  292   Fri Dec 15 14:03:02 2023 AidenHowToVACVacuum Chamber Opening[Aiden]

1. Turn off the RGA filament
and disconnect it.

2. Record the pressure
and then close the angle valve and gate valve
  
  293   Sun Dec 17 19:43:18 2023 AidenUpdateVACVac Heating Update[Aiden]

I measured the temperature of
the flanges where some of the electronics
will go and I found that the RGA flange was
  
  295   Mon Dec 18 15:51:49 2023 AidenUpdateVACVAC System Heating UpdateAfter letting the chamber cool down I put
the electronics back on and turned the RGA
element back on. No data has been taken yet
  
  296   Tue Dec 19 15:45:05 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook RGA data for the macor parts inside of
the chamber. With the Ar open the HC levels
read 30 torrl/s which is around where it
 bake9_231219_Macor_ArO.pngbake9_231219_Macor_ArC.png 
  301   Tue Jan 9 16:35:09 2024 AidenUpdateVACVAC System Leak and Heating[Luis, Luke, Aiden]

Leak tested each
flange and weld and only found two flanges
to have noticeable leaks with the electron
  
  306   Tue Jan 16 16:11:41 2024 AidenUpdateVAC [Aiden,Luis]

Below is the data for the
most recent bake. I believe the chamber is
cleaner than it is actually showing as the
 bake10_240116_Elements_ArO.pngbake10_240116_Elements_ArC.png 
  308   Thu Jan 18 15:13:37 2024 AidenUpdateVACVAC Heating System Update[Aiden]

Took more data today and the
chamber and elements are showing an even
lower HC level than we have gotten before.
 bake10_240118_Elements_ArO.pngJanuary_18_Ar_Open_Elements_Analyzed.png 
  314   Fri Feb 2 19:08:20 2024 AidenUpdateVAC1st Hot Element RGA ScanHere are the measurements for the RGA scan
of the elements while on at around 160C.
The pressure of the chamber during the test
 bake10_240202_Elements_ArC.pngbake10_240202_Elements_ArO.png 
  316   Mon Feb 5 14:17:52 2024 AidenUpdateVACHeater Element RGA ScanHere are the new RGA scans for the powered
Heater elements. The pressure at the time
of taking data was 2.88 e-8 torr. The HC
 bake10_240205_Elements_ArO.pngbake10_240205_Elements_ArC.png 
  319   Thu Feb 8 17:37:48 2024 AidenUpdateVACHeater Element RGA ScanTook more RGA data now that the heaters are
powered by 18V. The pressure of the system
during the data taking was 3.8 e-8 torr.
 bake10_240208_Elements_ArO.pngbake10_240208_Elements_ArC.png 
  320   Mon Feb 12 17:35:47 2024 AidenUpdateVACHeater Element RGA ScanTook more RGA data before and after increasing
the heater elements to 300 degC and before
heating them up.

 bake10_240212_Elements_ArO.pngbake10_240212_Elements_ArC.pngbake10_240212_Elements_300C_ArC.png 
  325   Tue Feb 13 12:34:04 2024 AidenUpdateVACVAC Heating System UpdateHere is an overlay with for all the heating
steps done with the heater elements.
 bake10_240118_Elements_ArO.png 
  327   Fri Feb 16 18:37:28 2024 JonUpdateVACBake ended 6:23 pmI ended the bake of the UHV system (that
began on Monday) at 6:23 pm today by switching
OFF both PID controllers. The heaters elements
  
  328   Mon Feb 19 14:17:50 2024 AidenUpdateVACHeater Element RGA ScanThree days after the completion of Bake 11,
the Heater elements RGA scan looks much cleaner.
The HC level is back down to 33 e-10 torrl/s
 bake11_240219_Elements_ArO.png 
  335   Thu Feb 22 21:48:16 2024 JonUpdateVACVacuum vent for RGA testing of reflector[Jon, Tyler, Luke, Aiden]
Summary
Following
Wednesday's cleanroom cleaning [333],
we proceeded to vent the vacuum chamber,
 IMG_0938.pngIMG_0939.png 
  348   Fri Mar 15 16:58:55 2024 AidenUpdateVACVacuum Chamber Frosti Testing[Luke, Luis, Aiden]

On Thursday, March
14 - Took preliminary RGA scans of the empty
chamber to compare later on. Vented the chamber
 bake12_240314_Empty_ArC.pngbake12_240314_Empty_ArO.png 
  367   Mon May 13 14:48:27 2024 AidenUpdateVACNew Vacuum Chamber DesignI created a new model for the vacuum chamber
based on the ideas from last week's meeting.

It
should be noted that we can not have the
 VaccumChamberAssembly__Redesign_v5.jpg 
  372   Mon Jun 3 09:24:48 2024 AidenUpdateVACVacuum Chamber RenderingHere is a new render of the vacuum chamber
that includes the 2.75 tee to place the Argon
leak right next to the RGA. The conical reducer
 VaccumChamberAssembly__Redesign_with_tee.jpgVaccumChamberAssembly__Redesign_with_tee_top.png 
  384   Tue Jun 25 17:19:42 2024 LukeUpdateVACVacuum chamber leak checking Currently our main leak is in the RGA line.
We found this by closing the gate valve from
the main volume to see if which side was
 image_2024-06-25_170036021.pngimage_2024-06-25_170057738.pngimage_2024-06-25_170120030.pngimage_2024-06-25_171238788.png 
  386   Wed Jun 26 16:39:34 2024 LukeUpdateVACVacuum chamber leak checking On Tuesday I had isolated the main volume
and let it pump down over-night. Today, Wednesday,
I checked it and it had only gone down by
 image_2024-06-26_162539705.pngimage_2024-06-26_162601616.png 
  390   Fri Jun 28 18:15:16 2024 LukeUpdateVACVacuum chamber We will be configuring the RGA line to
remove the spherical cube from the system.
Currently our plan for the new design is
  
  400   Wed Jul 10 17:31:07 2024 LukeUpdateVACRGA line disassembly and upgrade [ Luke, Cynthia, Michael, Xuesi, Anthony
]
Started work around 12:45
 image_2024-07-10_172112210.pngimage_2024-07-10_172431863.pngimage_2024-07-10_172603090.pngimage_2024-07-10_172823966.png 
  401   Thu Jul 11 15:53:39 2024 LukeUpdateVACRGA line upgrade [ Luke, Jon ]
Started work at 11:00
As mentioned in my previous post
 image_2024-07-11_154630323.pngimage_2024-07-11_154818191.pngimage_2024-07-11_154902840.png 
  405   Mon Jul 15 13:30:49 2024 Luke UpdateVACProblem with 2.75" to 1.33" zero length reducer Last Friday while checking the depth of the
ZLR I got one of the screws stuck. Today
I tried a couple things to get it out. First
 IMG_1882.jpg 
  411   Mon Jul 22 18:19:34 2024 LukeUpdateVACZero length reducer stuck boltsToday, I borrowed a bolt extractor drill
bit from the machine shop to remove some
stuck bolts from the zlr. Before starting,
 image_2024-07-22_181607501.pngimage_2024-07-22_181632965.png 
  425   Fri Aug 16 12:51:46 2024 Luis MartinUpdateVACUpdate on vacuum chamber status[Luis, Luke, Tyler]

Vacuum chamber parts were finally
received and assembled. After whipping down
 IMG_1910.HEICIMG_1911.HEICIMG_1909.HEICIMG_1912.HEIC 
  427   Fri Aug 23 16:08:32 2024 LukeUpdateVACRGA line leak testing[Luke, Luis, Jon, Tyler]
On the 22nd Dr. Richardson showed
Luis, Tyler and I how to preform a leak test
  
  429   Tue Aug 27 15:01:26 2024 LukeUpdateVACRGA line leak testing[Luke, Tyler]
On the 27th Tyler and I ran the RGA
leak test again with the electron multiplier
  
  431   Thu Aug 29 16:39:34 2024 LukeUpdateVACPhotos of heater tape   6x 
  432   Sun Sep 1 16:17:40 2024 LukeUpdateVACVacuum chamber leak checking and re-applying heating tape[Luke, Luis, Cinthia, Michal, Tyler]
On the 26th Cinthia, Michal, and
I took off the insolation on the vacuum chamber
  
  433   Tue Sep 3 15:52:56 2024 LukeUpdateVACHeater tape initilization [Luke, Tyler, Jon]
On the 3rd we set up the pid controllers
for the heater tapes and after putting on
  
  435   Fri Sep 6 14:34:52 2024 Luke UpdateVACHeating tape workOn the 5th I had tried to start baking
the vacuum chamber however certain parts
of the chamber were getting too hot and causing
  
  438   Mon Sep 9 21:02:37 2024 LukeUpdateVACSteadystate temperature of flangesI measured the temperature of the flanges
and reconnected the RGA turning on its filament.
I then turned off the PID controllers.
  
  440   Mon Sep 16 13:51:23 2024 Luis MartinUpdateVACRGA Scans



   
    


 2024-09-11_PostBake1_ArO.png2024-09-13_PostBake1_ArO.png2024-09-16_PostBake1_ArO.png 
  448   Wed Sep 25 09:06:09 2024 Luis MartinUpdateVACRGA Scans



   
    
 24overlay.png24overlayNormalized.png 
  459   Wed Oct 16 13:58:59 2024 Luis MartinUpdateVACRGA ScanThe following figure displays data acquired
on 10/09, and it shows that we are no longer
below the cleanliness standard. Also, the
 2024-10-09_PostBake1_ArO.png 
  462   Wed Oct 23 11:48:06 2024 Luis MartinUpdateVACLeak Test Results[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself
ran a leak test, the results are displayed
  
  463   Wed Oct 23 12:08:36 2024 Luis MartinUpdateVACRGA Scan[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself
ran a RGA scan, the results are displayed
 2024-10-22_PostBake1_ArO.png 
  468   Tue Nov 5 11:08:40 2024 Luis MartinUpdateVACISO Test
    [Luis, Luke, Ma Michael]
    
        The isolation test
was conducted on the vacuum system. Every
  
  474   Tue Nov 19 17:10:34 2024 Luke UpdateVACLeak checkChamber temperature: 23C
Chamber Initial Pressure: ~1.8e-8
main, ~3.5e-8 rga
 image.pngIMG_5116.jpegIMG_5117.jpeg 
  476   Wed Nov 20 12:31:24 2024 LuisUpdateVACLeak test RGA Scan after vacuum repairs[Luke, Luis]
After the gasket replacement performed
on Monday (11/18/24) we let the vacuum pump
 2024-11-20_PostBake1_ArO.png 
  11   Mon Oct 3 17:21:39 2022 CaoUpdateTCSInspection of macor partsThe macor parts arrived and inspected today.
These include:


 Macor spacer
(drawing:  LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf
 7x 
  173   Thu Jul 27 10:18:43 2023 CelesteUpdateTCSGraphical Updates to HOM RH ModificationAttached are updated graphs of the irradiance
distribution from the 1/8th ring heater units
(extruded and reduced in length). 
 HOM_RH_1_8_Unit_Modification_Graphs.pdf 
  180   Fri Jul 28 17:45:45 2023 CelesteUpdateTCSGraphical Updates to HOM RH Modification, Friday 7/28Updated 1/8th Heater simulation modification
graphs. Slides 7, 10, 16-19 are new additions.
 HOM_RH_Simulation_Progress.pdf 
  187   Tue Aug 1 16:22:35 2023 CelesteUpdateTCSGraphical Updates to HOM RH Modification, Tuesday 8/1Slides 20-33 are newly added (data/graphs
from parameter sweep feature-1/8th heater
unit length varied from 10% of original to
 HOM_RH_Simulation_Progress_80123.pdf 
  200   Thu Aug 10 14:13:38 2023 CelesteUpdateTCS8/10/23, Simulation Graphical Progress   Simulation_Progress__8_10_23.pdf 
  204   Fri Aug 11 10:57:20 2023 CelesteUpdateTCS8/11/23 Simulation Progress   Simulation_Progress__1_32nd_Model_(1).pdf 
  209   Tue Aug 15 16:10:06 2023 CelesteUpdateTCS8/15/2023 Simulation Progress   Simulation_Progress__1_32nd_Model_(2).pdf 
  291   Mon Dec 11 16:20:17 2023 JonSummaryTCSFROSTI Assembly ProcedureBelow is the procedure we will follow to
assemble the FROSTI prototype.

Install SS guide rods and
  
  341   Mon Feb 26 21:23:27 2024 JonUpdateTCSFROSTI Assembly - Day 1[Jon, Tyler, Luis, Luke, Mohak, Cynthia, Michael,
Aiden]
FROSTI assembly began today. After
a final set of RGA scans were taken, the
 7x 