  405   Mon Jul 15 13:30:49 2024 Luke UpdateVACProblem with 2.75" to 1.33" zero length reducer Last Friday while checking the depth of the
ZLR I got one of the screws stuck. Today
I tried a couple things to get it out. First
 IMG_1882.jpg 
  535   Mon Mar 10 17:03:52 2025 ShaneUpdateCDSPressure Gauge successful connectVac system serial interfacing update: the
pressure gauge is now able to communicate
successfully through the code. It's been
  
  255   Mon Nov 6 11:29:24 2023 TylerUpdateElectronicsPreliminary RTD Calculations, RP Software Update
Preliminary RTD calculations are shown
below, given an input of 10 V and desiring
a few mA of current. It looks like R_ref
 cvt.pngVvC.pngIMG_7471.jpg 
  185   Tue Aug 1 12:48:41 2023 AidenUpdateCleanroomPre Filter Change
Changed the pre filter inside of the
3 stage HEPA system next to the soldering
station. It was rather dirty and I have attached
 IMG_4564.jpgIMG_4563.jpgIMG_4562.jpg 
  137   Wed Jun 28 15:58:56 2023 Shane, CaoInfrastructureVACPower trip problem remains, source of smoke is insulation[Shane, Cao] 


With the new change
in wiring configuration described in elog
136,
 Pumpline_afterRemoveInsul.jpgRGAline_afterRemoeInsul.jpgMeltedInsulation1.jpgMeltedInsulation1.jpgMeltedInsulation2.jpg 
  330   Tue Feb 20 08:01:30 2024 JonInfrastructureGeneralPower and network equipment installed in 1129 rack[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On
Thursday we installed the power conditioning/distribution
equipment and networking equipment in the
 IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg 
  165   Tue Jul 18 16:35:06 2023 PamellaUpdateFLIRPlot-Data with the new configuration without the mask and reflector.[Pamella]

I was able to plot the
first graph for a result between the six
different positions on the screen, for now
 Gauss.plot.jpeg 
  431   Thu Aug 29 16:39:34 2024 LukeUpdateVACPhotos of heater tape   6x 
  94   Tue May 9 15:49:20 2023 JonInfrastructureVACPermanent cable routingToday I brought in a fresh supply of zip
ties (we now have 1500 in the tool chest)
and used them to permanentize the cable routing
  
  12   Mon Nov 28 18:10:23 2022 shaneUpdateELOGParticle counts in the clean roomParticle count stats for the clean room Nov
28, 2022: 
Took 10 sample runs in each of
5 regions in the clean room (5 runs per region
 clean_room_particle_counts_11_28_-_Sheet1.pdf 
  64   Tue Apr 4 16:52:08 2023 JonUpdateCleanroomParticle counter docking stationDue to the problems we have encountered trying
to serially communicate directly with the
Met One DR-528 particle counter, I went ahead
 Met_One_Dock.png 
  71   Wed Apr 12 16:17:50 2023 shaneUpdateGeneralParticle Counter movedWith the added height of the new docking station,
the particle counter no longer fits under
the Windows monitor in the electronics rack
 IMG_6693.HEIC 
  235   Mon Oct 9 11:29:37 2023 TylerUpdateElectronicsPSD/CSD Plot UpdatesContinuing from Sophia's SURF Project this
summer: Plotting the Power-Spectral Densities
(PSDs) and Cross-Spectral Densities of two
 Screenshot_2023-10-09_at_11.20.25_AM.pngwelch_csd-2.png 
  536   Mon Mar 10 21:13:12 2025 NathanUpdateVLC UpdatePDH Lock Progress and Next StepsProgress update: Photodiode is set up, need
to set up DC bias tee, EOM has 400-600nm
wavelength range with a resonance frequency
 thumbnail_(2).jfifthumbnail_(4).jfifthumbnail_(5).jfifVisible_Light_Optical_Cavity_(2).pdf 
  39   Wed Mar 1 21:27:20 2023 JonInfrastructureCleanroomOver-table shelf height raisedJon, Cao

Today we raised the height of the
shelf overhanging the cleanroom laser table
 cleanroom-shelf.jpg 
  16   Mon Jan 23 17:26:15 2023 Peter CarneyUpdateGeneralOven cleaningAiden and Cao 
Turned on the oven to 120
deg C for 12 hours. After 12 hours, put it
at 200 deg C for 48 hours. 
  
  17   Thu Jan 26 18:58:25 2023 AidenUpdateGeneralOven HeatingAiden cleaned the oven with methanol again
and set the oven to 260 degC for 12 hours.
  
  338   Fri Feb 23 18:03:27 2024 TylerUpdateFLIROptical Test Setup in Cleanroom[Tyler, Xuesi]

The FLIR and test mass
stand-in have been transferred into the cleanroom.
A software test will be run as soon as we
 IMG_0941.png 
  9   Tue Jul 26 14:10:35 2022 CassidyUpdateCamerasOptical Post Replacement and RealignmentToday I replaced the 3" optical post that
the camera rests on with a 2" optical post
in order for the screen to correctly fill
 YAxisAlignment.pngXRotZAlignment.pngNewOpticalPost.png 
  527   Thu Feb 27 18:22:21 2025 ShaneUpdateCDSOngoing work in server rack and desk area (1119)As part of the vacuum communications debugging
process, there is ongoing work in the server
rack and desk area in 1119. Please be careful
  
  424   Mon Aug 12 17:09:04 2024 Cynthia UpdateInterferometer SimulationsO4 vs O5 cavity scans with ITM plume guess or ETMSo far the proposed solution for what to use
for O5 ITM mirror for SIS simulations is
either the plume guess file or using the
 O5_plots_and_tables.pdfO4_plots_and_tables.pdfETM12mapO5.pngScreenshot_2024-08-12_at_5.05.31_PM.png 
  392   Mon Jul 1 15:19:42 2024 Cynthia UpdateInterferometer SimulationsO4 and O5 mirror cavity scans with thermal effect   cavityScan_07_01.pdf 
  67   Tue Apr 11 13:15:40 2023 CaoInfrastructureClean & BakeNitrogen gas tank replacedThe nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).

The new tank has been
  
  26   Fri Feb 10 16:34:45 2023 Huy Tuong CaoInfrastructureClean & BakeNitrogen gas tank ready to useCao,


Today I fixed the final bit related
to the nitrogen gas tank, which is to apply
sealing tape to M-NPT connector of the hose
 AirGunSealed.jpg 
  412   Fri Jul 26 17:25:42 2024 JonInfrastructureComputersNew workstation ws4 installed in 1129Today I installed the second desktop workstation
in 1129. The new machine is an Intel NUC13ANHi5,
with a 12-Core Intel i5-1340P CPU, 32GB DDR4
 ws4.jpg 
  379   Thu Jun 20 18:01:11 2024 JonInfrastructureComputersNew workstation ws3 in 1129I have repurposed a spare Intel NUC to serve
as the first of two planned workstations
in 1129. Today I set it up with a fresh installation
  
  385   Wed Jun 26 15:33:41 2024 JonInfrastructureComputersNew workstation ws3 in 1129
Set-up of the first CDS workstation for
1129, ws3, is complete and the machine is
ready for use. The login credentials are
 IMG_1368.jpg 
  198   Wed Aug 9 11:32:56 2023 JonInfrastructureGeneralNew power cablesI delivered new NEMA 5-15 (120V / 15 A)
power cables to the lab for the following
items:
 IMG_0299.jpg 
  135   Tue Jun 27 15:18:26 2023 PamellaUpdateFLIRNew data collection  
[Pamella]



  Yesterday,
I did a new data collection.  I could get
a better data in this time and I realized
 FLIR_data.002.jpegFLIR_data_2.002.jpeg 
  123   Tue Jun 13 21:33:46 2023 PamellaUpdateGeneralNew cabinet for PPI[Pamella and Dr.Richardson]

Dr. Richardson
installed the new cabinet outside the room
for the PPI equipments, and then I wiped
  
  157   Fri Jul 14 16:49:42 2023 PamellaUpdateFLIRNew bridge and calibration data[Pamella]


Aiden 3D printed a new
bridge for the heater and I installed the
new bridge yesterday. 
 I started
 IMG_8606.jpeg 
  367   Mon May 13 14:48:27 2024 AidenUpdateVACNew Vacuum Chamber DesignI created a new model for the vacuum chamber
based on the ideas from last week's meeting.

It
should be noted that we can not have the
 VaccumChamberAssembly__Redesign_v5.jpg 
  398   Mon Jul 8 17:01:45 2024 ShaneUpdateCDSNew CyMAC internal layout[Jon, Shane]

Internal layout of CyMAC has
been updated (labeled image attached) to
accommodate the replacement of the two ribbon
 updated_cymac.jpeg 
  108   Tue May 30 14:51:27 2023 PamellaUpdateFLIRNew 3D mask - Bigger triangles shapes.[Pamella]

 Change the 3D mask 

Started removing the old mask in the reflector.

Started cutting the new aluminum lid for
 AcquisitionImage(May-30-2023_14_38).jpgthumbnail_IMG-7303.jpg 
  172   Tue Jul 25 15:35:14 2023 ShaneUpdateElectronicsMore chassis movedFinished basic assembly of binary input and
output chassis today, and moved one to top
shelf of work bench. The other is in corner
 IMG_8409.HEIC 
  91   Wed May 3 19:03:47 2023 Julian,Pamella and CaoPhysicsVACModify vacuum asssembly and install RGA[Pamella, Julian, Cao]

   Today we
started re-configuring the vacuum chamber
components. 

 Particle count
 vaccum_chamber_re-configuration.jpg 
  111   Wed May 31 16:18:41 2023 AidenSummaryGeneralMock FROSTIFinished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab.
 IMG_4394.jpg 
  397   Mon Jul 8 12:26:10 2024 MichaelUpdateInterferometer SimulationsMinimizing Astigmatic Effects in the SRC of LIGOThis is the first look and analysis of the
effects of astigmatism in the aLIGO optical
layout which can lead to mode mismatch and
  
  339   Sat Feb 24 08:53:38 2024 JonInfrastructureComputersMatlab upgraded to 2023b on ChimayI upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me
  
  496   Thu Jan 2 17:52:58 2025 LuisUpdateVACMR Testing Continuation [Luis, Luke]
        RGA Volume:
T = 22°C, P = 2.10e-9 Torr
        Main Volume:
 2024-12-16_PostBake2_ArO_overlay.png2025-1-2_MR-Bake1_ArO.png2025-1-2_MR-Bake1_ArC_overlay.png 
  490   Mon Dec 16 21:32:21 2024 LuisUpdateVACMR Testing[Luis, Luke]

The MR material was
placed in the vacuum chamber following standard
procedures to ensure the vacuum remained
 IMG_6011.HEIC 
  494   Sun Dec 22 20:43:35 2024 LuisUpdateVACMR Testing[Luis, Luke]
        RGA Volume:
T = 23°C, P = 3.0e-9 Torr
        Main Volume:
 2024-12-13_PostBake2_ArO_Degas_overlay.png2024-12-22_MR-Bake1_ArO.png 
  467   Tue Nov 5 09:56:04 2024 Luis MartinUpdateClean & BakeMR Bake    [Luke, Luis]
    
        On Friday, 11/1/24,
the MR was unpackaged and cleaned under the
  
  329   Mon Feb 19 14:40:21 2024 ShaneUpdateCDSMEDM screen for FROSTI temp readoutsHere's the latest draft of the MEDM screen
for the FROSTI heating elements' temperature
readouts. Note that the MEDM screen isn't
 IMG_6094.jpegIMG_6092.jpeg 
  346   Thu Feb 29 17:16:48 2024 ShaneUpdateCDSMEDM screen for FROSTI T/P readoutsHere's the latest draft of the MEDM screen
for the FROSTI temp and power readouts, now
with a button linking to the c1msc file display.
 IMG_6259.jpeg 
  334   Wed Feb 21 23:15:07 2024 MichaelUpdateInterferometer SimulationsLong Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in BeamsplitterI have created the long shoelaces 1 layout
for cosmic explorer using gtrace, a slight
modification from the shoelaces 1 layout
 long_shoelaces1_desmos.JPGAR_side_with_reflection.PNGAR_side_without_reflection.PNG 
  317   Tue Feb 6 22:40:25 2024 MichaelUpdateScripts/ProgramsLong Crab 1 Design Created In GtraceWorked on and completed the python code for
the simulation of the Long Crab 1 layout
for Cosmic Explorer basing off of Pooyan's
 Long_Crab1.pnglong_crab_1_desmos.PNG 
  476   Wed Nov 20 12:31:24 2024 LuisUpdateVACLeak test RGA Scan after vacuum repairs[Luke, Luis]
After the gasket replacement performed
on Monday (11/18/24) we let the vacuum pump
 2024-11-20_PostBake1_ArO.png 
  474   Tue Nov 19 17:10:34 2024 Luke UpdateVACLeak checkChamber temperature: 23C
Chamber Initial Pressure: ~1.8e-8
main, ~3.5e-8 rga
 image.pngIMG_5116.jpegIMG_5117.jpeg 
  462   Wed Oct 23 11:48:06 2024 Luis MartinUpdateVACLeak Test Results[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself
ran a leak test, the results are displayed
  