ligo-ex
ligo-ds
|
Richardson Lab Experimental Log, Page 6 of 11 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Mon Jul 15 13:30:49 2024, Luke , Update, VAC, Problem with 2.75" to 1.33" zero length reducer
|
Mon Mar 10 17:03:52 2025, Shane, Update, CDS, Pressure Gauge successful connect
|
Mon Nov 6 11:29:24 2023, Tyler, Update, Electronics, Preliminary RTD Calculations, RP Software Update  
|
Tue Aug 1 12:48:41 2023, Aiden, Update, Cleanroom, Pre Filter Change  
|
Wed Jun 28 15:58:56 2023, Shane, Cao, Infrastructure, VAC, Power trip problem remains, source of smoke is insulation    
|
Tue Feb 20 08:01:30 2024, Jon, Infrastructure, General, Power and network equipment installed in 1129 rack   
|
Tue Jul 18 16:35:06 2023, Pamella, Update, FLIR, Plot-Data with the new configuration without the mask and reflector.
|
Thu Aug 29 16:39:34 2024, Luke, Update, VAC, Photos of heater tape 6x
|
Tue May 9 15:49:20 2023, Jon, Infrastructure, VAC, Permanent cable routing
|
Mon Nov 28 18:10:23 2022, shane, Update, ELOG, Particle counts in the clean room
|
Tue Apr 4 16:52:08 2023, Jon, Update, Cleanroom, Particle counter docking station
|
Wed Apr 12 16:17:50 2023, shane, Update, General, Particle Counter moved
|
Mon Oct 9 11:29:37 2023, Tyler, Update, Electronics, PSD/CSD Plot Updates 
|
Mon Mar 10 21:13:12 2025, Nathan, Update, VLC Update, PDH Lock Progress and Next Steps   
|
Wed Mar 1 21:27:20 2023, Jon, Infrastructure, Cleanroom, Over-table shelf height raised
|
Mon Jan 23 17:26:15 2023, Peter Carney, Update, General, Oven cleaning
|
Thu Jan 26 18:58:25 2023, Aiden, Update, General, Oven Heating
|
Fri Feb 23 18:03:27 2024, Tyler, Update, FLIR, Optical Test Setup in Cleanroom
|
Tue Jul 26 14:10:35 2022, Cassidy, Update, Cameras, Optical Post Replacement and Realignment  
|
Thu Feb 27 18:22:21 2025, Shane, Update, CDS, Ongoing work in server rack and desk area (1119)
|
Mon Aug 12 17:09:04 2024, Cynthia , Update, Interferometer Simulations, O4 vs O5 cavity scans with ITM plume guess or ETM   
|
Mon Jul 1 15:19:42 2024, Cynthia , Update, Interferometer Simulations, O4 and O5 mirror cavity scans with thermal effect
|
Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced
|
Fri Feb 10 16:34:45 2023, Huy Tuong Cao, Infrastructure, Clean & Bake, Nitrogen gas tank ready to use
|
Fri Jul 26 17:25:42 2024, Jon, Infrastructure, Computers, New workstation ws4 installed in 1129
|
Thu Jun 20 18:01:11 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129
|
Wed Jun 26 15:33:41 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129
|
Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables
|
Tue Jun 27 15:18:26 2023, Pamella, Update, FLIR, New data collection 
|
Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI
|
Fri Jul 14 16:49:42 2023, Pamella, Update, FLIR, New bridge and calibration data
|
Mon May 13 14:48:27 2024, Aiden, Update, VAC, New Vacuum Chamber Design
|
Mon Jul 8 17:01:45 2024, Shane, Update, CDS, New CyMAC internal layout
|
Tue May 30 14:51:27 2023, Pamella, Update, FLIR, New 3D mask - Bigger triangles shapes. 
|
Tue Jul 25 15:35:14 2023, Shane, Update, Electronics, More chassis moved
|
Wed May 3 19:03:47 2023, Julian,Pamella and Cao, Physics, VAC, Modify vacuum asssembly and install RGA
|
Wed May 31 16:18:41 2023, Aiden, Summary, General, Mock FROSTI
|
Mon Jul 8 12:26:10 2024, Michael, Update, Interferometer Simulations, Minimizing Astigmatic Effects in the SRC of LIGO
|
Sat Feb 24 08:53:38 2024, Jon, Infrastructure, Computers, Matlab upgraded to 2023b on Chimay
|
Thu Jan 2 17:52:58 2025, Luis, Update, VAC, MR Testing Continuation  
|
Mon Dec 16 21:32:21 2024, Luis, Update, VAC, MR Testing
|
Sun Dec 22 20:43:35 2024, Luis, Update, VAC, MR Testing 
|
Tue Nov 5 09:56:04 2024, Luis Martin, Update, Clean & Bake, MR Bake
|
Mon Feb 19 14:40:21 2024, Shane, Update, CDS, MEDM screen for FROSTI temp readouts 
|
Thu Feb 29 17:16:48 2024, Shane, Update, CDS, MEDM screen for FROSTI T/P readouts
|
Wed Feb 21 23:15:07 2024, Michael, Update, Interferometer Simulations, Long Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in Beamsplitter  
|
Tue Feb 6 22:40:25 2024, Michael, Update, Scripts/Programs, Long Crab 1 Design Created In Gtrace 
|
Wed Nov 20 12:31:24 2024, Luis, Update, VAC, Leak test RGA Scan after vacuum repairs
|
Tue Nov 19 17:10:34 2024, Luke , Update, VAC, Leak check  
|
Wed Oct 23 11:48:06 2024, Luis Martin, Update, VAC, Leak Test Results
|
|