ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 5 of 10  Not logged in ELOG logo
ID Date Author Type Categorydown Subject
  414   Mon Jul 29 12:20:56 2024 LiuUpdateInterferometer SimulationsUpdate on wavefront actuation with astigmatically driven RH for CE
Update on wavefront actuation with astigmatically driven RH for CE is attached.
Attachment 1: SURF_nonastig_merged.pdf
SURF_nonastig_merged.pdf
  415   Mon Jul 29 12:23:10 2024 LiuUpdateInterferometer SimulationsUpdate on mechanical resonances of CE BS with stiffener ring
Update on mechanical resonances of CE BS with stiffener ring is attached.
Attachment 1: eigen_freqs_merged.pdf
eigen_freqs_merged.pdf
  Draft   Sun Aug 4 09:01:01 2024 MichaelUpdateInterferometer SimulationsUpdate on SRC Mode Mismatch Analysis
An update on my analysis to minimize mode mismatch/scattering by introducing toroidal mirrors to the SRC.
Attachment 1: SRC_Mode_Mismatch_Update_8_2_24.pdf
SRC_Mode_Mismatch_Update_8_2_24.pdf
Attachment 2: SRC_Mode_Mismatch_Update_8-12-24.pdf
SRC_Mode_Mismatch_Update_8-12-24.pdf
  421   Tue Aug 6 13:07:07 2024 XuejunUpdateInterferometer Simulations 
[Xuejun]

The width and location of the measured in-air change in temperature profile has been determined to be 0.045m and 0.137m respectively. Subsequently, a fake irradiance profile was able to be generated that best resembled what the actual irradiance profile could be using this information for testing in COMSOL. The generated irradiance profile that output the most similar change in temperature profile as the measured in-air profile has been included as well as the change in temperature profile it produced on the blackbody screen "test mass" model in COMSOL.

Attachment 1: Thermal_model_image.png
Thermal_model_image.png
Attachment 2: generated_irradiance_profile.png
generated_irradiance_profile.png
  424   Mon Aug 12 17:09:04 2024 Cynthia UpdateInterferometer SimulationsO4 vs O5 cavity scans with ITM plume guess or ETM
So far the proposed solution for what to use for O5 ITM mirror for SIS simulations is either the plume guess file or using the O5 ETM mirror for ITM. I had ran a cavity scan for both of these possibilities and it seems like the results produced are fairly different. The next step is most likely moving on to adding the Frosti effects including both of the proposed possibilities, and before this, a few confirmations and verifications are needed using similar previous studies to make sure my code produce the right result.
Attachment 1: O5_plots_and_tables.pdf
O5_plots_and_tables.pdf
Attachment 2: O4_plots_and_tables.pdf
O4_plots_and_tables.pdf
Attachment 3: ETM12mapO5.png
ETM12mapO5.png
Attachment 4: Screenshot_2024-08-12_at_5.05.31_PM.png
Screenshot_2024-08-12_at_5.05.31_PM.png
  426   Mon Aug 19 07:11:55 2024 CynthiaUpdateInterferometer Simulationscavity scans with FROSTI effects
Attachment 1: LIGO_update_8_19.pdf
LIGO_update_8_19.pdf
  428   Mon Aug 26 14:42:04 2024 Cynthia UpdateInterferometer Simulationscurrent status on cavity scan with effects of FROSTI
I used the code and arm cavity model used for previous O5 study on mirrors and HOM (the pdf of the study and the result can be found at https://dcc.ligo.org/LIGO-G2100878), but it seems like the result I obtained is different from the study result. Since my cavity scans codes have a large portion of it relying on this code, I will have to go over the study result and the code to make sure there is no issue with that code itself first. There are also some other updates or issued encountered when I tried to plot the mirror maps with effects of FROSTI.
Attachment 1: LIGO_updates_8_26.pdf
LIGO_updates_8_26.pdf
  430   Tue Aug 27 18:37:40 2024 LukeUpdateInterferometer SimulationsRingheater model update
Updated the model to produce a more circular deformation in the HR surface. The first three attachments are from irradiance patterns gotten from ray tracing. The last is from a pre-defined irradiance pattern.
Attachment 1: Initial_1W.png
Initial_1W.png
Attachment 2: Increased_rays_100W.png
Increased_rays_100W.png
Attachment 3: Increased_rays_more_100W.png
Increased_rays_more_100W.png
Attachment 4: Initial_100W.png
Initial_100W.png
  436   Mon Sep 9 12:36:45 2024 MichaelUpdateInterferometer SimulationsUpdate on Analysis of Mode Mismatch Minimization in A#
I have taken a closer look at the solution curve in the mirror parameter space which I have searched, focusing on the "resilience" of specific points, with the plan to analyze how certain conditions of the interferometer change as we move along this solution curve.
Attachment 1: SRC_Mode_Mismatch_Update_9_9_24.pdf
SRC_Mode_Mismatch_Update_9_9_24.pdf
  439   Mon Sep 16 07:28:16 2024 LukeUpdateInterferometer SimulationsRing heater update
Attachment 1: 20240916_Ringheater_updates.pptx
  443   Mon Sep 16 15:18:59 2024 Cynthia UpdateInterferometer Simulationsa breakdown of FROSTI and thermal effects and the resulting cavity scan
Attachment 1: ligo_update_9_16_(1).pdf
ligo_update_9_16_(1).pdf
  444   Mon Sep 23 08:29:49 2024 LukeUpdateInterferometer SimulationsRingheater update

Ringheater Update

If the link does not work here is the file.

Attachment 1: 20240923_Update.pptx
  446   Mon Sep 23 15:00:41 2024 Cynthia UpdateInterferometer Simulationscorrections on assumption for O5 coating
The document recording ETM07 and ETM08 coating (T2300093) was discussed: the current plume files are not necessarily correct in a way that LIGO lab have tried to add it on uncoated ETM such as ETM07 and it does not match what the coated ETM07 would look like. the plume should be added on top of the uncoated ETM instead of assuming an ideal ETM. According to Garilynn, the imperfection on uncoated ETM matters. So far the possible ETM data used for O5, ETM 11,14,19, and 20 are all uncoated, and different ways could be used to predict the plume, including the plume data on LIGO dcc or subtract the uncoated data from the coated for O4 ETM and use that as another guessed plume.
Attachment 1: Uncoated_S1_ETM07-v2.pdf
Uncoated_S1_ETM07-v2.pdf
  454   Wed Oct 2 13:38:00 2024 CynthiaUpdateInterferometer Simulationscavity scan with averaged O4 ETM coating as plume
Attachment 1: O5plumevsCoating.png
O5plumevsCoating.png
Attachment 2: O5CoatAvgpt5.png
O5CoatAvgpt5.png
Attachment 3: O5AVgcoatingFROSTIpt5.PNG
O5AVgcoatingFROSTIpt5.PNG
  469   Wed Nov 6 13:48:55 2024 LiuUpdateInterferometer SimulationsQN modeling update
Slides
  2   Thu Jun 2 16:14:58 2022 JonHowToGeneralCustom conda environment on JupyterHub

Cross-linking instructions: How to run a Jupyter notebook in your custom Conda environment

  7   Mon Jul 11 14:29:45 2022 JonOmnistructureGeneralHEPA filter installed
Today I unpacked and installed the new HEPA filter for the lab. It is an Omni CleanAir OCA1210 capable of 1200 CFM. This flow rate is sufficient to turn over the air in the room once every 4 minutes, or 14 times per hour. Hopefully this will cut down on our particulate accumulation issues.
Attachment 1: IMG_1530.png
IMG_1530.png
  16   Mon Jan 23 17:26:15 2023 Peter CarneyUpdateGeneralOven cleaning
Aiden and Cao Turned on the oven to 120 deg C for 12 hours. After 12 hours, put it at 200 deg C for 48 hours.
  17   Thu Jan 26 18:58:25 2023 AidenUpdateGeneralOven Heating
Aiden cleaned the oven with methanol again and set the oven to 260 degC for 12 hours.
  18   Fri Jan 27 18:44:31 2023 Julian UpdateGeneralVacuum Chanmber Cleaning
I used the IPA wipes to wipe down the inside of the chamber the best I could. I cleaned the main chamber but not any of the connecting joints. When I finished I did a once over with a fresh wipe and found no residue.
  19   Fri Feb 3 13:04:04 2023 shaneSummaryGeneralclean room particle counts 1/25/23
Clean room count graphs for each zone (as of January 25, 2023) attached
Attachment 1: cleanroomcountsJan25.pdf
cleanroomcountsJan25.pdf
  22   Mon Feb 6 20:02:32 2023 JulianUpdateGeneralCleanroom Update
I wiped down the main table (including frame, legs, and transparent shelf) and workbench using alcohol wipes. Once I cleaned all of the surfaces, I used the Hepa vacuum to pick up any fallen debris.
  25   Fri Feb 10 15:15:30 2023 AidenUpdateGeneralBagging First Batch
Aiden Bagged and Tagged the first batch of stainless steel parts shown on the google spread sheet. 1. Removed two parts from the oven. 2. Place them in the ESD bag. 3. Seal bag with Kapton Tape. 4. Create label including part name and number underneath it. 5. Put label onto the side of the bag where it is not sealed with tape. 6. Placed bagged items into clean room on work table. ps. total bags in first batch = 4
  27   Sat Feb 11 00:17:27 2023 JulianUpdateGeneralVacuum Chamber Cleaning
Today I finished wiping down the rest of the vacuum chamber, specifically focusing on the connecting ports and outside surface of the chamber. When I was finished, I test wiped every surface of the chamber and took pictures confirming the current state of cleanliness; Attachment 1 "Wipes for top and bottom of chamber's upper lip." Attachment 2 " Top and bottom of chamber's lower lip." Attachment 3 "Inside and Outside main chamber." Attachment 4 "Inside connecting ports."
Attachment 1: 20230210_181404.jpg
20230210_181404.jpg
Attachment 2: 20230210_181424.jpg
20230210_181424.jpg
Attachment 3: 20230210_181541.jpg
20230210_181541.jpg
Attachment 4: 20230210_181606.jpg
20230210_181606.jpg
  28   Sat Feb 11 17:09:29 2023 ShaneUpdateGeneralclean room particle counts 2/10/23
Took a round of clean room counts after the latest clean of vacuum chamber on Feb 10. Used 60 second sample time, 5 samples for each of the 5 zones. Plots attached for both occupied clean room (one person inside, attachment 1) and unoccupied clean room (empty attachment 2), as well as the raw data from the particle counter (attachment 3).
Attachment 1: occupied2.10.23.pdf
occupied2.10.23.pdf
Attachment 2: unoccupied2.10.23.pdf
unoccupied2.10.23.pdf
Attachment 3: particlecounts2.10.23.PDF
particlecounts2.10.23.PDF
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2
Cleaned second batch of SS parts with liquinox for 20 min. Then put in oven for 5 steps; 1. Ramp, 100 degC, 15 min 2. Const, 100 degC, 30 min 3. Ramp, 200 degC, 30 min 4. Const, 200 degC, 48 hours 5. Ramp, 25 degC, (off).
  30   Fri Feb 17 19:12:39 2023 AidenUpdateGeneralClean and Bake batch 3
Bagged and Tagged batch 2 parts by placing no more than two parts per ESD bag then taped them with kapton tape and tagged them with their name and part number. Than placed them inside the clean room on the work bench. Total of 3 Bags used. For Batch 3- Cleaned all copper gaskets with liquinox for 10 minutes, dried them off with nitrogen, then placed into oven where the are currently undergoing the following steps; 1. Ramp to 100 deg C in 15 minutes. 2. Dwell at 100 degC for 30 minutes. 3. Ramp to 175 degC in 30 minutes. 4. Dwell at 175 degC for 24 hours. 5. Turn off and cool down to room temperature. To see the specific parts in batches 2 and 3 refer to the clean and bake data sheet. https://docs.google.com/spreadsheets/d/19gnv1q9l64gxnq76KfcXizbqShJfK0ayn2Js1SiAZok/edit?skip_itp2_check=true#gid=1549161924
Attachment 1: IMG_4126.jpg
IMG_4126.jpg
Attachment 2: IMG_4125.jpg
IMG_4125.jpg
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4
Bagged and Tagged batch 3 parts by placing no more than two part numbers per bag and taped them with kapton tape and labeled them with their name and part number. Then placed them in the clean room on the work bench. Cleaned batch 4 parts with liquinox and placed the into the oven for 5 steps; 1. Ramp to 100 degC in 15 minutes. 2. Dwell at 100 degC for 30 minutes. 3. Ramp to 200 degC in 30 minutes. 4. Dwell at 200 degC for 48 hours. 5. Turn off and cool down to room temperature. To see the specific parts in batch 4 please refer to the Clean and Bake spread sheet on the Richardson lab page: https://docs.google.com/spreadsheets/d/19gnv1q9l64gxnq76KfcXizbqShJfK0ayn2Js1SiAZok/edit#gid=1765414234
Attachment 1: IMG_4148.jpg
IMG_4148.jpg
Attachment 2: IMG_4147.jpg
IMG_4147.jpg
  32   Thu Feb 23 13:32:55 2023 ShaneUpdateGeneralClean room floor particle counts
Here are the counts from the clean room floor today. The counts should be dated- the ones from today (2/23/23) are the last 8 in the chart. The first set of 2 measurements from today were under the table by the clean room entrance, the next two were under the table by the vacuum chamber, the next two were on the floor by the vacuum chamber lid, and the last two were on top of the table for comparison. All measurements were taken using 2 minute sample time.
Attachment 1: 2.23.2023.pdf
2.23.2023.pdf
  33   Thu Feb 23 21:12:33 2023 JulianUpdateGeneralVacuum Chamber Cleaning
Today I was able to come in and wipe down both sides of the vacuum chamber lid using the regular alcohol wipes and also wipes that were left to dry in the fume hood then saturated with acetone. I managed to get a good amount of the residue off both the inside and outside surfaces of the lid, then did a test wipe of both sides using acetone-soaked wipes; pictures of the wipes are attached below. Once I finished with the lid, I used another acetone wipe to test wipe the inside of the vacuum chamber. The inside is still giving off residue, but very minimally, a photo for this is attached as well.
Attachment 1: ChamberLid_inside.jpg
ChamberLid_inside.jpg
Attachment 2: ChamberLid_outside.jpg
ChamberLid_outside.jpg
Attachment 3: VacuumChamber_inside.jpg
VacuumChamber_inside.jpg
  34   Mon Feb 27 17:09:04 2023 Pamella UpdateGeneralVacuum Chamber Cleaning
Pamella and Julian finished cleaning the interior of the chamber, chamber lid, and the table. We found some black residue on the side of the table but not sure what the issue is. A picture of the specific area of the table that is giving off the black residue is attached below. The next step from here would be to flip the chamber on its side and finish the cleaning the exterior.
Attachment 1: Side_of_Table.jpeg
Side_of_Table.jpeg
Attachment 2: Wipes_from_table.jpeg
Wipes_from_table.jpeg
  35   Tue Feb 28 13:53:17 2023 PamellaUpdateGeneralVacuum chamber cleaning
Pamella, Dr. Richardson and Dr.Cao finished checking and cleaning the interior of the chamber, chamber lid, and exterior of the chamber with Vectra Alpha wipes, IPA and in some parts we used acetone . We flip the chamber and put chamber on the table again. A picture of the specific situation is attached below. The next step from here would be to finish the cleaning the floor . The black residues on the side of the table probably is some reaction between the Vinil and the wipes so is not necessary cleaning this part deeply.
Attachment 1: EE5E0296-D362-4EA6-B482-85A629D93B46.jpeg
EE5E0296-D362-4EA6-B482-85A629D93B46.jpeg
Attachment 2: 4C0AA805-667E-45AD-8704-03389BD63489.jpeg
4C0AA805-667E-45AD-8704-03389BD63489.jpeg
Attachment 3: 51CE3D1E-F48E-4F57-8450-8F58C27154BB.jpeg
51CE3D1E-F48E-4F57-8450-8F58C27154BB.jpeg
Attachment 4: 58ADE656-52AD-4F0E-88BA-B993F977A519.jpeg
58ADE656-52AD-4F0E-88BA-B993F977A519.jpeg
  38   Tue Feb 28 19:37:22 2023 AidenSummaryGeneralClean and Bake batch 5
Bagged and Tagged batch 4 parts by placing no more than two part numbers per bag and taped them with kapton tape and labeled them with their name and part number. Then placed them in the clean room on the work bench. Cleaned batch 5 part (Viton O-Ring) with liquinox and placed the into the oven for 5 steps; 1. Ramp to 100 degC in 15 minutes. 2. Dwell at 100 degC for 30 minutes. 3. Ramp to 180 degC in 30 minutes. 4. Dwell at 180 degC for 48 hours. 5. Turn off and cool down to room temperature. To see the specific parts in batch 5 please refer to the Clean and Bake spread sheet on the Richardson lab page: https://docs.google.com/spreadsheets/d/19gnv1q9l64gxnq76KfcXizbqShJfK0ayn2Js1SiAZok/edit#gid=1765414234 Hand cleaned stainless steel containers and silver coated screws. Designated each container with its contents with the label maker and placed inside the clean room. Should be noted that the fasteners were very clean before the hand cleaning and showed not dirt on the wipes. Added these parts to the clean and bake data base sheet and designated the type of cleaning as "rough cleaning". Gabriella helped with this cleaning and today was her first day in the lab.
Attachment 1: IMG_4168.jpg
IMG_4168.jpg
Attachment 2: IMG_4169.jpg
IMG_4169.jpg
Attachment 3: IMG_4170.jpg
IMG_4170.jpg
  41   Thu Mar 2 20:53:56 2023 JulianUpdateGeneralCleanroom Update
Today Pamella and Julian began the final cleaning of the cleanroom, starting with the HEPA vacuuming and mopping then wiping down every surface of the laser table. We wiped the main tabletop as well as the legs, but we were unable to completely wipe down the upper frame of the table before we had to leave. For next steps, Julian will come in on Friday and finish cleaning the frame, then both of us will come in on Monday to finish the final cleaning.
  42   Fri Mar 3 19:13:33 2023 AidenSummaryGeneralClean and Bake Batch 6
Started to clean the dirtiest of the valves. I could not finish but I definitely made good progress on it. The MDC valve is very dirty and there are many places I could not reach with my fingers. I used Acetone and IPA for this first round of cleaning on it. I also was going to bag the viton O-Ring from the previous Batch, however it seems to have broken during the bake and I am leaving it inside the oven for now.
Attachment 1: IMG_4173.jpg
IMG_4173.jpg
Attachment 2: IMG_4174.jpg
IMG_4174.jpg
  43   Sat Mar 4 00:34:46 2023 JulianUpdateGeneralCleanroom Update
Today I was able to finish cleaning the frame of the laser table, and for good measure I wiped down the tabletop and exterior of the vacuum chamber when I was finished. I was also able to go through and wipe down the bags containing the vacuum parts as well as the tabletop of the workbench.
  44   Mon Mar 6 15:32:58 2023 JonInfrastructureGeneralCabinet installation completed

Jon, Cao, Peter

This morning Facilities delivered and installed two new cabinets with sliding glass doors.

The smaller of the two (36" W x 13" D x 84" H) has been installed in the Clean & Bake area adjacent the flow bench. The larger one (48" x 16" D x 84" H) has been installed in the back of the room next to the electronics bench. Both cabinets have been securely anchored to the wall in two places each for earthquake safety.

We also installed the sliding glass doors and leveled them. However, we have not installed any of the shelves yet because the cabinets are quite dirty from the installation. Everything needs to be wiped down with IPA wipes, and it will be easier to do that before the shelves are in place.

Attachment 1: IMG_0088.jpg
IMG_0088.jpg
Attachment 2: IMG_0089.jpg
IMG_0089.jpg
  45   Mon Mar 6 18:48:43 2023 PamellaUpdateGeneralCleanroom update
Today Pamella and Julian finished cleaning of the new lab cabinets. Also we wiped the computer and put inside the cleanroom so now the computer is not move out side anymore. We saw some dirty parts in the cleanroom floor again and is possible for the next step we should be clearing the floor one more time. Possible is necessary order more IPA wipes for keep cleaning in nexts weeks. A photos of the cabinets and the computer are attached below.
Attachment 1: 203863E0-106A-465E-8D9C-461B0358FB60.jpeg
203863E0-106A-465E-8D9C-461B0358FB60.jpeg
Attachment 2: 779F360D-CAD0-4C49-AE0B-973F97F6D099.jpeg
779F360D-CAD0-4C49-AE0B-973F97F6D099.jpeg
Attachment 3: 276B9F0C-6661-441F-AD34-D79DA61E1FC3.jpeg
276B9F0C-6661-441F-AD34-D79DA61E1FC3.jpeg
  47   Wed Mar 8 19:29:00 2023 AidenSummaryGeneralClean and Bake batch 7
Today gave another cleaning to the MDC gate valve. It is still very dirty an will need more cleaning. I also cleaned the other 3 valves and the argon leak. These are also in bags inside the clean room. I cleaned them by hand with IPA wipes and had to specifically give the MDC up to air valve a harder clean with acetone as it was not getting clean with the IPA. This valve still has a ring around the face as shown in the first image. Be very cautious when moving the parts in the large ESD bag, it may be heavy and the parts will move inside.
Attachment 1: IMG_4180.jpg
IMG_4180.jpg
Attachment 2: IMG_4182.jpg
IMG_4182.jpg
  49   Thu Mar 9 13:51:42 2023 ShaneUpdateGeneralClean room counts 3/9/23
Here's the clean room counts from this morning. Also attached is rough diagram of where the five zones are in the clean room. Counts taken with 2 minute sample time, three samples in each zone.
Attachment 1: particlecounts3.9.23.pdf
particlecounts3.9.23.pdf
Attachment 2: clean_room_zones.JPG
clean_room_zones.JPG
  51   Tue Mar 14 18:21:41 2023 AidenSummaryGeneralClean and Bake batch 8
Starting off Peter and I refilled the deionized water barrel. Then Aiden Cleaned and Bake the FROSTI arms and bases in liquinox for 5 minutes. Then placed them in the oven where they will undergo the following steps; 1. Ramp to 100 degC in 15 min. 2. Dwell at 100 degC for 30 min. 3. Ramp to 120 degC in 30 min. 4. Dwell at 120 degC for 48 hours. 5. OFF Also cleaned the 2.75 MDC Gate valve for 20 minutes (10 minutes each side) in liquinox. It looks significantly cleaner in areas I could not reach before. However some areas like the flat bottom threaded holes are still very dirty. I also made sure to dry it thoroughly and wrapped it in UHV foil until I further cleaning is decided.
  52   Fri Mar 17 19:46:39 2023 AidenSummaryGeneralClean and Bake batch 9
Bagged and Tagged the reflector arms and bases and placed them inside the clean room. Total of 2 bags used. Cleaned and Baked parts in batch 9 on the spread sheet and used the following procedure; 1. Ramp to 100 degC in 15 min. 2. Dwell at 100 degC for 30 min. 3. Ramp to 200 degC in 30 min. 4. Dwell at 200 degC for 48 hours. 5. OFF Also soaked the 2.75" CF gate valve in acetone to try and clean the open threads around the part. Then cleaned it in the ultrasonic washer with liquinox for 20 minutes (10 minutes each side). It looks better than it used to but the threads still seem to be the problem and will probably need even further cleaning.
Attachment 1: IMG-4208.jpg
IMG-4208.jpg
Attachment 2: IMG-4209.jpg
IMG-4209.jpg
  54   Wed Mar 22 15:25:00 2023 ShaneUpdateGeneralClean room recertification particle counts
Attached are the five zone particle measurements for the clean room now that the fan speeds have been set to MEDIUM. 2 min sample time, 3 samples per zone. The occupied clean room measurements were unusual in that they generally got larger towards minute 6 instead of settling and going to zero, and for this reason didn't stay beneath the class 5 requirement at the end of the samples. The unoccupied counts look more similar to what was expected, and generally settle under the class five requirement.
Attachment 1: counts3.22.23.pdf
counts3.22.23.pdf
  55   Thu Mar 23 18:40:08 2023 JulianUpdateGeneralCleanroom Update
Today Pamella and I came in to Hepa vacuum and mop the floor of the cleanroom for general maintenance.
  57   Fri Mar 24 13:36:17 2023 PamellaUpdateGeneralClean and Bake batch 10
Today I bagged and tagged batch 10. I wiped the RGA vacuum component for around 25 minutes after that I bagged and tagged this part and put inside the cleanroom. The RGA vacuum component have a big size and because off that i used the big bag. I wiped one power cable (2 meters), bagged and tagged that and inside the cleanroom. For the parts in the oven, a bunch of screws, I bagged and tagged the screws and put inside the cleanroom. I put photos below about this process.
Attachment 1: 260AEB73-02D0-4635-93B3-B2EB3269FB84.jpeg
260AEB73-02D0-4635-93B3-B2EB3269FB84.jpeg
Attachment 2: 59FD199A-A444-439A-8D51-C242B65BBECD.jpeg
59FD199A-A444-439A-8D51-C242B65BBECD.jpeg
Attachment 3: 9A48A0EE-5EFE-409D-ACC0-17011F6F7EBF.jpeg
9A48A0EE-5EFE-409D-ACC0-17011F6F7EBF.jpeg
Attachment 4: 950F85B7-D304-4724-AB3D-B606E422F1E3.jpeg
950F85B7-D304-4724-AB3D-B606E422F1E3.jpeg
  59   Fri Mar 31 14:23:13 2023 PamellaUpdateGeneralClean and bake batch 11
Today I bagged and tagged batch 11. I wiped the some tools: Centering ring alum( 2 pieces), reversible ratcheting, gasket removal (CF). After wiped that I bagged and tagged this parts and put inside the cleanroom. Also I wiped one power cable (3 meters), bagged and tagged that and inside the cleanroom. I put photo below.
Attachment 1: 4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg
4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg
  60   Mon Apr 3 17:04:05 2023 AidenSummaryGeneralIDP Scroll Pump Assembly
Aiden installed the isolation valve and the exhaust silencer kits on the IDP-3 Scroll pump. The entire assembly still needs to be wiped down but overall no residue came off when putting on the kits.
Attachment 1: IMG_4244.jpg
IMG_4244.jpg
  66   Fri Apr 7 09:48:09 2023 PamellaUpdateGeneralClean the system parts
Pamella and Julian wiped and tag system parts for the vacuum machine. We used isopropyl and vectra wipes in the most import pieces: Inverted magnetron pirani gauge and the air cooling kit 81. The other parts we uses the IPA wipe for cleaning. So for now we finished with ever system parts which was in the gabinetes. I put photos below. The photos is for all part we cleaning, tag and which puted inside the cleaning room.
Attachment 1: 645E597D-AEA6-4669-B967-08C82AA84D13.jpeg
645E597D-AEA6-4669-B967-08C82AA84D13.jpeg
Attachment 2: 2669F0AC-69BC-422B-8723-AD047F3EBEB6.jpeg
2669F0AC-69BC-422B-8723-AD047F3EBEB6.jpeg
Attachment 3: 7731FE17-EDD2-46B4-B6E1-546531D98EC3.jpeg
7731FE17-EDD2-46B4-B6E1-546531D98EC3.jpeg
Attachment 4: F8921950-63C3-4E03-B79E-0A4C8EDB8EF6.jpeg
F8921950-63C3-4E03-B79E-0A4C8EDB8EF6.jpeg
Attachment 5: AA9374DB-377C-48BD-866B-D686AF945D09.jpeg
AA9374DB-377C-48BD-866B-D686AF945D09.jpeg
Attachment 6: B3CE9D1E-A01E-4747-9F01-D427097F340C.jpeg
B3CE9D1E-A01E-4747-9F01-D427097F340C.jpeg
Attachment 7: BAE63151-D3D1-41D9-881E-B6175544811C.jpeg
BAE63151-D3D1-41D9-881E-B6175544811C.jpeg
  68   Tue Apr 11 17:56:15 2023 PamellaUpdateGeneralLab cleaning
Today Pamella and Julian finished cleaning of the cleanroom, starting with the HEPA vacuuming, mopping and clearing all floor with IPA wipes. Also we wiped down some surfaces of the blue table, computer table and the top of chamber.
  69   Wed Apr 12 10:53:02 2023 AidenSummaryGeneralValve Cleaning
Bagged and Tagged the parts from batch 10 and placed them inside the clean room. Then cleaned the last gate valve in liquinox for 20 minutes (10 minutes each side). Then dried the valve, bagged, tagged, and placed it inside the clean room.
ELOG V3.1.3-7933898