ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 6 of 13  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  457   Wed Oct 9 13:52:31 2024 TylerUpdateTCSRIN Update 10/09/2024 I tried adjusting the gain settings on
the photodetectors to check if this would
help improve the RIN spectra measurements.
 RIN_plots_CH0.pdf 
  470   Wed Nov 13 14:03:32 2024 TylerUpdateElectronicsRIN Update[Tyler]


We've added two low-pass filters
in hopes of reducing any potential aliasing
that may be introducing additional noise
 IMG_0463.jpgCH0_CH1_ASDs.pdf 
  477   Wed Nov 20 12:59:37 2024 TylerUpdateElectronicsRIN UpdateI went ahead and compared the noise spectrum
of the ADC to those of the photodetectors
with the FROSTI on and off. As discussed
 ASD_plots.pdf 
  479   Wed Nov 27 13:48:01 2024 TylerUpdateElectronicsRIN Update[Tyler]

 
I downgraded the Red Pitaya
back to OS 2.00-18 due to runtime errors
during measurement. Once I did this, the
 New_ASD_plots.pdf 
  635   Tue Aug 26 12:45:41 2025 Christina, Ma, TylerUpdateCDSRIN UpdateSlides   
  531   Tue Mar 4 10:28:58 2025 TylerUpdateTCSRIN Plot Updates   Dark_bin_veto.pdfMock_final_plot_inst.pdf 
  422   Mon Aug 12 16:24:34 2024 TylerUpdateCleanroomRIN Measurement Update 1[Tyler]


For some preliminary tests,
I moved the IR photodetectors outside of
the cleanroom and onto the other optical
 Basic_setup.jpgRP.jpg 
  417   Mon Jul 29 14:30:16 2024 TylerUpdateCleanroomRIN Measurement Set-up[Tyler]


I have begun moving parts
into the cleanroom for the upcoming FROSTI
RIN tests that will be conducted within the
 RIN_FROSTI.jpg 
  637   Tue Sep 2 11:53:34 2025 TylerUpdateTCSRIN Infrastructure Update (09/02/2025)[Ma, Tyler]


Below are slides discussing
RIN infrastructural updates related to the
CyMAC.
  
  648   Tue Sep 23 13:10:07 2025 TylerUpdateTCSRH O6 Update 09/23/25Slides   
  642   Tue Sep 9 12:06:38 2025 TylerUpdateTCSRH O6 UpdateSlides   
  627   Tue Aug 12 13:28:00 2025 TylerUpdateTCSRH Fenicsx v. HV   Profile_comparison.png1W_diff.png50W_diff.png 
  401   Thu Jul 11 15:53:39 2024 LukeUpdateVACRGA line upgrade [ Luke, Jon ]
Started work at 11:00
As mentioned in my previous post
 image_2024-07-11_154630323.pngimage_2024-07-11_154818191.pngimage_2024-07-11_154902840.png 
  427   Fri Aug 23 16:08:32 2024 LukeUpdateVACRGA line leak testing[Luke, Luis, Jon, Tyler]
On the 22nd Dr. Richardson showed
Luis, Tyler and I how to preform a leak test
  
  429   Tue Aug 27 15:01:26 2024 LukeUpdateVACRGA line leak testing[Luke, Tyler]
On the 27th Tyler and I ran the RGA
leak test again with the electron multiplier
  
  400   Wed Jul 10 17:31:07 2024 LukeUpdateVACRGA line disassembly and upgrade [ Luke, Cynthia, Michael, Xuesi, Anthony
]
Started work around 12:45
 image_2024-07-10_172112210.pngimage_2024-07-10_172431863.pngimage_2024-07-10_172603090.pngimage_2024-07-10_172823966.png 
  261   Fri Nov 10 08:32:34 2023 JonUpdateVACRGA experimentsI ran a 3-minute
degas cycle of the RGA filament for the first
time yesterday (in this process, the filament
  
  266   Tue Nov 14 17:21:40 2023 JonUpdateVACRGA best practicesAs a follow up ELOG 261,
I have received advice from one of the vacuum
experts at LIGO Hanford on best practices
  
  487   Wed Dec 11 16:06:05 2024 LuisUpdateVACRGA Status[Luis]

 I rebooted Spica and I
was able to connect the RGA again. After
Connecting the RGA, I left the filament on.
  
  96   Wed May 10 10:49:34 2023 AidenUpdateGeneralRGA Software[Aiden, Cao]

Went over how to use the RGA
software, how to change the graph units,
scaling and mass detection. Also went over
  
  440   Mon Sep 16 13:51:23 2024 Luis MartinUpdateVACRGA Scans



   
    


 2024-09-11_PostBake1_ArO.png2024-09-13_PostBake1_ArO.png2024-09-16_PostBake1_ArO.png 
  448   Wed Sep 25 09:06:09 2024 Luis MartinUpdateVACRGA Scans



   
    
 24overlay.png24overlayNormalized.png 
  488   Thu Dec 12 13:06:39 2024 LuisUpdateVACRGA Scan and vacuum system updates    [Luis, Luke]
    
        RGA Volume:
T = 21°C, P = 1.74e-9 Torr
 2024-12-12_PostBake2_ArC.png2024-12-12_PostBake2_ArO_overlay.png 
  485   Thu Dec 5 10:31:13 2024 Luis UpdateVACRGA Scan and RGA updates



   
    


 2024-12-04_PostBake2_ArO.png 
  573   Thu May 8 17:41:56 2025 LuisUpdateVACRGA Scan Post Bake [Ma, Luis]
    After taking the RGA scans of
the new system, here are the results of the
 2025-4-29_HeaterElement-Bake1_ArO_overlay.png2025-4-29_HeaterElement-Bake1_ArO_overlayNormalized.png 
  459   Wed Oct 16 13:58:59 2024 Luis MartinUpdateVACRGA ScanThe following figure displays data acquired
on 10/09, and it shows that we are no longer
below the cleanliness standard. Also, the
 2024-10-09_PostBake1_ArO.png 
  463   Wed Oct 23 12:08:36 2024 Luis MartinUpdateVACRGA Scan[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself
ran a RGA scan, the results are displayed
 2024-10-22_PostBake1_ArO.png 
  519   Thu Feb 20 17:07:36 2025 LuisUpdateVACRGA Scan [Ma, Luis]
    February 20, 2025 - 3:30
PM
 2025-2-20_HeaterElement_ArO.png 
  522   Mon Feb 24 17:50:13 2025 LuisUpdateVACRGA Scan [Ma, Luis]
    February 24, 2025 - 1:00PM

    Ma performed an RGA scan with
 2025-2-24_HeaterElement_ArO.png 
  651   Wed Oct 8 14:45:12 2025 Xuesi MaInfrastructureVACRGA Chamber PressureRGA Chamber pressure is currently at 3.68e-4
torr.
 20251008_130141.jpg 
  469   Wed Nov 6 13:48:55 2024 LiuUpdateInterferometer SimulationsQN modeling updateSlides   
  405   Mon Jul 15 13:30:49 2024 Luke UpdateVACProblem with 2.75" to 1.33" zero length reducer Last Friday while checking the depth of the
ZLR I got one of the screws stuck. Today
I tried a couple things to get it out. First
 IMG_1882.jpg 
  555   Thu Apr 17 12:12:29 2025 LiuHowToInterferometer SimulationsPreventing Thread Contention in Multiprocessing with Finesse and Cython
    Avoiding Thread
Contention When Using Multiprocessing
  
  653   Fri Oct 10 14:40:23 2025 Xuesi MaUpdateVACPressure gauge Swap[Tyler, Ma]

We are suspecting a pressure
gauge problem. The electronic unit of the
main chamber pressure gauge and the electronic
  
  535   Mon Mar 10 17:03:52 2025 ShaneUpdateCDSPressure Gauge successful connectVac system serial interfacing update: the
pressure gauge is now able to communicate
successfully through the code. It's been
  
  255   Mon Nov 6 11:29:24 2023 TylerUpdateElectronicsPreliminary RTD Calculations, RP Software Update
Preliminary RTD calculations are shown
below, given an input of 10 V and desiring
a few mA of current. It looks like R_ref
 cvt.pngVvC.pngIMG_7471.jpg 
  185   Tue Aug 1 12:48:41 2023 AidenUpdateCleanroomPre Filter Change
Changed the pre filter inside of the
3 stage HEPA system next to the soldering
station. It was rather dirty and I have attached
 IMG_4564.jpgIMG_4563.jpgIMG_4562.jpg 
  137   Wed Jun 28 15:58:56 2023 Shane, CaoInfrastructureVACPower trip problem remains, source of smoke is insulation[Shane, Cao] 


With the new change
in wiring configuration described in elog
136,
 Pumpline_afterRemoveInsul.jpgRGAline_afterRemoeInsul.jpgMeltedInsulation1.jpgMeltedInsulation1.jpgMeltedInsulation2.jpg 
  330   Tue Feb 20 08:01:30 2024 JonInfrastructureGeneralPower and network equipment installed in 1129 rack[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On
Thursday we installed the power conditioning/distribution
equipment and networking equipment in the
 IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg 
  604   Mon Jul 7 16:39:18 2025 ChristinaUpdateTCSPomona Box Drawings Below are the drawings for the pomona
box modifications 
 pbdwg1.PDFpbdwg2.pdf 
  587   Tue Jun 3 12:16:13 2025 Cynthia UpdateInterferometer SimulationsPoint absorber simulation on radially averaged profile    update_6_3.pdf 
  165   Tue Jul 18 16:35:06 2023 PamellaUpdateFLIRPlot-Data with the new configuration without the mask and reflector.[Pamella]

I was able to plot the
first graph for a result between the six
different positions on the screen, for now
 Gauss.plot.jpeg 
  431   Thu Aug 29 16:39:34 2024 LukeUpdateVACPhotos of heater tape   6x 
  560   Tue Apr 22 13:00:04 2025 NathanUpdateVLC UpdatePhotodiode signal check and additional signal check due to 20Mhz signal and amplifierIn general, photodiode was able to achieve
signal. Below are the voltage signals and
frequency measurements of the photodiode
 thumbnail_(8)_(1).jpgvpp.jpg 
  614   Tue Jul 15 13:13:48 2025 ChristinaUpdateTCSPhotodetector optical post assembly   pdreassembly.png 
  94   Tue May 9 15:49:20 2023 JonInfrastructureVACPermanent cable routingToday I brought in a fresh supply of zip
ties (we now have 1500 in the tool chest)
and used them to permanentize the cable routing
  
  12   Mon Nov 28 18:10:23 2022 shaneUpdateELOGParticle counts in the clean roomParticle count stats for the clean room Nov
28, 2022: 
Took 10 sample runs in each of
5 regions in the clean room (5 runs per region
 clean_room_particle_counts_11_28_-_Sheet1.pdf 
  64   Tue Apr 4 16:52:08 2023 JonUpdateCleanroomParticle counter docking stationDue to the problems we have encountered trying
to serially communicate directly with the
Met One DR-528 particle counter, I went ahead
 Met_One_Dock.png 
  71   Wed Apr 12 16:17:50 2023 shaneUpdateGeneralParticle Counter movedWith the added height of the new docking station,
the particle counter no longer fits under
the Windows monitor in the electronics rack
 IMG_6693.HEIC 
  235   Mon Oct 9 11:29:37 2023 TylerUpdateElectronicsPSD/CSD Plot UpdatesContinuing from Sophia's SURF Project this
summer: Plotting the Power-Spectral Densities
(PSDs) and Cross-Spectral Densities of two
 Screenshot_2023-10-09_at_11.20.25_AM.pngwelch_csd-2.png 
ELOG V3.1.3-7933898