ID |
Date |
Author |
Type |
Category |
Subject |
Text |
|
36
|
Tue Feb 28 19:31:05 2023 |
Peter | Update | VLC Electronics | 532 M2 Measurements | Took M2 measurements today. Configuration:
Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm)
at 200mm, camera at 350mm. The laser beam |
|
37
|
Tue Feb 28 19:33:51 2023 |
Peter | Update | | 532 M2 Measurements | Y axis of plot in units of micrometers. X
axis in units of millimeters. |
|
48
|
Thu Mar 9 12:03:59 2023 |
Peter | Update | VLC Electronics | 532 M2 Measurements | Took more M2 Data today. Picture of the optical
set up is shown below. lens1 f = 100mm, lens2
f = 50mm, lens3 f = 150mm. There was a nice |
|
50
|
Fri Mar 10 12:08:09 2023 |
Peter | Update | VLC Electronics | 532 M2 Measurements | Took more M2 laser data today. The configuration
is the same as before except now the beam
camera is the only component moving. Pictures |
|
61
|
Tue Apr 4 09:39:58 2023 |
Peter | Update | VLC Electronics | 532 M2 Measurements | Final M squared measurements were taken Wednesday,
3/29/23 by Peter and Ryan Hinosawa. 5 separate
sets of data were taken, and upon discussion, |
|
230
|
Fri Sep 29 11:53:54 2023 |
Shane | Update | Cleanroom | 5 zone particle count measurement in cleanroom | Today's 5 zone measurement of cleanroom particulate
concentration is attached |
|
270
|
Fri Nov 17 14:06:01 2023 |
Shane | Update | Cleanroom | 5 zone particle count | Here's today's 5 zone particle count measurement
for the cleanroom. Zone 5 (closest to back
wall by fire cabinet) is still above the |
|
260
|
Thu Nov 9 19:06:46 2023 |
shane | Update | Cleanroom | 5 zone cleanroom measurement | Here's today's five zone measurement, taken
~5 hours after the cleaning. Zone 5 (closest
to fire cabinet and back wall) is a bit over |
|
314
|
Fri Feb 2 19:08:20 2024 |
Aiden | Update | VAC | 1st Hot Element RGA Scan | Here are the measurements for the RGA scan
of the elements while on at around 160C.
The pressure of the chamber during the test |
|
274
|
Tue Nov 21 14:47:24 2023 |
Tyler | Update | Lore | 1129 Workbench Assembly Update 1 |
[Tyler, Shane, Mohak, Cynthia, Luke,
Michael, Luis]
Started assembly of the workbench |
|
278
|
Mon Nov 27 14:22:30 2023 |
Tyler | Update | Lore | 1129 Assembly Update | [Tyler, Michael, Luke, Cynthia]
The
tabletops have been attached to the workbench
frames. Unfortunately, one of the tabletops |
|
75
|
Fri Apr 21 15:21:18 2023 |
Pamella | Update | FLIR | | FLIR project updates
01:50 pm: Starting test position 34 mm distance
to black wall.
Parameters : |
|
249
|
Mon Oct 30 11:03:56 2023 |
Tyler | Update | Scripts/Programs | |
FLIR: After some adjustments, the plot
generated from the FLIR measurements look
much more symmetric (see attachment). There |
|
299
|
Mon Jan 8 20:24:53 2024 |
Aiden | Update | General | | [Jon, Aiden]
Installed the heater elements
into their fixture and prepped the cables
by twisting the wires into pairs. We also |
|
306
|
Tue Jan 16 16:11:41 2024 |
Aiden | Update | VAC | | [Aiden,Luis]
Below is the data for the
most recent bake. I believe the chamber is
cleaner than it is actually showing as the |
|
391
|
Mon Jul 1 11:45:45 2024 |
Sid | Update | Interferometer Simulations | | Progress update: Most of last week was spent
getting set up with SIS, and learning how
to do basic simulations. The goal for this |
|
421
|
Tue Aug 6 13:07:07 2024 |
Xuejun | Update | Interferometer Simulations | | [Xuejun]
The width and location of
the measured in-air change in temperature
profile has been determined to be 0.045m |
|
471
|
Wed Nov 13 14:06:00 2024 |
Luke | Update | General | | slides |
|