb 28 19:33:51 2023 PeterUpdate 532 M2 MeasurementsY axis of plot in units of micrometers. X
axis in units of millimeters. 
  
  46   Wed Mar 8 18:35:52 2023 PamellaUpdate Lab cleaning Today Pamella finished cleaning of the cleanroom,
starting with the HEPA vacuuming,  mopping
and clearing all floor with IPA wipes. 
Also
  
  371   Fri May 31 19:37:47 2024 LukeUpdate Vacuum chamber Disassembly [Luke, Aiden, Jon, Michel, Tyler]

Work
done:
On Tuesday (5/28) we removed the RGA
line with minimal difficulty. On Wednesday
 IMG_1681.jpgIMG_1680.jpgIMG_1680.jpgIMG_1681.jpg 
  378   Wed Jun 19 18:45:14 2024 LukeUpdate Vacuum chamber reassembly [Luke, Aiden, Mohak , Tyler]

On Tuesday
we had the silver screws for the spherical
cube shortened by a quarter of an inch so
 image_2024-06-19_182556383.pngimage_2024-06-19_182631737.pngIMG_1710.jpg 
  423   Mon Aug 12 16:35:30 2024 Luke Update Ringheater modeling Update   HR_surface_deformation.pngIrradiation_pattern_input.pngHR_surface_deformation_other.png 
  451   Wed Oct 2 10:31:46 2024 Xuesi MaConfiguration Group Meeting Slides 10/2/2024
Group Meeting slides for Non-deterministic
Heater Response.
 Group_Meeting_10_2.pdf 
  452   Wed Oct 2 12:05:42 2024 Luke Update Ringheater modeling UpdatePower
point slides
  
  455   Wed Oct 2 14:49:59 2024 LiuUpdate FROSTI ETM actuationProposed FROSTI ETM actuation on the HOM7
resonance.  

Animation
  
  460   Wed Oct 16 14:13:31 2024 LiuUpdate FROSTI with non uniform absorption scattering sourcesSlides   
  Draft   Wed Oct 23 12:33:54 2024 Luke Update Zernike calculation updatePowerPoint
slides new

PowerPoint
  
  503   Mon Jan 27 11:29:38 2025 Xuesi MaUpdate Heater Element Test[Ma, Cece, Luke, Mary, Shane]

On Friday (Jan 24), we installed
the heater elements on the stand. The heater
 20250124_165434.png20250124_165342.png20250214_132811.jpg 
  504   Mon Jan 27 23:35:28 2025 Xuesi MaUpdate  [Ma]
Installed all the pins to the peek
DB 25 connectors
 20250127_142647.jpg20250127_153454.jpg20250127_154516.jpg 
  506   Fri Jan 31 15:03:09 2025 Xuesi MaUpdate Heater Element Circuit Check