Entry  Wed Nov 8 17:55:49 2023, Jon, Update, General, Lab Clean-Up Day 1 
[Jon, Tyler, Shane, Peter, Luis]
Today we completed the first phase of lab clean-up. Activities included:

CF/KF parts stored under the cleanroom table were removed and transferred to Physics 1129
Cleanroom workbench cleared, with all
Entry  Tue Mar 4 03:05:42 2025, Xuesi Ma, Update, ELOG, LOG 
1424564097.243212 2025/02/26 00:14:39 UTC Time start
12V 2A right after start all 8 elements
1424564478.079428 2025/02/26 00:21:00 UTC Time stop
Entry  Mon Jul 31 12:39:01 2023, Shane, Update, Electronics, LED cable assemblies installed  IMG_8514.jpegIMG_8516.jpeg
Today I put together the two LED cable assemblies for the CyMAC and mounted them in the anti-aliasing and anti-imaging chassis.
Entry  Tue Jun 27 14:04:42 2023, Sophia A. , Update, Measuring Noise in Interferometer, Interferometer set up and connection to red pitaya IMG_6756.jpgIMG_6754.jpgIMG_6755.jpg
Today we (Sophia and Tyler) constructed the set-up for the electrical noise calculation that I will be conducting this summer. I have included images of
the setup below. Our system is effectively a green laser, that feeds into a type of polarizer, then into a beam splitter which sends the laser light down
two arms into detectors. We started by connecting the detectors to an oscilloscope to determine whether the signal will exceed 1V, as the red pitaya (our
Entry  Thu Apr 27 16:23:44 2023, Cao, Pamella and Julian, Physics, VAC, Installing vacuum system (cont.) IMG_0139.pngIMG_0136.png

 
[Pamella, Cao and Julian, Shane] 


 Particles account 
 10:37 am: Starting the particles account 

 
Zone 3:

 0.3u: 1662 
 0.5u: 872 
 1.0u: 415 


  Zone 4:

 0.3u: 831 

0.5u: 124 
 1.0u: 0 



 11:14 am: Start removal of calibrated leak to install 45 deg elbow 
 11:21 am:
Entry  Mon May 1 17:10:25 2023, Julian, Cao, Physics, VAC, Installing Pirani gauge and RGA probe onto to vacuum chamber PXL_20230501_225241491.jpgPXL_20230501_235854958.jpgPXL_20230501_234750795.MP.jpg
 [Julian, Cao] 



 03:00 pm: Particle count

:  Zone 3 

 0.3 um: 498
 0.5 um: 124
 1 um: 124


:
 Zone 4 

 0.3 um: 748
 0.5 um: 457
 1 um: 374





 03:32 pm: Installing Pirani
Entry  Mon Oct 3 17:21:39 2022, Cao, Update, TCS, Inspection of macor parts 7x
The macor parts arrived and inspected today. These include:


 Macor spacer (drawing:  LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf 
attached below), quantities: 40

 No defects, damages observed 
 Parts are free from grease/ machining fluid 
 Wall thickness
of 1 mm appear to provide sufficient stiffness to part 
 Images of parts:  Macor_spacer_0.jpg, Macor_spacer_1.jpg  


Entry  Mon May 26 23:24:33 2025, Michael, Update, Interferometer Simulations, Initial Monte Carlo Simulations for Toroidal Mirrors Project 
I've run an initial Monte Carlo simulation for statistical comparison of toroidal mirrors for the dual FROSTI TCS case. Below is the link to the slides.
slideshow
Entry  Tue May 6 13:07:34 2025, Michael, Update, Interferometer Simulations, Initial Convergence Plots for Toroidal Mirrors Project Convergence_Plots_5_6_25.pdfConvergence_Plots_5_6_25-1.pdfaperture_num_points_convergence.png
 
Entry  Mon Jun 3 14:14:39 2024, Tyler, Update, FLIR, Initial CIT FROSTI Analysis  CIT_FROSTI_Analysis_Group_Meeting-2.pdf
[Tyler]


Attached below are the initial results of the CIT FROSTI testing analysis.
Entry  Tue Feb 13 11:54:45 2024, Tyler, Configuration, FLIR, In-Air Optical Test Configuration In-air_optical_test_sketch.png

Below is the proposed schematic for FROSTI optical testing, chosen so enough space is allotted for prototype assembly.


 Steps to be taken include: 


  Reconstruct FLIR staging apparatus 
  Move test mass stand-in to cleanroom 
  Mark FLIR camera position on cleanroom
Entry  Tue Mar 19 10:55:30 2024, Tyler, Update, FLIR, In-Air Optical Test FroSTI_Thermal_Profile.png
Below is an image I took using the FLIR just before leaving for the LVK meeting. The profile is roughly what we would expect (annular). Any distortions
seen are likely from the screen not being completely parallel to the plane of the FroSTI (i.e. the screen slightly bends in various locations). Next step:
In-vacuum test at CIT.
Entry  Tue Nov 5 11:08:40 2024, Luis Martin, Update, VAC, ISO Test 

    [Luis, Luke, Ma Michael]
    
        The isolation test was conducted on the vacuum system. Every pump was turned off under vacuum, and pressure measurements were taken
every minute for 15 minutes. The results are displayed in the sheet linked at the end of this report. The pressure of the main volume dropped very slowly.
Entry  Tue Jun 21 18:31:49 2022, Cassidy and Phoebe, Update, Cameras, IR Absorbing Screen and FLIR Camera Setup IMG_6751.pngIMG_1146.pngIMG_6756.png
Today we set up the IR absorbing screen and the camera on the optical table, as well as tested that the camera was functioning as expected (picking up heat
sources beyond the screen).

Screen Setup
The screen was set up by clamping it between two rectangular posts on each side. First, two posts
were set up with 22 in. between them (thus allowing the screen to span a total distance of up to 24 in. when clamped down). To best stabilize the screen
Entry  Mon Apr 3 17:04:05 2023, Aiden, Summary, General, IDP Scroll Pump Assembly IMG_4244.jpg
Aiden installed the isolation valve and the exhaust silencer kits on the IDP-3 Scroll pump. The entire assembly still needs to be wiped down but overall
no residue came off when putting on the kits.
Entry  Sun Apr 10 15:39:49 2022, Rutuja Gurav, HowTo, Computer Scripts/Programs, HowTo: Renew the Let's Encrypt SSL certificate using certbot 
Port 80 is kept closed by default. This might be causing the certbot auto-renewal cronjob to fail. Therefore we must renew the certificate manually.
Step 1: Open port 80. (This is needed as the certificate renewal process runs some tests which requires client communication over
Entry  Sun May 14 15:50:48 2023, Cao, Infrastructure, Computers, High resolution display of logrus machine 
[Cao]

 
The display resolution of the logrus has been 1064x768 and has been the only option, which is not great. While remote access to logrus using
rdesktop allows rendering a virtual display of user's chosen resolution, it is not fast when using graphic-intensive program. NoMachine allows user to
take over and control the machine remotely and thus appears as the same machine. However, NoMachine cannot render a virtual display like rdesktop. This
Entry  Mon Mar 31 11:26:45 2025, Luke Johnson, Update, Scripts/Programs, Heatmaps of power delivery performance  temp_required.pngefficiency.png
These plots show the required temperature to release 100W of power and the efficiency of a particular configuration with half-width w and distance away
from the barrel z. I want to add to these heat maps a limit line that has restricts the proximity of the reflectors from the barrel. 
Entry  Fri Sep 6 14:34:52 2024, Luke , Update, VAC, Heating tape work 
On the 5th I had tried to start baking the vacuum chamber however certain parts of the chamber were getting too hot and causing the controllers to shut
off. So I turned them off so that the next day I could rearrange the temperature probes. I then on the 6th set them up so that instead of overshooting
the temperature they would be a little low in places.
Entry  Wed Jun 14 15:35:36 2023, Pamella, Update, VAC, Heating system installation  heater_equipment_install.jpg
[Pamella and Cao]

    Heating system installation - Second day.


    Today we kept installing the equipment for the heating system.

   First: Started installing the two heating cable around the chamber vacuum, the arms and covered it with aluminum tape.
    Second: Started
installing the insulation stuff around the vacuum chamber and around the connections points (the arms) in the vacuum chamber.
    Third:Started
Entry  Tue Sep 3 15:52:56 2024, Luke, Update, VAC, Heater tape initilization  
[Luke, Tyler, Jon]
On the 3rd we set up the pid controllers for the heater tapes and after putting on the insulation we started heating them up. We first brought
it to ~50C and let it stabilize, there was about a 6-7 degree difference between the RGA and the barrel temperature, with the barrel being higher. We then
Entry  Mon Jun 12 18:52:00 2023, Pamella, Update, General, Heater system parts - Wiped and bagged heater_equipment_wiped.jpg
[Pamella]
  Cleaning the heater system parts.
 04:32 pm: Started wiping the heater system parts.  
 06:38 pm: Finished wiping the heater
and some parts to the system. I wiped, tagged and bagged the heater system, power cables, adapter cables and power connectors. Also I wiped, bagged and
tagged the aluminum foil tape.
 06:43 pm: I putted all bags inside the cleanroom. 
 To do: I started but I was not able to finished
Entry  Tue Jun 20 17:28:23 2023, Pamella, Update, Electronics, Heater system parts - Wiped  IMG_7696.jpg
[Pamella]

    
Heating system 

    Wiping the heater system parts.
     04:37 pm: Started wiping the electronic device
part for the heater system (HL101 Series Digital Benchtop temperature limit control).
     05:19 pm: Finished wiping the parts to the heater
system (HL101 Series Digital Benchtop temperature limit control). I wiped the HL101 Series Digital Benchtop temperature limit control and I didn't bagged
Entry  Tue Jun 13 21:08:46 2023, Pamella, Infrastructure, VAC, Heater system - Installation IMG_7563.jpegIMG_7561.jpeg
[Pamella, Cao and Jon]


 Heating system installation 

 Today we started installing the equipments for the heating system. 

 First: Started installing the heating cable on the top lid and covered it with aluminum tape.
Second: Started installing the insulation
cover on top of the chamber lid.
Third:Started installing the heating cable from under the vacuum chamber and covered with aluminum tape. 
Entry  Mon Jan 27 11:29:38 2025, Xuesi Ma, Update, , Heater Element Test 20250124_165434.png20250124_165342.png20250214_132811.jpg
[Ma, Cece, Luke, Mary, Shane]

On Friday (Jan 24), we installed the heater elements on the stand. The heater elements are arranged from 1 to 8, oriented from right to left
as shown in Attachment 1. Each wire has been labeled according to its corresponding element number and type (e.g., RTD connections, heater connections).
Entry  Mon Feb 5 14:17:52 2024, Aiden, Update, VAC, Heater Element RGA Scan bake10_240205_Elements_ArO.pngbake10_240205_Elements_ArC.png
Here are the new RGA scans for the powered Heater elements. The pressure at the time of taking data was 2.88 e-8 torr. The HC levels are at 40 e-10 torrl/s
which is not bad but still higher than the lowest we have recorded.
Entry  Thu Feb 8 17:37:48 2024, Aiden, Update, VAC, Heater Element RGA Scan bake10_240208_Elements_ArO.pngbake10_240208_Elements_ArC.png
Took more RGA data now that the heaters are powered by 18V. The pressure of the system during the data taking was 3.8 e-8 torr. The RGA scans seem to have
gotten worse as well with this power increase.
Entry  Mon Feb 12 17:35:47 2024, Aiden, Update, VAC, Heater Element RGA Scan bake10_240212_Elements_ArO.pngbake10_240212_Elements_ArC.pngbake10_240212_Elements_300C_ArC.png
Took more RGA data before and after increasing the heater elements to 300 degC and before heating them up.


Started Bake 11 as well to hopefully prevent any hydrocarbons from getting captured by the room temperature walls of the chamber. The PID controllers
were set to 100C. 
Entry  Mon Feb 19 14:17:50 2024, Aiden, Update, VAC, Heater Element RGA Scan bake11_240219_Elements_ArO.png
Three days after the completion of Bake 11, the Heater elements RGA scan looks much cleaner. The HC level is back down to 33 e-10 torrl/s with the pressure
at 2.13 e-8 torr. I could not take a= scan with the Argon closed as it was left open during the bake and not closed since then.
Entry  Fri Jan 31 15:03:09 2025, Xuesi Ma, Update, , Heater Element Circuit Check 

        table {
            width: 100%;
            border-collapse: collapse; /* Merges borders into a single line */
        }
        th,
td {
            border: 1px solid #ddd; /* Adds a 1px solid border */
            padding: 8px;
            text-align: left;
        }
        th
{
            background-color: #f2f2f2; /* Adds a light gray background to headers */
        }

[Ma] Wed 1/29/2025
Entry  Mon Jul 14 20:45:20 2025, Luke , Summary, Cleanroom, HEPA filter performance metrics  
[Luke, Luis]

We’ve been looking into methods for evaluating the performance of the HEPA filters in the clean room. Measuring flow rate appears to be
a promising approach, since the filter manual specifies a recommended minimum of 70 ft/min.
Entry  Mon Jul 11 14:29:45 2022, Jon, Omnistructure, General, HEPA filter installed IMG_1530.png
Today I unpacked and installed the new HEPA filter for the lab. It is an Omni CleanAir OCA1210 capable of 1200 CFM. This flow rate is sufficient to turn
over the air in the room once every 4 minutes, or 14 times per hour. Hopefully this will cut down on our particulate accumulation issues.
Entry  Sun Apr 19 15:22:08 2026, Pooyan, Infrastructure, Cleanroom, HEPA fan air flow measurment 
[Ma, Mary, Tyler, Pooyan]
HEPA fan air flow measurements are done with the fans sitting on their side in the lab, and the anemometer being 24in away from the filter face
of the fan. Per company's documents, we need to replace the filter if the air flow velocity drops under 38-45 fpm for the medium settings.)
Entry  Thu Jul 2 13:27:48 2026, Joshua Marmor, Update, General, HBT SURF Update #1 group-meeting-july-2.pdf
Update on the progress for the HBT measurement.
Entry  Tue Feb 18 10:02:16 2025, Xuesi Ma, Update, , Group Meeting Slides 2/18/2025 
https://docs.google.com/presentation/d/1WiV2VqS0BzXNCK6VYYQ-Ty8xlHnzXatQaFbMf1-0rsY/edit?usp=sharing
Entry  Wed Oct 2 10:31:46 2024, Xuesi Ma, Configuration, , Group Meeting Slides 10/2/2024 Group_Meeting_10_2.pdf

Group Meeting slides for Non-deterministic Heater Response.
    Reply  Thu Apr 27 21:43:07 2023, Jon, Physics, VAC, Grounding vacuum system IMG_0141.pngIMG_0140.png
This afternoon I made up a green 10 AWG grounding cable and connected it to the vacuum system.
One end is tightly connected to the bottom flange of the vacuum chamber (photo 1). It is run along and up the table framing to the top of the cleanroom,
where it exits into the overhead cable tray in the same location as the other power cables. It drops down from the top of the server rack all the way to
    Reply  Fri Apr 28 18:16:57 2023, Cao, Physics, VAC, Grounding vacuum system 




Quote:

This afternoon I made up a green 10
AWG grounding cable and connected it to the vacuum system.
Entry  Tue Sep 16 12:18:09 2025, Liu, Update, Interferometer Simulations, Grid search optimization for single-ring FROSTI Update.pdf
Grid search optimization for single-ring FROSTI
Entry  Tue Aug 1 16:22:35 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Tuesday 8/1 HOM_RH_Simulation_Progress_80123.pdf
Slides 20-33 are newly added (data/graphs from parameter sweep feature-1/8th heater unit length varied from 10% of original to 100% of original). 
Entry  Fri Jul 28 17:45:45 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Friday 7/28 HOM_RH_Simulation_Progress.pdf
Updated 1/8th Heater simulation modification graphs. Slides 7, 10, 16-19 are new additions.
Entry  Thu Jul 27 10:18:43 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification HOM_RH_1_8_Unit_Modification_Graphs.pdf
Attached are updated graphs of the irradiance distribution from the 1/8th ring heater units (extruded and reduced in length). 
Entry  Sun Jul 16 15:21:56 2023, Pamella, Update, General, General update about some problems in the lab. IMG_8637.jpgIMG_8633.jpgIMG_8631.jpg
[Pamella]

 General information about the lab facility. 
 
  Changed sticky floor mats, because close to entrance the cleanroom,
both sticky floor had a many died ants on top. 
The light on top of the internet cable bridge is burned out.. I just saw this today but I am
not sure if was like this before.
The ant bait traps seem very efficient and right now only a few ants are running around in the lab, most are
Entry  Tue Feb 20 11:31:49 2024, Tyler, Update, Cleanroom, Garment Cabinet Door Replacement image_67190529.JPGimage_67177473.JPG
[Luis, Luke, Pooyan, Tyler]


The replacement door for the HEPA garment cabinet arrived last week, and was installed on Thursday. However, it looks
like there's a small gap between the door and where the hinge is attached to the cabinet frame. No screws were provided with the replacement door. If we
want to perform any adjustments, we have to be very careful; the screws break very easily. 
Entry  Thu Jun 18 08:40:07 2026, Mary, Infrastructure, General, Fume hood Fume_hood.pdf
[Ma, Mary]


The tape residue on the fume hood was cleaned using acetone; however, the acetone caused minor paint removal. Few areas with rust were also found,
including inside both side cabinets. under the fume hood.
Entry  Thu Apr 30 12:52:26 2026, Mary, Update, Interferometer Simulations, Full interferometer simulation Full_interferometer.pdf
 
Entry  Tue Jan 21 10:12:02 2025, Luke , Summary, General, Frosti toy model  
[Luke, Liu]
Over the winter break I have been working on this desmos toy model of the Frosti. There
are still a few rough spots but I belive that it is a good visual representation of a 2D slice of the frosti. 
Entry  Tue Sep 16 12:47:29 2025, Xuesi Ma, Update, Interferometer Simulations, Frosti actuation impact analysis 
Slides
Entry  Fri Jun 28 10:43:13 2024, Xuejun, Update, Cleanroom, Frosti frosti.jpgchassis.jpg
[Xuejun, Tyler]


We moved Frosti into the cleanroom and debugged it to make sure everything was working. One of the DB25 pins broke off at the connector
for element 1 so it needed to be recrimped. Element 6 short circuited but fixed with adjustment to the heater power pin position. We connected the power
and sensor connectors to the power box and recalibrated the RTD sensors.
Entry  Fri Jul 5 13:17:44 2024, Liu, Update, Interferometer Simulations, Four-quadrant FROSTI-like RH for astigmatic thermal actuation for CE optics 7x
In the CE corner layout design and down selection study, interferometer layouts with large incidence angles on some of the curved optics are being considered,
such as the folding mirrors in the "long crab". This however generates astigmatic beams upon reflection and results in mode mismatches in coupled cavities
that need to be mitigated. Astigmatic thermal actuation for the optics involved is thus essential. One way we are considering is to implement a FROSTI-like
ELOG V3.1.3-7933898